OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY P. M. Anthony g
DATE February 15, 1988 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 INotes:
- To be determined i
2.
REPORTING PERIOD:
January 15, 1988 l
3 LICENSED THEPJ4AL POWER (MWt):
3292 i This report has been 1
4.
NAMEPLATE RATING (CROSS MWe):
1154 i reinitialized at 1
5.
DESIGN ELECT RATING (Net MWe): 1093 l Commercial Operation whichl 6.
MAX DEPENDABLE CAP (CROSS MWe):
I began h nuary 23, 1988 at i 7.
MAX DEPENDABLE CAP (Net MWE):
l 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />.
l 8.
IF CHANCES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY: Feral 2 is now in Commercial Operation.
Commercial Operation began January 23, 1988.
THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 206 206 206
- 12. MRS REACTOR WAS CRITICAL 206 206 206
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 206 206 206
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) _608,852
_608,852 608,852
- 17. GROSS ELECT ENERGY GEN (MW) 206,750 206,750 206,750
- 18. NET ELECT ENERGY GEN (MV")
197,772 197,772 197,772
- 19. UNIT SERVICE FACTOR 100 100 100
- 20. UNIT AVAILABILITY FACTOR 100 100 100
- 22. UNIT CAP FACTOR (USING DER NET)
- 23. UNIT FORCED CUTAGE RATE O
0 0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 ENTHS (TYPE, DATE, DURATION OF EACH)
There is a LLRT outage scheduled for February 26, 1988. The outage will last forty five days.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 CCMMERCIAL OPERATION 01/23/88 01/23/88 f
0002220099 890131 PDR ADOCK 05000341 D
AVERAGE DAILY UNIT POWER LEHL l
DOCKET NO.
50-341 UNIT FERMI 2 i
DATE February 15. 1988 t
I COMPLETED BY P. M. Anthony l
TELEPHONE (313) 586-1617 l
l Month January, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AD:l: AGE DAILY PONER LEVEL f
(MWe-Net)
(MWe-Net) l t
1 N/A 17 N/A i
l 2
N/A 18 N/A t
3 N/A 19 W/A l
4 N/A 20 N/A I
5 N/A 21 N/A 6
N/A 22 N/A i
7 N/A 23 595 l
8
.c 24 940 i
9 N/A 25 1016 j
10 N/A 26 1028 11 N/A 27 1026 l
r 12 N/A 28 1007 j
13 N/A 29 883 14 W/A 30 860 1
15 N/A 31 856 l
t 16 N/A I
1 i
j
UNIT 555130W35 AND FOWER SEDUCTICES DOCKET NO.
& )41_
LATE Februa3y 15. 1986 UCIT NAME fgi2 COMPLETID BY P. M. An t Ikerry Ti1EPHONE (313)586-1617 REPO2T MONTH _Drgrpher 1987 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1 METE 0D OF 1 LER 1 SYS 1 COMP 1 CAUSE & CORRETIVE 1
1 NO.
1 DATE 1 TYPE 1 DUR 1 REASON 1 SHUTTING DOWN 1 NO.
1 CODE 1 CODE 1 ACTION TO PREVENT 1
1 1
1 (1) 1 (HRS)1 (2) 1 THE REACTOR 1
1 (4) 1 (5) 1 REURRENCE 1
1 1
1 1
1 1
(3) 1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1 c/A 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 3
1 1
1 1
1 1
1 -
1 1
1 (1) F: FORCFD (2) RIMSON:
(3) METM(0:
(4) EIHIBIT C - INSTRUCTIONS S SCitEDtfLED A - EQUIPMENT FAILURE (EIPIAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAlhTtNANCE OR TEST 2 + MAht:AL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUT(MATIC SCRAM EVENT REPORT (LER) FILE D - RtIUIATORY RESTRICTION 4 - CONTIEL1D
( NURIC--Ol 61)
E - OPERATOR TRAlh1NC & LICthSE EIAMIhATION 5 - REDUCED IDAD F - ADMINISTRATIVE 9 - 01HER C.- OPERATIONAL ERROR (EXFIAIN)
H - 01EER (EIFIAIN)
(5) EINIBIT I - SAME SOURCE
+
- - - - - ~..
i OM3tATING DATA REPORT h
y B
DOCKET NO. 50-341 COMPLETED BY P. M. Anthony DATE February 15, 1988 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Feral 2 l Notes I
j 2.
