NRC-90-0091, Requests Relief from Commitment to Perform 100% Audits of Tech Spec Line Items.Tech Spec Improvement Program Has Been Completed Which Provides Extensive Review of Tech Spec Line Items
| ML20055D968 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/02/1990 |
| From: | Orser W DETROIT EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-90-0091, CON-NRC-90-91 NUDOCS 9007100208 | |
| Download: ML20055D968 (2) | |
Text
.....
(
)
3 l j -m l
- h y"*N;fy*lm n, l
9*i Detroit:
1 Edison EsnP 34ggp 3"as.
j 2
U. S. )bclear Regulatory Ccm nission Attention: Docunent Control Desk -
Washington, D.C. 20555
References:
1). Fermi 2
)
NIC Docket No. 50-341 NIC License No.' tFF-43
)
- 2) NIC Inspection Report No..50-341/86011, dated June 13, 1986 i
- 3) NIC Inspection Report No.- 50-341/87028, dated October 16, 1987-
- 4) Detroit Mison letter NIC-88-0237, i
dated October 18,>1988-j
- 5) NIC letter dated August 24,1989 j
Subject:
Deletion of 100% Audit Coverage of '14chnical Aneification Line Itane 1
1 In April 1986, NIC Inspection.86011, Open ' Item No. 4, statedi that.
Fermi-2 did not' have 'a documented policy for the ' time' frame in\\which to couplete 100% audit coverage of. the Technical Specification line items. ~ Subsequently, Detroit Mison developed a program and revised' the applicable procedures to establish a five year' tine frame.in which.
to couplete such -audits. The five year time frame began with' fuel' loading in March of 1985.
In August.L986, Detroit Mison developed a Technical Specification Line Item Matrix which would enable management to assign' and track.the -
Technical ~ Specification line items for audit purposes. Approximately-three man.nonths were spent on this effort..
.The first Technical Specification line item audits began in June.
1987. The first five year cycle was conpleted'in March 1990.. During s
' that cycle of audits, tha audit program did not identify any violation:
~ f the Technical Specification' sections 2,- 3 and 4 itens. In 1989 o
'alone, Detroit Mison spent in excess of 3770 man hours conducting
'1%chnical Specification line item audits. During the five year cycle approximately 15,000 man hours were spent with no significant findings.
~
p0
.,I y
- 9007100208'900702' F
cPDR' ADOCK 05000341
,(
.j W i PDC' 3
9 :'
l
=.. -..,. - -. -... -
.. ~.
d.'.
- 4.,
x
[
.N 1U. S. !bclear Regulatory Ccmnission1 c,3 c.
i NIC-90-0091.
July 2,L1990-Page 2L The commitment to audit 100% of'all'the' Technical Specification line items every five years has required significant Quality Assurance. (@)
resources. Rather than adhere to a strictly prescribed j
conpliance-based schedule, m should have the flexibility to focus audits in suspecta5 weak performance, areas or.on;ites significantly i
affecting plant' safety and reliability.
-j
! Our preference 1is.t'o continue to inplement 'our performance-based.
. mditing techniques.. The performance-based auditing was intrcduced by the' Nic with NURIE/CR-5151 in' June 1988. This audit concept provides
- nuch more benefit for' the effort expended' than a purely.
~
t conpliance-based' audit which -is characteristic of the Technical E
. Specification line item audits.
In October l1988, a request was submitted to the NIC to grant relief ifrom the'100% audit of Technical Specification line' items.- This.
request was' subsequently. denied.. However, since-this request has;been made,. there has been increased emphasis on performance-based.
auditing..In addition, Detroit Edison's Technical Specification
'Inprovenent' Program has been coupleted which provided. an extensive -
J review 'of. the Technical Specification.line items. --
l-Detroit Edison has concluded that the Technical Specification line -
item audits have provided little or no benefits and ~is: contrary to
. performance-based auditing. This lack'of. benefit was discussed with NIC (Division of Beactor Safety) personnel'at the Great Lakes @
i Managers neeting in May'1990. They suggested, that Detroit Edison l
resubmit the request to be grante3 relief.from the commitment to:
perform 100% audits of the Technical; Specification ~'line.-items.
-j 1
If you ham any questions, please contact Mr. Joseph Pendergast',
Coupliance Engineer, at -(313) 586-1682.