VEGP3-4-ISI-ALT-2025-01, Request for Use of a Later Edition of the ASME Section XI Boiler and Pressure Vessel Code for Inservice Inspection (NL-25-0111)
ML25140A970
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/20/2025
From: Coleman J
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
NL-25-0111
Download: ML25140A970 (1)


Text

A Southern Nuclear May 20, 2025 Docket Nos.: 52-025 52-026 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Regulatory Affairs Southern Nuclear Operating Company 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5000 NL-25-0111 10 CFR 50.55a Vogtle Electric Generating Plant Units 3&4 VEGP3&4-ISI-AL T-2025-01, Request for Use of a Later Edition of the ASME Section XI Boiler and Pressure Vessel Code for lnservice Inspection In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (g)(4)(iv) and the guidance provided in Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI,"

Southern Nuclear Operating Company (SNC) hereby requests NRC approval for use of the provisions of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, incorporated in 10 CFR 50.55a(a)(1 )(ii), for Vogtle Electric Generating Plant (VEGP) Units 3 and 4. Specifically, SNC requests approval for use of the 2019 Edition of the ASME B&PV Code,Section XI in its entirety for inservice inspection (ISi).

The enclosure to this letter provides the request to use those portions of a later edition of the ASME B&PV Code,Section XI related to ISi.

SNC requests approval of this request by September 30, 2025, to allow sufficient time for outage examination preparation for the Unit 3 second refueling outage.

This letter contains no regulatory commitments. If you have any questions, please contact Ryan Joyce at 205.992.6468.

Respectfully submitted,

~~

Jamie M. Coleman Director, Regulatory Affairs Southern Nuclear Operating Company

U. S. Nuclear Regulatory Commission NL-25-0111 Page 2 of 2

Enclosure:

VEGP3&4-ISI-AL T-2025-01, Request for Use of a Later Edition of the ASME Section XI Boiler and Pressure Vessel Code for lnservice Inspection cc:

NRC Regional Administrator, Region II NRR Project Manager - Vogtle 3&4 Senior Resident Inspector - Vogtle 3&4 Director, Environmental Protection Division - State of Georgia Document Services RType: VND.LI.L00

Enclosure to NL-25-0111 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3&4 VEGP3&4-ISI-AL T-2025-01, Request for Use of a Later Edition of the ASME Section XI Boiler and Pressure Vessel Code for lnservice Inspection

Enclosure to NL-25-0111 VEGP3&4-ISI-AL T-2025-01, Request for Use of a Later Edition of the ASME Section XI Boiler and Pressure Vessel Code for lnservice Inspection In accordance with 10 CFR 50.55a, "Codes and standards," paragraph (g)(4 )(iv) and the guidance provided in Reference 1, Southern Nuclear Operating Company (SNC) requests Nuclear Regulatory Commission (NRC) approval for use of a later edition of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code,Section XI, for Vogtle Electric Generating Plant Units 3 and 4 (VEGP 3&4). Specifically, SNC requests approval to use of the 2019 Edition of the ASME B&PV Code,Section XI, in its entirety for inservice inspection requirements.

1. Component(s) Affected All Class 1, 2, 3, MC, and CC items.
2. Requested Date for Approval Approval is requested by September 30, 2025, to allow for additional time for Vogtle 3&4 Spring 2026 outage preparation.

3. Applicable Code Edition and Addenda

PLANT ISi EDITION INTERVAL INTERVAL INTERVAL START SCHEDULED END Vogtle Electric 1

2017 Edition U3 - 7/31/2023 U3 - 7/30/2033 Generating Plant, U4 - 4/29/2024 U4 - 4/28/2034 Units 3 and 4

4. Proposed Subsequent Code Edition and Addenda (or Portion):

Southern Nuclear requests NRC approval to use a later edition of the ASME B&PV Code,Section XI for the VEGP 3&4 lnservice Inspection (ISi) Program.

The ISi Program Code of Record at VEGP 3&4 is the 2017 Edition. The 2019 Edition was endorsed by NRC through reference in 10 CFR 50.55a (87 FR 65148, Oct. 27, 2022).

In accordance with 10 CFR 50.55a(g)(4)(iv), SNC requests permission to use the 2019 Edition of the ASME B&PV Section XI code, in full, for ISi Program Code of Record implemented during the remainder of the first ISi Interval for Units 3&4.

5. Related Requirements:

10 CFR 50.55a(g)(4 )(iv) states:

lnservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (a) of this section, subject to the conditions listed in paragraph (b)

E-1

Enclosure to NL-25-0111 of this section, and subject to Commission approval. Portions of editions or addenda may be used, provided that all related requirements of the respective editions or addenda are met.

SNC is requesting to use the 2019 Edition of the ASME Section XI Code in its entirety for inservice inspection.

6. Duration of Proposed Request The duration of this request will continue for site's lnservice Inspection interval.
7. References
1. NRG Regulatory Issue Summary 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI," dated July 28, 2004.
2. Federal Register, 87 FR 65128, dated October 27, 2022
8. Precedent:

Similar Requests / Approvals

1) Letter from V. Sreenivas (U.S. Nuclear Regulatory Commission) to C. Domingos (Northern States Power Company - Minnesota) "Monticello Nuclear Generating Plant - Request RR-003 to Use Later Edition of ASME Section XI Code for ISi Code of Record (EPID L-2023-LLR-0005)," dated April 11, 2023 (ML23079A074).
2) Letter from M. Markley (U.S. Nuclear Regulatory Commission) to E. Pigott (Duke Energy Carolinas, LLC) "William McGuire Nuclear Station, Units 1 and 2 - relief Request to Use Later Edition of ASME Code (EPID L-2023-LLR-0033)," dated August 31, 2023 (ML23230A065).
3) Southern Nuclear Operating Company Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code,Section XI, GEN-ISi-AL T-2023-01, for Hatch Nuclear Plant Units 1 &2, Farley Nuclear Plant Units 1 &2, and Vogtle Electric Generating Plant Units 1&2, dated April 12, 2023 (ML23102A123).
4) NRG Approval of the Southern Nuclear Operating Company Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code,Section XI, GEN-ISi-AL T-2023-01, for Hatch Nuclear Plant Units 1 &2, Farley Nuclear Plant Units 1 &2, and Vogtle Electric Generating Plant Units 1 &2, dated August 2, 2023 (EPID L-2023-LRM-0046, ML23202A112).

E-2