Category:Letter type:L
MONTHYEARL-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-027, Safety Injection Tank Vent Through Wall Leakage2024-02-29029 February 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-175, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report 2024-09-09
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-027, Safety Injection Tank Vent Through Wall Leakage2024-02-29029 February 2024 Safety Injection Tank Vent Through Wall Leakage 05000335/LER-2016-0032017-08-15015 August 2017 Generator Lockout Relay Actuation During Power Ascension Results in Reactor Trip, LER 16-003-01 for St. Lucie, Unit 1, Regarding Generator Lockout Relay Actuation During Power Ascension Results in Reactor Trip 05000389/LER-2017-0012017-04-27027 April 2017 Delay in Initiating Immediate Technical Specification Required Action During Fuel Movements, LER 17-001-00 for St. Lucie, Unit 2 Regarding Delay in Initiating Immediate Technical Specification Required Action During Fuel Movements 05000335/LER-2016-0012016-07-29029 July 2016 Inadequate Legacy Evaluation for Containment High Range Radiation Monitor Nonconformance with Design Accuracy Requirements Resulted in Latent Inoperability and Operation Prohibited by Technical Specifications, LER 16-001-00 for St. Lucie Units 1 and 2 Regarding Inadequate Legacy Evaluation for Containment High Range Radiation Monitor Nonconformance with Design Accuracy Requirements Resulted in Latent Inoperability and Operation Prohibited by Technical.... L-2016-152, LER 16-001-00 for St. Lucie Units 1 and 2 Regarding Inadequate Legacy Evaluation for Containment High Range Radiation Monitor Nonconformance with Design Accuracy Requirements Resulted in Latent Inoperability and Operation Prohibited by Te2016-07-29029 July 2016 LER 16-001-00 for St. Lucie Units 1 and 2 Regarding Inadequate Legacy Evaluation for Containment High Range Radiation Monitor Nonconformance with Design Accuracy Requirements Resulted in Latent Inoperability and Operation Prohibited by Tech L-2010-255, Letter St. Lucie, Unit 2, Technical Specification Special Report Inoperable Reactor Water Level Monitoring System Channel Failed2010-11-0101 November 2010 Letter St. Lucie, Unit 2, Technical Specification Special Report Inoperable Reactor Water Level Monitoring System Channel Failed ML0414104442004-05-18018 May 2004 Technical Specification Special Report Inoperable Reactor Water Level Monitoring System Channel ML18127A6421978-09-22022 September 1978 LER 1978-032-00 for St. Lucie Unit 1, on 08/30/78 Concerning Daily Calibration of Nuc & ^T PWR (Technical Specification 4.3.1.1.1) Was Inadvertently Missed During One Surveillance Interval Encompassing Short Maintenance Outage & Subsequent ML18127A6431978-09-18018 September 1978 LER 1978-031-00 for St. Lucie Unit 1, on 08/16/78 Concerning the Ginca Code Operator Used Incorrect Flux Inputs in Arriving at the Incore Setpoints ML18127A6461978-09-0808 September 1978 LER 1978-030-00 for St. Lucie Unit 1, on 08/10/78 Concerning. the Surveillance Requirement of Specification 4.4.8 Which Requires an Isotopic Analysis for Iodine in the Primary Coolant, Was Inadvertently Missed ML18127A6471978-08-30030 August 1978 LER 1978-025-00 for St. Lucie Unit 1, on 07/31/78 Concerning Containment Vacuum Relief Valve (FCV-25-8) Instrument Air Supply Low Pressure Alarm Was Received. Cause Was Diaphragm Leak in Solenoid Valve Which Controls Instrument Air Supply ML18127A6481978-08-28028 August 1978 LER 1978-026-00 