MONTHYEARNLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2021063, Emergency Plan Implementing Procedure. Includes Emergency Plan Implementing Procedure (EPIP) 5.7.1, Emergency Classification (Revision 71)2021-11-0303 November 2021 Emergency Plan Implementing Procedure. Includes Emergency Plan Implementing Procedure (EPIP) 5.7.1, Emergency Classification (Revision 71) NLS2021001, Emergency Plan, Revision 76, On-Shift Staffing Analysis, Revision 2, and Emergency Plan Implementing Procedures2021-01-0606 January 2021 Emergency Plan, Revision 76, On-Shift Staffing Analysis, Revision 2, and Emergency Plan Implementing Procedures ML20307A1042020-10-21021 October 2020 Submittal of Emergency Plan Implementing Procedure 5.7.1, Rev. 66 ML20318A1682020-10-21021 October 2020 Report of Change and Summary of 50.54( Q) Analyses Emergency Plan Implementing Procedure 5.7.1, Revision 66 ML20307A1032020-10-21021 October 2020 Report of Change and Summary of 50.54(q) Analyses for Emergency Plan Implementing Procedure 5.7.1, Revision 66 ML20070K3902020-03-0303 March 2020 Report of Changes to Emergency Plan Implementing Procedure 5.7.1 NLS2020014, Nebraska Public Power District - Report of Changes to Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-462020-03-0303 March 2020 Nebraska Public Power District - Report of Changes to Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46 ML20055D8692020-02-18018 February 2020 Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors NLS2018057, Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.1, Revision 612018-10-18018 October 2018 Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.1, Revision 61 NLS2018042, Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.6, Revision 742018-08-13013 August 2018 Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.6, Revision 74 NLS2018040, Emergency Plan Implementing Procedure 5.7.11, Early Dismissal/Evacuation of Site Personnel, Rev. 192018-07-11011 July 2018 Emergency Plan Implementing Procedure 5.7.11, Early Dismissal/Evacuation of Site Personnel, Rev. 19 ML18197A0822018-07-11011 July 2018 Report of Change to Emergency Plan Implementing Procedure 5.7.11, Early Dismissal/Evacuation of Site Personnel, Rev. 19 NLS2018022, Attachment - Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.19, Revision 152018-05-0202 May 2018 Attachment - Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.19, Revision 15 NLS2018014, Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.13, Revision 192018-03-12012 March 2018 Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.13, Revision 19 NLS2018001, Attachment - Report of Change and Summary of 50.54(q) Analysis for Emergency Plan Implementing Procedure 5.7.1, Revision 592018-01-0808 January 2018 Attachment - Report of Change and Summary of 50.54(q) Analysis for Emergency Plan Implementing Procedure 5.7.1, Revision 59 ML18016A0522018-01-0808 January 2018 Submittal of Change to Emergency Plan Implementing Procedure 5.7.1, Rev. 59 ML17206A0832017-07-18018 July 2017 Submittal of Change to Emergency Plan Implementing Procedure 5.7.1, Rev. 58 NLS2017061, Emergency Plan Implementing Procedure 5.7.1, Emergency Classification, Rev. 582017-06-22022 June 2017 Emergency Plan Implementing Procedure 5.7.1, Emergency Classification, Rev. 58 ML17130A7132017-05-0404 May 2017 Report of Change and Summary of 50.54(q) Analysis - Emergency Plan Implementing Procedure 5.7.6, Revision 69 NLS2017049, Report of Change and Summary of 50.54(q) Analysis - Emergency Plan Implementing Procedure 5.7.6, Revision 692017-05-0303 May 2017 Report of Change and Summary of 50.54(q) Analysis - Emergency Plan Implementing Procedure 5.7.6, Revision 69 NLS2017038, Attachment Report of Change and Summary of 50.54(q) Analysis, Emergency Plan Implementing Procedure 5.7.1, Revision 57; Emergency Plan Implementing Procedure 5.7.17, Revision 49; Emergency Plan Implementing Procedure 5.7.17.1, Revision 32017-04-17017 April 2017 Attachment Report of Change and Summary of 50.54(q) Analysis, Emergency Plan Implementing Procedure 5.7.1, Revision 57; Emergency Plan Implementing Procedure 5.7.17, Revision 49; Emergency Plan Implementing Procedure 5.7.17.1, Revision 3 ML17114A0392017-04-17017 April 2017 EPIP 5.7.1, Revision 57, Emergency Classification, EPIP 5.7.17, Revision 49, CNS-Dose Assessment, and EPIP 5.7.17.1, Revision 3, Dose Assessment (Manual). ML17104A2992017-03-28028 March 2017 Submittal of Emergency Plan Implementing Procedure NLS2017030, Report of Change and Summary