REPORTING PERIOD: December, 1987 l
1 i
3 LICENSES THERNAL POWER (MWt): 3292 1 'To be determined I
l I
4.
NAMEPLATE RATING (GROSS MWe):
1154 1
1 l
l 5.
DESIGN ELECT RATING (Net MWe): 1093 i
l i
f f
6.
MAX DEPENDABLE CAP (GROSS MWe):
l i
I 7.
MAX DEPENDABLE CAP (Net MWE):
l
_l 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (!TEMS NUMBER 3 THROUGH 7) SINCE f
j LAST REPORT, GIVE REASONS: None 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net) 819 7
- 10. REASONS FOR RESTRICTION, IF ANY:
Fermi 2 is in the startup test phase f
and is currently authorized to operate at power levels below 75% of l
rated thermal power.
f
}
THIS MONTH YR TO DATE CUMULATIVE l
- 11. MRS IN REPORTING PERIOD 744 8760 24384
- 12. HRS REACTOR WAS CRITICAL 738.9 5147.5 6017.3
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 738.9 4084.2 4313.7
- 15. UNIT RESERVE SHVTDOWN HOURS 0
0 0
- 16. GROSS THEFRAL ENERGY GEN (MWH) 1,515,768 5,988,912 6.212,160 l
- 17. GROSS ELECT ENERGY GEN (MWH) 479,050 _
1,573,593 1,584,043
]
- 18. NET ELECT ENERGY GEN (MWH) 452,683 1.392,801 1,366,842
- 19. UNIT SERVICE FACTOR N/A N/A N/A i
- 20. UNIT AVAILABILITY FACE R N/A N/A N/A
)
N/A N/A N/A 4
- 22. UNIT CAP FACTOR (USING DER NET)
N/A N/A N/A 8
- 23. UNIT FORCED OUTAGE RATE N/A N/A N/A
- 24. SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, DATE, DURATION OF EACH) f There is a LLRT outage scheduled for March 1968. The outage will last i
j forty five days.
l
- 25. IF SHUT DOVN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A l
z
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)t FORECAST ACHIEVED
)
IN!T!AL CRITICALITY 06/20/85 06/21/85 3
e j
IN!TIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION I
i
ow $ o.w l
Detro,i.t
.. -o.
,m,.
]
Opf f d? C':\\
February 15 1988 RRC-88-0032
]
U.
S.
Nuclear Regulatory Commission Attention:
Document Control Desk I
i Washington, D.C.
20555 l
1
Reference:
Termi 2 1
RRC Docket 8o.
50-341 RRC Operating License No.
RPF-43
Subject:
Monthly Operating Status Report 4
i for Januarv. 1988 1
Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for January. 1988.
This t
report includes the Operating Data Report. Average Daily Unit Power Level, and the Summary of Unit Shutdowns aed J
Power Reductions identified in NRC Regulatory Guide 1.16 i
]
and Termi 2 Technical Specification 6.9.1.6.
If you have any questions, please contact Patricia Antbony at (313) 586-1617.
i Sincerel i
l l
W.
S.
Orser Vive President Nuclear Operations 4
l 4
1 i
Rnclosure l
cci A.
- 3. Davts J.
R.
Eckert R. G. Greenaan
)
D.
R.
Rahn pg k
{
{
W.
C.
Rogers t
{
J. J.
Stefano i
g
)
i l
]
l n
-