for St. Lucie Unit 1, on 07/30/78 Concerning During PWR Operation Digital Data Processing System Malfunctioned Resulting in Loss of CEA Backup Position Indication & Incore Flux Detector System Used to Monitor Flux D ML18127A6491978-08-25025 August 1978 LER 1978-025-00 for St. Lucie Unit 1, on 07/28/78 Concerning Notification by Applicant'S Vendor of Potential Problem with Certain Motor Operated Valves ML18127A6501978-08-0808 August 1978 LER 1978-011-01 for St. Lucie Unit 1, Update Concerning When Upper Guide Structure Was Removed (Refueling Shutdown), 3 (of 45) Incore Instrument Thimbles Remained in the Core ML18127A6511978-08-0707 August 1978 LER 1978-025-00 for St. Lucie Unit 1, on 07/24/78 Concerning an Error in the Analysis for the Cask Drop Accident Which Makes the Technical Specification 3.9.14 Non-Conservative ML18127A6521978-07-24024 July 1978 LER 1978-024-00 for St. Lucie Unit 1, on 06/25/78 Concerning During Plant Startup from a Short Maintenance, Dose Equivalent Iodine Exceeded Technical Specification 3.4.8.A Limit of 1.0 Uci/Gram Dose Equivalent ML18127A6531978-07-14014 July 1978 LER 1978-010-00 for St. Lucie Unit 1, One Channel of Steam Generator Low Pressure Measurement for Main Steam Isolation Signal Failed Requiring Action in Accordance with Technical Specification 3. 3. 2. I. B ML18127A6551978-07-13013 July 1978 LER 1978-022-00 for St. Lucie Unit 1, on 06/15/78 Concerning During PWR Operation, the Digital Data Processing System Malfunctioned Due to Malfunctioning Multiplexer Card ML18127A6541978-07-13013 July 1978 LER 1978-023-00 for St. Lucie Unit 1, on 05/15/78 Concerning During Testing Humidity Control Heaters on the Shield Bldg Ventilation System (B Train) Tripped on High Temperatures Due to High Temperature Caused by Low Flow ML18127A6561978-07-0808 July 1978 LER 1978-021-00 for St. Lucie Unit 1, on 06/08/78 Concerning During PWR Ascension Testing Following Refueling Outage CEA #65 Dropped Four Times Due to Failure of One or More of Its Coil PWR Programmer Timing Module, Integral Timer ML18127A6581978-07-0707 July 1978 LER 1978-020-00 for St. Lucie Unit 1, on 06/07/78 Concerning Pwer Ascension Physics Testing Following a Refueling Outage, CEA #65 Dropped ML18127A6601978-06-28028 June 1978 LER 1978-019-00 for St. Lucie Unit 1, on 05/30/78 Concerning During Special Low Pier Feedwater Control System Test a 15% Feedwater Bypass Control Valve Inadvertently Opened Fully Causing Excessive Cooling of 1A Steam Generator ML18127A6611978-06-26026 June 1978 LER 1978-018-00 for St. Lucie Unit 1, on 05/26/78 Concerning CEA #19 Dropped for No Apparent Reason ML18127A6621978-06-13013 June 1978 LER 1978-017-00 for St. Lucie Unit 1, on 05/14/78 Concerning Improper Switching at Pratt & Whitney Substation Combined with Incorrect Wiring of Protective Relays at Midway Substation Led to Deenergization of Midway Substation Resulting in L ML18127A6641978-06-0909 June 1978 LER 1978-016-00 for St. Lucie Unit 1, on 05/26/78 Concerning Containment Pressure-High Trip Setpoint (Table 2.2-1) Appeared to Be in Error During the Refueling Outage ML18127A6651978-05-23023 May 1978 LER 1978-015-00 for St. Lucie Unit 1, on 04/23/78 Concerning Operator Blew Down 1B Bamt Level Instrument to Prevent Sensing Line Blockage, Causing Instrument to Fail High ML18127A6681978-04-28028 April 1978 LER 1978-012-00 for St. Lucie Unit 1, on 04/16/78 Concerning Eddy Current Testing Performed on Fuel Assembly CEA Guide Tubes at Unit 1 Showed Near in Guide Tubes Where Tips