of 50.54(q) Analysis - Emergency Plan Implementing Procedure 5.7.27, Revision 182017-03-28028 March 2017 Report of Change and Summary of 50.54(q) Analysis - Emergency Plan Implementing Procedure 5.7.27, Revision 18 ML17100A1792017-03-28028 March 2017 Report of Change and Summary of 50.54(q) Analysis - Emergency Plan Implementing Procedure 5.7.27, Revision 18, Alert and Notification System. NLS2016071, Submittal of Changes in the Emergency Plan Implementing Procedures2016-12-0505 December 2016 Submittal of Changes in the Emergency Plan Implementing Procedures NLS2016060, Submittal of Emergency Plan Implementing Procedure2016-10-0303 October 2016 Submittal of Emergency Plan Implementing Procedure ML16285A4082016-10-0303 October 2016 Enclosure to NLS2016060: Revision 21 to Emergency Plan Implementing Procedure (EPIP) 5.7.15 - OSC Team Dispatch ML16235A2912016-08-22022 August 2016 Emergency Implementing Procedure (EPIP) 5.7.10, Personnel Assembly Accountability, Revision 40 NLS2016041, Nebraska Public Power District - Submittal of Emergency Plan Implementing Procedure, Revision 402016-07-13013 July 2016 Nebraska Public Power District - Submittal of Emergency Plan Implementing Procedure, Revision 40 NLS2016025, Emergency Plan Implementing Procedures, Including Revision 54 to EPIP 5.7.1, Revision 27 to EPIP 5.7.8, Revision 25 to EPIP 5.7.16, Revision 0 to EPIP 5.7.17.1, Revision 45 to EPIP 5.7.17, and Revision 27 to EPIP 5.7.202016-04-27027 April 2016 Emergency Plan Implementing Procedures, Including Revision 54 to EPIP 5.7.1, Revision 27 to EPIP 5.7.8, Revision 25 to EPIP 5.7.16, Revision 0 to EPIP 5.7.17.1, Revision 45 to EPIP 5.7.17, and Revision 27 to EPIP 5.7.20 NLS2016020, Emergency Plan Implementing Procedures, Including Revision 67 to EPIP 5.7.6, Revision 35 to EPIP 5.7.7, Revision 26 to Tpp 1012016-03-23023 March 2016 Emergency Plan Implementing Procedures, Including Revision 67 to EPIP 5.7.6, Revision 35 to EPIP 5.7.7, Revision 26 to Tpp 101 ML16068A1082016-02-26026 February 2016 Transmittal of Emergency Plan Implementing Procedures NLS2016011, Emergency Plan Implementing Procedure 5.7.2, Revision 342016-02-26026 February 2016 Emergency Plan Implementing Procedure 5.7.2, Revision 34 NLS2016015, Emergency Plan Implementing Procedure, Revision 25 to Training Program Procedure 1012016-02-18018 February 2016 Emergency Plan Implementing Procedure, Revision 25 to Training Program Procedure 101 NLS2015140, Submittal of Emergency Plan Implementing Procedure, Revision 2C1 to EPIP 0-EN-EP-308, Emergency Planning Critiques2015-12-21021 December 2015 Submittal of Emergency Plan Implementing Procedure, Revision 2C1 to EPIP 0-EN-EP-308, Emergency Planning Critiques NLS2012122, Rev. 55 to Emergency Plan Implementing Procedures EPIP 5.7.6, Notification, Rev. 38 to EPIP 5.7.17, Dose Assessment, and Rev. 18 to EPIP 5.7COMMUN, Communications2012-11-21021 November 2012 Rev. 55 to Emergency Plan Implementing Procedures EPIP 5.7.6, Notification, Rev. 38 to EPIP 5.7.17, Dose Assessment, and Rev. 18 to EPIP 5.7COMMUN, Communications ML12340A5262012-11-21021 November 2012 Emergency Plan Revisions and Emergency Plan Implementing Procedure, Rev. 55, EPIP 5.7.6, Notification, to Rev. 38, EPIP 5.7.17, Dose Assessment, Rev. 18, EPIP 5.7COMMUN, Communications NLS2009008, Request for Approval of Adopting Revised Emergency Action Level Documents Based on Nuclear Energy Institute 99-01, Revision 5, Methodology, February 20082009-02-26026 February 2009 Request for Approval of Adopting Revised Emergency Action Level Documents Based on Nuclear Energy Institute 99-01, Revision 5, Methodology, February 2008 NLS2008085, Revisions to Emergency Plan Implementing Procedures. Includes EPIP 5.7.6, Revision 48 & EPIP 5.7.25, Revision 172008-09-30030 September 2008 Revisions to Emergency Plan Implementing Procedures. Includes EPIP 5.7.6, Revision 48 & EPIP 5.7.25, Revision 17 NLS2008073, Revisions to Emergency Plan Implementing Procedures2008-09-0909 September 2008 Revisions to Emergency Plan Implementing Procedures NLS2005064, Change to Emergency Plan Implementing Procedure2005-07-27027 July 2005 Change to Emergency Plan Implementing Procedure NLS2004056, Emergency Plan Implementing Procedures2004-04-23023 April 2004 Emergency Plan Implementing Procedures NLS2004040, Revision 5 to EPIP 5.7.8.1, Activation of Alternate OSC and Revision 3 to EPIP 5.7COMMUN, Communications.2004-03-17017 March 2004 Revision 5 to EPIP 5.7.8.1, Activation of Alternate OSC and Revision 3 to EPIP 