NRC-88-0032, Monthly Operating Rept for Jan 1988

From kanterella
(Redirected from NRC-88-0032)
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1988
ML20149H776
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/31/1988
From: Anthony P, Orser W
DETROIT EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CON-NRC-88-0032, CON-NRC-88-32 NUDOCS 8802220099
Download: ML20149H776 (5)


Text

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY P. M. Anthony g

DATE February 15, 1988 TELEPHONE (313)586-1617 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 INotes:

  • To be determined i

2.

REPORTING PERIOD:

January 15, 1988 l

3 LICENSED THEPJ4AL POWER (MWt):

3292 i This report has been 1

4.

NAMEPLATE RATING (CROSS MWe):

1154 i reinitialized at 1

5.

DESIGN ELECT RATING (Net MWe): 1093 l Commercial Operation whichl 6.

MAX DEPENDABLE CAP (CROSS MWe):

I began h nuary 23, 1988 at i 7.

MAX DEPENDABLE CAP (Net MWE):

l 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />.

l 8.

IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

None

10. REASONS FOR RESTRICTION, IF ANY: Feral 2 is now in Commercial Operation.

Commercial Operation began January 23, 1988.

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 206 206 206
12. MRS REACTOR WAS CRITICAL 206 206 206
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 206 206 206
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) _608,852

_608,852 608,852

17. GROSS ELECT ENERGY GEN (MW) 206,750 206,750 206,750
18. NET ELECT ENERGY GEN (MV")

197,772 197,772 197,772

19. UNIT SERVICE FACTOR 100 100 100
20. UNIT AVAILABILITY FACTOR 100 100 100
21. UNIT CAP FACTOR (USING MDC NET)
22. UNIT CAP FACTOR (USING DER NET)
23. UNIT FORCED CUTAGE RATE O

0 0

24. SHUTDOWNS SCHEDULED OVER NEXT 6 ENTHS (TYPE, DATE, DURATION OF EACH)

There is a LLRT outage scheduled for February 26, 1988. The outage will last forty five days.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 CCMMERCIAL OPERATION 01/23/88 01/23/88 f

0002220099 890131 PDR ADOCK 05000341 D

DCD

AVERAGE DAILY UNIT POWER LEHL l

DOCKET NO.

50-341 UNIT FERMI 2 i

DATE February 15. 1988 t

I COMPLETED BY P. M. Anthony l

TELEPHONE (313) 586-1617 l

l Month January, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AD:l: AGE DAILY PONER LEVEL f

(MWe-Net)

(MWe-Net) l t

1 N/A 17 N/A i

l 2

N/A 18 N/A t

3 N/A 19 W/A l

4 N/A 20 N/A I

5 N/A 21 N/A 6

N/A 22 N/A i

7 N/A 23 595 l

8

.c 24 940 i

9 N/A 25 1016 j

10 N/A 26 1028 11 N/A 27 1026 l

r 12 N/A 28 1007 j

13 N/A 29 883 14 W/A 30 860 1

15 N/A 31 856 l

t 16 N/A I

1 i

j

UNIT 555130W35 AND FOWER SEDUCTICES DOCKET NO.

& )41_

LATE Februa3y 15. 1986 UCIT NAME fgi2 COMPLETID BY P. M. An t Ikerry Ti1EPHONE (313)586-1617 REPO2T MONTH _Drgrpher 1987 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1 METE 0D OF 1 LER 1 SYS 1 COMP 1 CAUSE & CORRETIVE 1

1 NO.

1 DATE 1 TYPE 1 DUR 1 REASON 1 SHUTTING DOWN 1 NO.

1 CODE 1 CODE 1 ACTION TO PREVENT 1

1 1

1 (1) 1 (HRS)1 (2) 1 THE REACTOR 1

1 (4) 1 (5) 1 REURRENCE 1

1 1

1 1

1 1

(3) 1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1 c/A 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 3

1 1

1 1

1 1

1 -

1 1

1 (1) F: FORCFD (2) RIMSON:

(3) METM(0:

