BW260007, Submittal of Braidwood Station Unit 1 Post Accident Monitoring Instrumentation Report
| ML26029A376 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 01/29/2026 |
| From: | Schuerman A Constellation Energy Generation |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML26029A374 | List: |
| References | |
| BW260007 | |
| Download: ML26029A376 (0) | |
Text
,tlllllllfl/1/lfft>>:?'.v-*
~, Constellation.
Constellation Energy Generation, LLC (CE Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL 60407-9619 January 29, 2026 BW260007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Braidwood Station, Unit 1 Renewed Facility Operating License No. NPF-72 NRC Docket No. STN 50-456 Post Accident Monitoring Instrumentation Report www.constellationenergy.com
(
The attached report is submitted in accordance with Braidwood Nuclear Power Station, Unit 1 Technical Specifications (TS) 3.3.3 "Post Accident Monitoring (PAM)
Instrumentation" and TS 5.6.7 "Post Accident Monitoring Report". The report is required due to the inoperability of one channel of Containment Floor Water Level for a period greater than the 30-day restoration time. Accordingly, this report is due on January 30, 2026.
There are no regulatory commitments contained in this letter. If there are any questions or comments regarding this submittal, please contact Mr. Dane Brunswick, Regulatory
(
Assurance Manager, at (779) 231-6246.
Respectfully, Schuerman Digitally signed by Schuerman, Adam G
, Adam G Date: 2026.01.29 14:12:16 -06'00' Adam Schuerman Site Vice President Braidwood Station
Attachment:
Braidwood Station Unit 1 Post Accident Monitoring Report cc:
NRC Regional Administrator, Region Ill NRC Senior Resident Inspector - Braidwood Station