of Fully Withdrawn CEAs Were Located ML18127A6691978-04-28028 April 1978 LER 1978-011-00 for St. Lucie Unit 1, When Upper Guide Structure Was Removed (Refueling Shutdown), 3 (of 45) Incore Instrument Thimbles Remained in the Core ML18127A6701978-04-27027 April 1978 LER 1978-013-00 for St. Lucie Unit 1, on 03/28/78 Concerning During Shutdown for Refueling, Dose Equivalent Iodine Exceeded Technical Specification 3.4.8 ML18127A6711978-04-25025 April 1978 LER 1978-010-00 for St. Lucie Unit 1, One Channel of Steam Generator Low Pressure Measurement for the Main Steam Isolation Signal Failed Requiring Action in Accordance with Technical Specification 3.3.2.1.B ML18127A6731978-03-30030 March 1978 LER 1978-009-00 for St. Lucie Unit 1, During PWR Operation Digital Data Processing System Malfunctioned. Apparent Momentary Memory Failure Caused Ddps to Halt ML18127A6741978-03-24024 March 1978 LER 1978-008-00 for St. Lucie Unit 1, Due to an Administrative Error During a Procedure Revision Instructions for Documenting Surveillance of Volume in Diesel Generator Engine Mounted Fuel Tanks Were Omitted ML18127A6791978-02-17017 February 1978 LER 1978-007-00 for St. Lucie Unit 1, Technical Specification 4.3.1.1.3 RTD Response Time ML18127A6781978-02-17017 February 1978 LER 1978-007-00 for St. Lucie Unit 1, Technical Specification 4.3.1.1.3 RTD Response Time ML18144A8051977-12-15015 December 1977 12/15/1977 Memo Reportable Occurrence 335-77-50 ML18110A8681977-10-24024 October 1977 LER 1977-335-39 for St. Lucie, Unit 1 on Refueling Water Tank Piping ML18110A8691977-09-26026 September 1977 LER 1977-335-35 for St. Lucie, Unit 1 on Intake Cooling Water Pump ML18110A8711977-09-15015 September 1977 LER 1977-335-34 for St. Lucie, Unit 1 on Containment Spray Header Valve ML18110A8731977-09-13013 September 1977 LER 1977-335-31 for St. Lucie, Unit 1 on Repair of Leaking Shaft Mechanical Seal of Component Cooling Water Pump ML18110A8741977-09-0909 September 1977 LER 1977-335-33 for St. Lucie, Unit 1 on Steam Driven Auxiliary Feedwater Pump ML18110A8751977-08-31031 August 1977 LER 1977-335-32 for St. Lucie, Unit 1 on Refueling Water Tank Level Setpoint Drift ML18110A8761977-07-14014 July 1977 LER 1977-335-30 for St. Lucie, Unit 1 on Detector Calibration ML18110A8771977-07-0808 July 1977 LER 1977-335-03 for St. Lucie, Unit 1 on Diesel Generator 1A, Update Report No. 1 ML18110A8781977-07-0808 July 1977 LER 1977-335-28 for St. Lucie, Unit 1 on Containment Isolation Valve ML18110A8791977-06-27027 June 1977 LER 1977-335-27 for St. Lucie, Unit 1 on Dropped Control Element Assembly No. 39 Initiating a Turbine Runback ML18110A8801977-06-16016 June 1977 LER 1977-335-26 for St. Lucie, Unit 1 on Off-Site Power ML18110A8821977-06-0303 June 1977 LER 1977-335-25 for St. Lucie, Unit 1 Setpoint of Bistable Trip Unit for Steam Generator Pressure Found Inadequately Conservative 2024-09-25
[Table view] |
Text
July 11, 2024 L-2024-117 10 CFR 50.73
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Re: St. Lucie Unit 2 Docket No. 50-389 Reportable Event: 2024-02-01 Date of Event: January 3, 2024
Safety Injection Tank Vent Through Wall Leakage
The attached Licensee Event Report, 2024-02-01, is being submitted pursuant to the requirements of 10 CFR 50.73 to provide notification of the subject event.
Should you have any questions regarding this submission, please contact Mr. Kenneth Mack, Fleet Licensing Manager, at 561-904-3635.
This letter contains no new or modified regulatory commitments.