(4) EIHIBIT C - INSTRUCTIONS S SCitEDtfLED A - EQUIPMENT FAILURE (EIPIAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAlhTtNANCE OR TEST 2 + MAht:AL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUT(MATIC SCRAM EVENT REPORT (LER) FILE D - RtIUIATORY RESTRICTION 4 - CONTIEL1D

( NURIC--Ol 61)

E - OPERATOR TRAlh1NC & LICthSE EIAMIhATION 5 - REDUCED IDAD F - ADMINISTRATIVE 9 - 01HER C.- OPERATIONAL ERROR (EXFIAIN)

H - 01EER (EIFIAIN)

(5) EINIBIT I - SAME SOURCE

+

- - - - - ~..

i OM3tATING DATA REPORT h

y B

DOCKET NO. 50-341 COMPLETED BY P. M. Anthony DATE February 15, 1988 TELEPHONE (313)586-1617 OPERATING STATUS 1.

UNIT NAME:

Feral 2 l Notes I

j 2.

REPORTING PERIOD: December, 1987 l

1 i

3 LICENSES THERNAL POWER (MWt): 3292 1 'To be determined I

l I

4.

NAMEPLATE RATING (GROSS MWe):

1154 1

1 l

l 5.

DESIGN ELECT RATING (Net MWe): 1093 i

l i

f f

6.

MAX DEPENDABLE CAP (GROSS MWe):

l i

I 7.

MAX DEPENDABLE CAP (Net MWE):

l

_l 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (!TEMS NUMBER 3 THROUGH 7) SINCE f

j LAST REPORT, GIVE REASONS: None 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net) 819 7

10. REASONS FOR RESTRICTION, IF ANY:

Fermi 2 is in the startup test phase f

and is currently authorized to operate at power levels below 75% of l

rated thermal power.

f

}

THIS MONTH YR TO DATE CUMULATIVE l

11. MRS IN REPORTING PERIOD 744 8760 24384
12. HRS REACTOR WAS CRITICAL 738.9 5147.5 6017.3
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 738.9 4084.2 4313.7
15. UNIT RESERVE SHVTDOWN HOURS 0

0 0

16. GROSS THEFRAL ENERGY GEN (MWH) 1,515,768 5,988,912 6.212,160 l
17. GROSS ELECT ENERGY GEN (MWH) 479,050 _

1,573,593 1,584,043

]

18. NET ELECT ENERGY GEN (MWH) 452,683 1.392,801 1,366,842
19. UNIT SERVICE FACTOR N/A N/A N/A i
20. UNIT AVAILABILITY FACE R N/A N/A N/A

)

21. UNIT CAP FACTOR (US!WG MDC NET)

N/A N/A N/A 4

22. UNIT CAP FACTOR (USING DER NET)

N/A N/A N/A 8

23. UNIT FORCED OUTAGE RATE N/A N/A N/A
24. SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, DATE, DURATION OF EACH) f There is a LLRT outage scheduled for March 1968. The outage will last i

j forty five days.

l

25. IF SHUT DOVN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A l

z

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)t FORECAST ACHIEVED

)

IN!T!AL CRITICALITY 06/20/85 06/21/85 3

e j

IN!TIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION I

i

ow $ o.w l

Reg Guide 1.16 t

Detro,i.t

.. -o.

,m,.

]

Opf f d? C':\\

February 15 1988 RRC-88-0032

]

U.

S.

Nuclear Regulatory Commission Attention:

Document Control Desk I

i Washington, D.C.

20555 l

1

Reference:

Termi 2 1

RRC Docket 8o.

50-341 RRC Operating License No.

RPF-43

Subject:

Monthly Operating Status Report 4

i for Januarv. 1988 1

Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for January. 1988.

This t

report includes the Operating Data Report. Average Daily Unit Power Level, and the Summary of Unit Shutdowns aed J

Power Reductions identified in NRC Regulatory Guide 1.16 i

]

and Termi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Patricia Antbony at (313) 586-1617.

i Sincerel i

l l

W.

S.

Orser Vive President Nuclear Operations 4

l 4

1 i

Rnclosure l

cci A.

3. Davts J.

R.

Eckert R. G. Greenaan

)

D.

R.

Rahn pg k

{

{

W.

C.

Rogers t

{

J. J.

Stefano i

g

)

i l

]

l n

-