5.7COMMUN, Communications. NLS2004018, Revision 2 to EPIP 5.7COMMUN, Communications2004-02-19019 February 2004 Revision 2 to EPIP 5.7COMMUN, Communications NLS2004016, Revision 25 to EPIP 5.7.9, Activation of Eof.2004-02-18018 February 2004 Revision 25 to EPIP 5.7.9, Activation of Eof. NLS2004013, Revision 19 to EPIP 5.7.2, Shift Supervisor Epip.2004-02-13013 February 2004 Revision 19 to EPIP 5.7.2, Shift Supervisor Epip. NLS2003132, Revision 2 to EPIP 5.7ENS, ENS Communicator.2003-12-29029 December 2003 Revision 2 to EPIP 5.7ENS, ENS Communicator. NLS2003124, Revision 31 to EPIP 5.7.1, Emergency Classification.2003-12-11011 December 2003 Revision 31 to EPIP 5.7.1, Emergency Classification. 2024-01-16
[Table view] Category:Letter type:NLS
MONTHYEARNLS2024006, Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-02 NLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2024003, 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector2024-01-15015 January 2024 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector NLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023053, ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-30030 November 2023 ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023050, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023051, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-10-10010 October 2023 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023047, Licensee Guarantees of Payment of Deferred Premiums2023-07-26026 July 2023 Licensee Guarantees of Payment of Deferred Premiums NLS2023033, 10 CFR 50.55a Relief Request RC3-022023-06-27027 June 2023 10 CFR 50.55a Relief Request RC3-02 NLS2023039, Preparation and Scheduling of Operator Licensing Examinations2023-06-0101 June 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2023038, Nebraska Public Power District 2022 Financial Report2023-05-22022 May 2023 Nebraska Public Power District 2022 Financial Report NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023030, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2023027, Annual Report of Individual Exposure Monitoring2023-04-13013 April 2023 Annual Report of Individual Exposure Monitoring NLS2023021, Quality Assurance Program Changes2023-04-10010 April 2023 Quality Assurance Program Changes NLS2023020, Decommissioning Funding2023-03-29029 March 2023 Decommissioning Funding NLS2023019, Property Insurance Coverage2023-03-23023 March 2023 Property Insurance Coverage NLS2023010, Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022050, Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library2022-11-0909 November 2022 Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library NLS2022048, Management Change and Correspondence Update2022-11-0101 November 2022 Management Change and Correspondence Update NLS2022047, Core Operating Limits Report, Cycle 33, Revision 02022-10-14014 October 2022 Core Operating Limits Report, Cycle 33, Revision 0 NLS2022042, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2022-10-0707 October 2022 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2022037, Emergency Plan, Revision 80, Summary of 50.54(q) Analyses2022-08-18018 August 2022 Emergency Plan, Revision 80, Summary of 50.54(q) Analyses NLS2022035, Evacuation Time Estimate Report for Cooper Nuclear Station2022-08-16016 August 2022 Evacuation Time Estimate Report for Cooper Nuclear Station NLS2022031, Licensee Guarantees of Payment of Deferred Premiums2022-07-19019 July 2022 Licensee Guarantees of Payment of Deferred Premiums NLS2022005, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-06-16016 June 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements NLS2022025, Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring2022-06-0606 June 2022 Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring NLS2022016, Annual Radiological Environmental Report2022-05-10010 May 2022 Annual Radiological Environmental Report NLS2022020, Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report2022-05-0202 May 2022 Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report NLS2022014, Annual Radioactive Effluent Release Report2022-04-27027 April 2022 Annual Radioactive Effluent Release Report NLS2022010, Annual Report of Individual Exposure Monitoring2022-04-0505 April 2022 Annual Report of Individual Exposure Monitoring NLS2022009, Property Insurance Coverage2022-03-23023 March 2022 Property Insurance Coverage NLS2022011, Preparation and Scheduling of Operator Licensing Examinations2022-03-18018 