Sincerely,
Paul Rasmus General Manager - Regulatory Affairs - Nuclear Fleet Florida Power & Light Company
Attachment
cc: St. Lucie NRC Senior Resident Inspector St. Lucie Station NRC Program Manager
Florida Pow er & Li ght Comp any
6501 S. Oc ean Driv e, Jen se n Beach, FL 3 4957 NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0104 EXPIRES: 04/30/2027 (04-02-2024) Estimated burden per response to comply wi1h this mandato,y collection request 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. Reported lessons
...)~~~,. learned are ineo<porated Into the licensing process and fed back to industry. Send comments regarding burden LICENSEE EVENT REPORT (LER) estimate to the FOIA, Library, and Information Collections Branch (T.e A10M), U. S. Nuclear Regulato,y email to lnfocollects.Resource@nrc.gov, and the 0MB reviewer
\\~)..... (See Page 2 for required number of digits/characters for each block) Commission, Washington, DC 20555-0001, or by at 0MB Office of Information and Regulato,y Affairs, (3150-0104), Attn: Desk Officer for the Nuclear Regulato,y (See NUREG-1022, R.3 for instruction and guidance for completing this form Commission, 725 17th Street NW, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is blllr /lwww DH, gQl/./rn~diog-mJ/dQ~llectioa~IDY[]lgs/st.ittlHl 022/r3/) not required to respond to, a collection of Information unless the document requesting or requiing the collection displays a currently vaid OM! con trol number.
- 1. Facility Name ~ 050 2. Docket Number 3. Page
St. Lucie Unit 2 D 052 00389 1 OF 2
- 4. Title
Safety Injection Tank Vent Line Through Wall Leakage
- 5. Event Date 6. LER Number 7. Report Date 8. Other Facilities Involved Month Day Year Year Sequential Revision Month Day Year Faclllty Name D Docket Number Number No. 050
Docket Number 01 02 2024 2024 - 02 - 01 7 11 2024 Facility Name D 052
- 9. Operating Mode 110. Power Level 3 0
- 11. This Report Is Submitted Pursuant to the Requirements of 1 O CFR §: (Check all that apply) 10 CFR Part 20 D 20.2203(a)(2)(vl) 10 CFR Part 50 [ZJ 50. 73(a)(2)(11)(A) D 50. 73(a)(2)(vlll)(A) D 73.1200(a)
D 20.2201(b) D 20.2203(a)(3)(i) D 50.36(c)(1)(1)(A) D 50. 73(a)(2)(ll1(B) D 50. 73(a)(2)(vlil)(B) D 73.1200(b)
D 20.2201(d) D 20.2203(a)(3)(il) D 50.36(c)(1 )(ll)(A) D 50. 73(a)(2)(111) D 50. 73(a)(2)(1x)(A) D 73.1200(c)
D 20.2203(a)(1) D 20.2203(a)(4) D 50.36(c)(2) D 50. 73(a)(2)(1v)(A) D 50.73(a)(2)(x) D 73.1200(d)
D 20.2203(a)(2)(1) 10 CFR Part 21 D 50.46(a)(3)(il) D 50. 73(a)(2)(v)(A) 10 CFR Part 73 D 73.1200(8)
D 20.2203(a)(2)(11) D 21.2(c) D 50.69(g) D 50.73(a)(2)(v)(B) D 73. 77(a)(1) D 73.1200(f)
D 20.2203(a)(2)(111) D 50. 73(a)(2)(i)(A) D 50. 73(a)(2)(v)(C) D 73. 77(a)(2)(1) D 73.1200(g)
D 20.2203(a)(2)(1v) D 50. 73(a)(2)(i)(B) D 50. 73(a)(2)(v)(D) D 73. 77(a)(2)(11) D 73.1200(h)
D 20.2203(a)(2)(v) D 50. 73(a)(2)(i)(C) D 50. 73(a)(2)(vll)
D OTHER (Specify here, in abstract, or NRC 366A).
