NUREG-1174, Summary of CRGR Meeting 163 on 890524 Re Proposed Generic Ltr on Emergency Response Data Sys,Usi A-17 on Sys Interactions,Generic Issue A-30 on safety-related Dc Power Sys & USI A-47 on Control Sys

From kanterella
(Redirected from NUREG-1174)
Jump to navigation Jump to search
Summary of CRGR Meeting 163 on 890524 Re Proposed Generic Ltr on Emergency Response Data Sys,Usi A-17 on Sys Interactions,Generic Issue A-30 on safety-related Dc Power Sys & USI A-47 on Control Sys
ML20246E497
Person / Time
Issue date: 06/21/1989
From: Jordan E
Committee To Review Generic Requirements
To: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
REF-GTECI-048, REF-GTECI-049, REF-GTECI-128, REF-GTECI-A-17, REF-GTECI-A-30, REF-GTECI-A-47, REF-GTECI-EL, REF-GTECI-NI, REF-GTECI-SY, RTR-NUREG-1174, RTR-NUREG-1217, RTR-NUREG-1218, RTR-NUREG-1229, TASK-048, TASK-049, TASK-128, TASK-48, TASK-49, TASK-A-17, TASK-A-30, TASK-A-47, TASK-OR NUDOCS 8907120264
Download: ML20246E497 (2)


Text

_-

J ts e

jonc o

'o, UNITED STATES

  • [}'

iA m i NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20$$5 t

% . .%.../ June 21, 1989 MEMORANDUM FOR: Victor Stello, Jr.

Executive Director for Operations FROM: Edward L. Jordan, Chairman Committee to Review Generic Requirements

SUBJECT:

MINUTES OF CRGR MEETING NUMBER 163 The Committee to Review Generic Requirements (CRGR) met on Wednesday, May 24, 1988 from 1:00 - 5:00 p.m. A list of attendees for this meeting is attached (Enclosure 1). The following items were addressed at the meeting:

1. G. Zech (AEOD) presented for CRGR review a. proposed generic letter to provide information to licensees on the design and implementation policy for the Emergency Response Data System, and'to request voluntary participation by licensees. The Committee recommended in favor of issuing the proposed generic letter. This matter is discussed in -

Enclosure 2.

2. R. Baer (RES) and D. Thatcher (RES) presented for CRGR review the roposed final resolution for Unresolved Safet p' Systems Interaction in Nuclear Power Plants."y Issue (USI) A-17, The Committee recommended in favor of approval of the proposed resolution including issuance o.f a proposed implementing minormodifications.ggenericlettertolicensee,s,subjecttoanumberof to the wording of the package (to be coordinated with theCRGR. staff). These matters are discussed in Enclosure 3.

3.

R. Baer (RES) and D. Thatcher (RES) presented for CRGR review the proposed resolution for integrated GI-128, which includes and combines GI A-30 (Adequacy of Safety-Related DC Power Supplies), GI-48 (LCOs for Class 1E l

Vital Instrument Buses), and GI-49 (Interlocks and LCOs for Class 1E Tie Breakers). The Committee recommended in favor of approval of the proposed resolution, including issuance of two 50.54(f) generic information request letters to licensees, subject to a number of minor modifications to the wording of the package (to be coordinated with the CRGR staff). This matter is discussed in Enclosure 4.

4. R. Baer (RES) and A. Szukiewicz (RE5) presented for CRGR review the proposed final resolution for USI A-47, " Safety Implications of Control Systems in LWR Nuclear Power Plants." The Committee recommended in favor of approval of the proposed resolution, including issuance of a proposed implementing generic letter to licensees, subject to a number of changes to the wording of the package. The changes to the package are to be reviewed by the Committee prior to final issuance of the proposed resolution and implementing generic letter. This matter is discussed in Enclosure 5.

j

$0"kOhohhhObkbR

""""  % / f

{ neb FILE CENTER COPY

i U~ a

.- .re

.c. i .- .

As a general collateral recommendation related to the above items, the

Committee. recommended (a) that NRR issuance of the USI-related. generic letters and their respective response dates be staggered since all three impact electrical and instrumentation engineering support, and (b) that NRR act to eliminate discrepancies between issuance date and mailing date for generic letters, since schedules specified for actions refer back to the issuance dates of the generic letter.

In'.accordance with the ED0's July 18, 1983 directive concerning " Feedback and Closure on CRGR reviews, a written response is required from the cognizant-office to report agreement or disagreement with the CRGR recommendations in these minutes. The response, which is required within five working days after receipt of these minutes, is to be forwarded to the CRGR Chairman and if there is disagreement with.CRGR recommendation.s, to the ED0 for decisionmaking.

Questions concerning these meeting minutes should be referred to Jim Conran (492-9855).

Original sion.d og E. L Jorden Edward L. Jordan, Chairman Committee to Review Generic Requirements

Enclosures:

As' stated cc/w enclosures:

Commission (5)

SECY J. Lieberman P. Norry M. Malsch Regional Administrators CRGR Members Distribution: (w/o enc.)

tCentral Filec- L. Spessard (w/ enc.)

PDR(NRC/CRGR) E. Rossi (w/ enc.)

S. Treby W. Houston (w/ enc.)

W. Little G. Zech (w/ enc.)

M. Lesar R. Baer (w/ enc.)

P. Kadambi (w/ enc.) E. Jordan (w/ enc.)

CRGR CF (w/ enc.) J. Heltemes (w/ enc.)

CRGR.SF (w/ enc.) J. Conran (w/ enc.)

M. Taylor (w/ enc.) C. Sakenas (w/ enc.)

n

-OFC  : CRGR:AEOD : :C/C  :  :  :  :

AEN' :DD

.Q) .

W . x .

p NAME~ :Konran: cg : C ltemes : E d  :  :  :  :

...___...._..______.___...._____.......f..n..... ___________....____..___.______----__:........--__

DATE : 6/2 //89  : 6M/89 : 6/p /89 :  :  :  :

OF'FICIAL RECORD COPY

. _ _ _ _