March 2022 Preparation and Scheduling of Operator Licensing Examinations NLS2022004, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 12022-02-0707 February 2022 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 1 NLS2022003, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20212022-01-20020 January 2022 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2021 NLS2021067, ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-16016 December 2021 ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan NLS2021069, Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-12-15015 December 2021 Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2021066, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 32021-12-10010 December 2021 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 3 NLS2021065, Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-012021-12-0606 December 2021 Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-01 NLS2021056, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-11-16016 November 2021 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements 2024-01-25
[Table view] |
Text
Nebraska Public Power District Nebraska's Energy Leader NLS2002061 May 23, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:
Subject:
Emergency Plan Implementing Procedures Cooper Nuclear Station, NRC Docket 50-298, DPR-46 Pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures,"
Nebraska Public Power District (NPPD) is transmitting the following Emergency Plan Implementing Procedure (EPIP):
EPIP 5.7.9.1 Revision 3 "Activation of Alternate EOF" NPPD has determined that this EPIP revision was not transmitted to the NRC as required. This failure has been entered into the corrective action program. This EPIP, 5.7.9.1 Revision 3, has been superceded by subsequent revisions, therefore, this revision should not be filed as an active procedure.
Should you have any questions concerning this matter, please contact me at (402) 825-5233.
S' cerely, A Hutton Plant Manager
/cb Enclosure cc: Regional Administrator w/enclosure (2) NPG Distribution w/o enclosure USNRC - Region IV Senior Resident Inspector w/enclosure Records w/o enclosure USNRC Cooper Nuclear Station P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 http://www.nppd.com AiO45
ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS I Correspondence Number: NLS2002061 The following table identifies those actions committed to by the District in this document.
Any other actions discussed in the submittal represent intended or planned actions by the District. They are described for information only and are not regulatory commitments.
Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None
I PROCEDURE 0.42 1 REVISION 10 1 PAGE 12 OF 14
USE: REFERENCE MANUAL EFEC E: 2 CNS OPERATIONS EPIP 57.9.1EFFECTIVE: 2/12/01 EPIP 5.7.9.1 APPROVAL: SORC OWNER: J. G. KELSAY DERTMENT: EP ACTIVATION OF ALTERNATE EOF DEPARTMENT: EP
- 1. P U RP O SE ............................................................ 1
- 2. REQUIREM EN TS ...................................................... 1
- 3. EO F D IRE CTOR ....................................................... 1
- 4. RADIOLOGICAL CONTROL MANAGER ................................... 1
- 5. EOF EMERGENCY PREPAREDNESS COORDINATOR ...................... 2
- 6. EOF PERSONNEL ..................................................... 2 ATTACHMENT 1 EOF DIRECTOR CHECKLIST- AEOF .................. 3 ATTACHMENT 2 EOF EMERGENCY PREPAREDNESS COORDINATOR CHECKLIST - AEOF ................................. 4 ATTACHMENT 3 AEOF FLOOR PLAN ................................. 6 ATTACHMENT 4 INFORMATION SHEET .............................. 7
- 1. PURPOSE This procedure describes the activation and subsequent operation of the Alternate Emergency Operations Facility (AEOF) in the event that the normal Emergency Operations Facility (EOF) cannot be activated or becomes uninhabitable during an ALERT, SITE AREA EMERGENCY, or GENERAL EMERGENCY.
- 2. REQUIREMENTS 2.1 The EOF cannot be activated in its normal location or it has been determined to be uninhabitable.
- 3. EOF DIRECTOR 3.1 EOF Director shall ensure items listed on Attachment 1 are completed.
- 4. RADIOLOGICAL CONTROL MANAGER 4.1 Radiological Control Manager shall determine the relocation route to be taken to the AEOF, based on radiological survey data and consistent with ALARA principles, as to avoid any excess radiation doses. This route shall be communicated clearly to all personnel who are relocating.