- 12. Licensee Contact for this LER
Licensee Contact Phone Number (Include area code)
Bob Murrell 319-651-9496
- 13. Complete One Line for each Component Failure Described In this Report Cause System Component Manufacturer Reportable to IRIS Cause System Component Manufacturer Reportable to IRIS
B BQ PSF N/A y
- 14. Supplemental Report Expected Month Day Year 16. Expected Submission Date
[ZJ No Yes (If yes, complete 15. Expected Submission Date) D
- 16. Abstract (Limit to 1326 spaces, i.e., approximately 13 single-spaced typewritten lines)
This LER revision supersedes LER 2024-02-00 in its entirety.
On January 3, 2024, while in Mode 3, it was determined that the Reactor Coolant Pressure Boundary (RCPB) had a through wall flaw with Safety Injection Tank (SIT) leakage. The leakage was coming from the welded connection of a vent valve for SIT 2A2 outlet valve piping segment Sl-227. The cause of the leak was microcracks in weld material from a December 16, 2023, repair.
This leak resulted in the Unit being in a Degraded Condition. There were no Systems, Structures, or Components that were inoperable at the start of the event that contributed to the event. This event is being reported pursuant of 10 CFR 50.73(a)(2)
(ii)(A), Degraded Condition.
NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0104 EXPIRES: 04/30/2027 (04.02-2024) Estimated burd en per re sponse to co mply with this mandato ry co ll ec tion req ues t: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. Reported lessons le arned are incorporated into the lice nsing process and fed ba ck to industry. Send co mm ents LICENSEE EVENT REPORT (LER) regard ing burden estima te to th e FOIA, Library, and Inform ation Collections Branch (T-6 A10M), U. S.
Nuclear Regula tory Co mm ission, Was hinglon, DC 20 555-0001, or by email to CONTINUATION SHEET lnfocollects.Resource@ nrc.gov, and th e 0MB rev iewer at: 0MB Office of lnfonn ation and Regulatory Affairs, (3150-0104), Attn: Desk Office r for th e Nuclear Reg ul atory Commi ssion, 72 5 17th Stree t NW,
(See NUREG-1022, R.3 for instruct ion and guidance for completing this form Wa shington, DC 20503. Th e NRC may not co nd uc t or spon so r, and a perso n is not requ ired to http://www nrc gov/reading-rm/doc-coHections/nuregs/staff/sr1022/r3/) respond to, a collec ti on of information unless th e doc um ent requesting or requiring th e co llection di spl ays a currently valid 0MB co ntrol number.
- 1. FACILITY NAME 050 2. DOCKET NUMBER 3. LER NUMBER YEAR SEQUENTIAL REV 1st. Lucie Unit 2 I 00389 D NUMBER NO.
I~ 052 I ~-I 02 1-0
NARRATIVE
Description of Event:
On January 3, 2024, while in Mode 3, it was determined that the Reactor Coolant Pressure Boundary (RCPB) had a through wall flaw with Safety Injection Tank (SIT) leakage. The leakage was coming from the welded connection of a vent valve for SIT 2A2 outlet valve piping segment Sl-227. This leak resulted in the Unit being in a Degraded Condition. There were no Systems, Structures, or Components that were inoperable at the start of the event that contributed to the event.
Cause of Event:
The leak was caused by microcracks in weld material from a December 16, 2023, repair. These microcracks occurred during solidificat ion of the weld material.
Safety Significance :
This event did not prevent any safety systems from performing their safety related functions based on the minimal amount of leakage identified.
This Licensee Event Report is being reported pursuant of 10 CFR 50.73(a)(2)(ii)(A), Degraded Condition.
This event did not result in a Safety System Functional Failure.
Corrective Act ions:
Repairs to Sl-227 were completed on January 5, 2024.
Sim ilar Events:
A review of events over the past 5 years identified one previous event that involved a similar underlying cause of the event reported under this Licensee Event Report. This event is documented in LER 2024-01, Sa fety Injection Tank Vent Line Through Wall Leakage, dated February 13, 2024. The cause of that event was stresses resulting fatigue crack initiation and propagation.
NRC FORM 3 66A (04 -0 2-2 024) Page 2 of 2