L-25-162, Request to Use Later Code Edition for Inservice Inspection (ISI) Proi?Am and Primary Containment ISI Program

From kanterella
(Redirected from ML26013A173)
Jump to navigation Jump to search

Request to Use Later Code Edition for Inservice Inspection (ISI) Proi?Am and Primary Containment ISI Program
ML26013A173
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 01/06/2026
From: Hicks J
Vistra Operations Company
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-25-162
Download: ML26013A173 (0)


Text

L-25-162 January 13, 2026 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Jack C. Hicks Senior Manager, Licensing Vistra Operations Company LLC P.O. Box 1002 6322 North FM 56 Glen Rose, TX 76043 Office: 254.897.6725 10 CFR 50.55a Request to Use Later Code Edition for Inservice Inspection (ISi) Proiµam and Primary Containment ISi Program In accordance with 10 CFR 50.55a(g)(4)(iv), "Applicable ISi Code: Use of subsequent Code editions and addenda," Vistra Operations Company LLC (Vistra) requests Nuclear Regulatory Commission (NRC) approval to use a later edition of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code,Section XI, incorporated in 10 CFR 50.55a(a)(l)(ii), for the units identified above. Specifically, Vistra requests approval to use the 2019 Edition of the ASME BPV Code,Section XI for the ISi programs at each unit and the Primary Containment ISi program at Beaver Valley Power Station, Unit Nos. 1 and 2.

Vistra requests approval of the attached request by June 4, 2026, to allow implementation for spring 2027 refueling outages.

There are no regulatory commitments contained in this submittal. If there are any questions, or if additional information is required, please contact me at (254) 897-6725 or jack.hicks@luminant.com.

Sincerely, Jack Hicks (Jan 13, 202611:11:12 CST)

Jack C. Hicks Attachment 10 CFR 50.55a Request Number: 24-001, Revision 0 6555 SIERRA DRIVE IRVING. TEXAS 75039 o 214-812-4600 VISTRACORP.COM

Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station, Unit No. 1 Perry Nuclear Power Plant, Unit No. 1 L-25-162 Page2 cc:

NRC Region I Administrator NRC Region III Administrator NRC Resident Inspector - Beaver Valley NRC Resident Inspector - Davis-Besse NRC Resident Inspector - Perry NRR Project Manager - Fleet Director BRP /DEP Site BRP /DEP Representative Utility Radiological Safety Board

Attachment L-25-162 10 CFR 50.55a Request Number: 24-001, Revision 0 Request in Accordance with 10 CFR 50.55a(g)(4)(iv) for ISi Items

-- For use of subsequent ASME Code Edition and Addenda --

Page 1 of 3

1. ASME Code Components Affected All Class 1, 2, 3, MC [Metal Containment], and CC [Concrete Containment] items. <1>

<1>cc items are not applicable at Davis-Besse Nuclear Power Station, Unit No. 1.

2. Applicable Code Edition and Addenda

Plant Interval Edition Start End Beaver Valley Power Fifth 2013 Edition August 29, 2018 August 28, 2028 Station, Unit No. 1 <2>

Beaver Valley Power Fourth 2013 Edition August 29, 2018 August 28, 2028 Station, Unit No. 2<2>

Davis-Besse Nuclear Fifth 2017 Edition June 8, 2023 September 20, 2032 Power Station, Unit No. 1 Perry Nuclear Power Fourth 2013 Edition May 18, 2019 May 17, 2029 Plant, Unit No. 1

<2>The interval dates and ASME Code Editions for the Primary Containment lnservice Inspection (ISi) Program are the same as the remainder of the ASME XI ISi Program.

3. Proposed Subsequent Code Edition and Addenda (or Portion)

Pursuant to 10 CFR 50.55a(g)(4)(iv), Vistra Operations Company LLC (Vistra) requests permission to use the 2019 Edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code,Section XI for the lnservice Inspection (ISi) Programs for the units identified above and for the Primary Containment ISi Program at Beaver Valley Power Station, Unit Nos. 1 and 2. The 2019 Edition was incorporated by reference in the Federal Register (87 FR 65128) dated October 27, 2022. Vistra will apply all conditions applicable to the 2019 Edition of the ASME Code.

Vistra seeks to perform standardized fleet ISi and repair/replacement programs. The proposed change would provide, to the extent practical, a unified set of ISi requirements for the Vistra fleet of nuclear reactors. Having the fleet 10-year interval ISi Programs using the same Code of Record provides implementation benefits that will maintain the existing quality and safety and provides cohesive programs for the ISi repair/replacement programs.

Attachment L-25-162 Page 2 of 3

4. Related Requirements 10 CFR 50.55a(g)(4)(iv) states:

lnservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met.

10 CFR 50.55a(a)(1)(ii)(C) incorporates by reference Section XI, Division 1, of the ASME BPV Code 2019 Edition as approved in Reference 2. Vistra is requesting to use the 2019 Edition of ASME Section XI (all provisions). The 2019 Edition of ASME BPV,Section XI, includes all related requirements in this request.

5. Duration of Proposed Request The intent is to implement the 2019 Edition of ASME Section XI starting January 15, 2027.

The duration of this request is for the remainder of each site's ISi interval as provided in Section 2.

6. Precedent
1. NRC Letter to Northern States Power Company - Minnesota "Monticello Nuclear Generating Plant-Request RR-003 to Use Later Edition of ASME Section XI Code for ISi Code of Record (EPID L-2023-LLR-0005)," dated April 11, 2023 (ADAMS Accession No. ML23079A074)
2. NRC Letter to Florida Power & Light "Turkey Point Nuclear Generating, Unit Nos. 3 and 4, and St. Lucie Plant, Unit No. 2 - Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI (EPID L-2024-LLR-0024)," dated July 16, 2024 (ADAMS Accession No. ML24184B282)
3. NRC Letter to PSEG Nuclear LLC, "Salem Nuclear Generating Station, Units 1 and 2 -

Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI (EPID L-2025-LLR-0037),"

dated May 29, 2025 (ADAMS Accession No. ML25143A131)

4. NRC Letter to Southern Nuclear Operating Company, "Vogtle Electric Generating Plant Units 3 and 4 -Authorization to Use a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI for lnservice Inspection (EPID L-2025-LLR-0053)," dated July 24, 2025 (ADAMS Accession No.

M L25196A297)

Attachment L-25-162 Page 3 of 3

7. References
1. NRC Regulatory Issue Summary 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI," dated July 28, 2004 (ADAMS Accession No. ML042090436)
2. Federal Register, 87 FR 65128, dated October 27, 2022