4.2 Radiological Control Manager shall utilize Procedures 5.7.11 and 5.7.13, if necessary, during facility relocation.
PROCEDURE 5.7.9.1 REVISION 3 PAGE 1 OF 8
- 5. EOF EMERGENCY PREPAREDNESS COORDINATOR 5.1 EOF EPC shall ensure items listed on Attachment 2 are completed.
- 6. EOF PERSONNEL 6.1 EOF personnel shall relocate in an orderly fashion to the AEOF when instructed to do so, using the specified route. Personnel shall take with them all written logs, portable radios, calculators, communication headsets, personnel protection and safety equipment that has been issued to them, and any other EOF equipment necessary to perform their EOF duties from the AEOF. If instructed by the Radiological Control Manager or EOF Director, EOF personnel shall obtain their TLD prior to relocating to the AEOF.
6.2 All EOF personnel shall perform their duties from the AEOF in the same manner that they would from the normal EOF utilizing this and all other appropriate procedures. EOF staff members shall assist the EOF EPC in facility relocation and set-up tasks if requested to do so by the EOF Director or EOF EPC.
I PROCEDURE 5.7.9.1 1 REVISION 3 1 PAGE 2 OF 8 1
ATTACHMENT 1 EOF DIRECTOR CHECKLIST - AEOF ACTION ITEMS TIME/INITIALS
- 1. Notify EOF personnel of the decision to relocate the EOF, the reasons for relocation, and any specific information and instructions about the relocation effort. Instruct EOF personnel to obtain their TLD if this action has been deemed appropriate by the Radiological Control Manager. I
- 2. Contact the TSC and notify TSC Director of the decision to relocate the EOF. Make arrangements for temporary turnover of EOF duties to the TSC during the relocation process. I
- 3. Notify Local, State, and Federal Agency Representatives present in the EOF of the relocation decision. I
- 4. Make arrangements with State and Local Agencies for the AEOF (Nemaha County Multiplex Building) to be unlocked (if not currently occupied or keys to the facility are not available from the EOF EPC PIM Manual) and made accessible to EOF personnel. I
- 5. Request EOF Logistics Coordinator to coordinate the use of station vehicles for the transfer of personnel and equipment to the alternate facility. I
- 6. Provide EOF EPC with the necessary resources (authority and manpower) for the transfer, set-up, and preparation of equipment in the alternate facility. /
I PROCEDURE 5.7.9.1 1 REVISION 3 1 PAGE 3 OF 8
ATTACHMENT 2 EOF EMERGENCY PREPAREDNESS COORDINATOR CHECKLIST - AEOF ACTION ITEMS TIME/INITIALS
- 1. Ensure at least the following equipment is transferred from the EOF to the AEOF during relocation:
1.1 One IDT (Information Display Terminal).
1.2 One printer for the IDT.
1.3 One Laserjet printer.
1.4 One fax machine.
1.5 One VT-220 display terminal.
- 2. Set up telephones, radios, and computer communications.
2.1 The telephones and radios are located on shelves in the equipment storage room at the east end of the AEOF.
Ensure this room has been unlocked per Attachment 1, Step 4, if keys are not available from the EOF EPC PIM Manual. /
2.2 Set up the tables in the configuration shown on Attachment 3. The tables are located in the equipment storage room at the east end of the AEOF. I 2.3 Obtain telephones and base radio units from the equipment storage room and place on the tables.
These telephones and radios are labeled by ERO position.
Place them at the locations identified for the respective ERO positions per Attachment 3. I 2.4 Drop the telephone cords under the tables to the terminal blocks located on the north and west walls and plug them into the jacks that are labeled for each respective unit.
The same applies to the base radio units which are similarly labeled. /
I PROCEDURE 5.7.9.1 1 REVISION 3 1 PAGE 4 OF 8 ]
ATTACHMENT 2 EOF EMERGENCY PREPAREDNESS COORDINATOR CHECKLIST - AEOF ACTION ITEMS TIME/INITIALS 2.5 Check each device for operation (dial tone or radio check). If any device is inoperable, check cable connections and jacks. Note any unwanted line noise or other unsatisfactory conditions and request assistance from the CNS Communications Department, if necessary. I
- 3. STATUS BOARDS AND EPZ MAP SET-UP 3.1 Locate status boards and maps in the equipment storage room. Relocate them to the main AEOF area. I 3.2 Position status boards in AEOF per Attachment 3.
/
3.3 Position EPZ maps, as necessary, for easy access and use.
- 4. COMPUTER TERMINAL SET-UP 4.1 Place IDT terminal, IDT printer, VT220 display terminal, and Laserjet printer, at locations specified on Attachment 3. /
4.2 Drop the terminal cords under the tables to the terminal blocks located on the north and west walls and plug them into the jacks that are labeled for each respective unit. I 4.3 Check each device for operation. If any device is inoperable, check cable connections. Note any unsatisfactory conditions and request assistance from the Communications Department Technicians, if necessary. /
I PROCEDURE 5.7.9.1 1 REVISION 3 1 PAGE 5 OF 8
I ATTACHMENT 3 AEOF FLOOR PLAN I N +S COMMUNICATION AND EQUIPMENT STORAGE w
AEOF FAX OPS/EOP EMERGENCY NRC CLERK ADVISOR DIRECTOR DSO I PRINTER IDT TERMINAL AND PRINTER EPC EOF RX SAFETY DIRECTOR NRC EPC z
5n SII RAD CTRL RAD ASSMT NRC RAD wI MANAGER SUPERVR ASSESS w- I EOC/NRC CONFERENCE DROOM 0
0
< DOSE ASSMT LOGISTICS COORDINATOR COORDINATOR wL z
VT TERMINAL STATUS BOARDS NEMAHA COUNTY EMERGENCY STATE OF STATE OF OPERATIONS MISSOURI NEBRASKA CENTER CHAIRS OFF-SITE FIELD TEAM COMMUNICATOR COORDINATOR NEMAHA COUNTY COMMUNICATION ALTERNATE EMERGENCY OPERATIONS FACILITY 5-7-9-1A. SCAN Figure 1 I PROCEDURE 5.7.9.1 1 REVISION 3 1 PAGE 6 OF 8 I
ATTACHMENT 4 INFORMATION SHEET DISCUSSION 1.1 If emergency conditions dictate relocation of the EOF, off-site emergency response shall be accomplished from the AEOF. The decision to relocate the EOF to the alternate facility shall be made by the EOF Director.
1.2 Activation and operational criteria of the AEOF is identical to that of the EOF as specified in Procedure 5.7.9. EOF personnel shall perform the same duties, as prescribed by the same appropriate procedures, from the AEOF as they would from the normal EOF.
1.3 AEOF is located in the northeast portion of the Nemaha County Multiplex Building located at 601 "J" Street, Auburn, Nebraska. The AEOF is equipped with emergency response equipment and emergency communications equipment which shall be activated per Attachment 2.
1.4 EOF Director shall be responsible for the implementation of this procedure and shall be assisted by the EOF Emergency Preparedness Coordinator (EPC) and EOF Logistics Coordinator. The EOF Logistics Coordinator shall coordinate station vehicles for the transfer of personnel and equipment to the alternate facility. The EOF EPC shall be responsible for the transfer, set-up, and preparation of equipment. The EOF Director shall ensure EOF EPC has enough manpower at his disposal to implement this procedure. By effectively utilizing all EOF staff, tasks defined in this procedure can be performed simultaneously for more efficient and timely facility activation.
1.5 A list of emergency equipment located in the AEOF and instructions for maintaining readiness of the equipment are detailed in Procedure 5.7.21.
- 2. REFERENCES 2.1 CODES AND STANDARDS 2.1.1 NPPD Emergency Plan for CNS.
2.1.2 NUREG 0654, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
2.2 PROCEDURES 2.2.1 Emergency Plan Implementing Procedure 5.7.1, Emergency Classification.
I PROCEDURE 5.7.9.1 1 REVISION 3 1 PAGE 7 OF 8
I ATTACHMENT 4 INFORMATION SHEET 2.2.2 Emergency Plan Implementing Procedure 5.7.9, Activation of EOF.
2.2.3 Emergency Plan Implementing Procedure 5.7.11, Evacuation of Non-Designated Site Personnel.
2.2.4 Emergency Plan Implementing Procedure 5.7.13, Personnel Monitoring and Decontamination.
2.2.5 Emergency Plan Implementing Procedure 5.7.21, Emergency Equipment Inventory.
2.2.6 Emergency Plan Implementing Procedure 5.7.22, Communications.
2.3 MISCELLANEOUS 2.3.1 QA Audit 93-05.
I PROCEDURE 5.7.9.1 1 REVISION 3 1 PAGE 8 OF 8