|
---|
Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] Category:License-Operator
MONTHYEARIR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22147A1882022-04-13013 April 2022 04 Public Forms ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams 2023-08-14
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23114A1542023-03-23023 March 2023 03 Public Forms 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML22147A1882022-04-13013 April 2022 04 Public Forms ML22133A2922022-04-13013 April 2022 04 Post Examination Analysis ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21235A1762021-08-26026 August 2021 ANO1 2022-04 Corporate Notification Letter Cco ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A2862021-04-0808 April 2021 3_AN2-2021-03 Draft Written Exam ML21134A2422021-04-0808 April 2021 9_AN2-2021-03 Final Operating Test ML21137A2892021-04-0808 April 2021 6_AN2-2021-03 Operating Test Comments (Final) ML21137A2872021-04-0808 April 2021 4_AN2-2021-03 Draft Written Exam Comments ML21134A2412021-04-0808 April 2021 8_AN2-2021-03 Final Written Exam ML21137A2882021-04-0808 April 2021 5_AN2-2021-03 Draft Operating Test ML21137A2842021-04-0808 April 2021 1_AN2-2021-03 Draft Outlines ML21137A2902021-04-0808 April 2021 7_AN2-2021-03 Final Outlines ML21137A2852021-04-0808 April 2021 2_AN2-2021-03 Outline Comments ML21137A2772021-04-0808 April 2021 Examination Outline Quality Checklist ML21075A0362021-03-18018 March 2021 NRC Initial Operator Licensing Examination Approval 05000368/2021301 ML20233A9252020-06-0505 June 2020 AN1-2020-04 Final Outlines ML20233A9212020-06-0505 June 2020 AN1-2020-04 Draft Operating Test Comments ML20233A9192020-06-0505 June 2020 AN1 2020-04 Draft Written Comments ML20233A9222020-06-0505 June 2020 AN1-2020-04 Draft Operating Test ML20233A9202020-06-0505 June 2020 AN1-2020-03 Draft Outline Comments ML20233A9242020-06-0505 June 2020 AN1-2020-04 Draft Written Exam 1CAN101904, AN1-2020-04 Draft Outlines2020-06-0505 June 2020 AN1-2020-04 Draft Outlines ML20204A8072020-06-0404 June 2020 AN1-2020-04 Final Written Exam ML20204A8062020-06-0404 June 2020 AN1-2020-04 Final Op Test ML20085F8292020-03-25025 March 2020 NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 ML20079L9512020-03-19019 March 2020 NRC Initial Operator Licensing Examination Approval 05000313/2020301 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000368/20193012019-06-13013 June 2019 NRC Examination Report 05000368/2019301 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations 0CAN041801, Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-24024 April 2018 Response to Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18096A1012018-03-0707 March 2018 2018-02-Public Forms ML18051A4252018-02-16016 February 2018 NRC Initial Operator Licensing Examination Approval 05000313/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17240A3832017-06-15015 June 2017 2017-06-Post Exam Analysis ML17240A3802017-06-15015 June 2017 2017-06-Final Written Exams ML18046B4422017-06-15015 June 2017 2017-06 - Public Forms ML18045A4962017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outlines ML18045A4982017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam ML18045A4942017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Outline Comments ML18045A4922017-06-15015 June 2017 2017-06 - Proposed Retake Written Exam Comments 2023-08-14
[Table view] |
Text
We request that all examination materials related to the ANO Unit 2 2023 NRC Operator License Examinations be withheld from public disclosure for a period of two years.
Enclosure 1 2CAN032305 2023 ILO NRC Written Exam Applicant Questions and Comments during Exam
2023 Unit 2 ILO NRC Written Exam Administered March 15th, 2023 APPLICANT QUESTIONS AND RESPONSES APPLICANT QID# TIME APPLICANT QUESTION/COMMENT PROCTOR RESPONSE NAME/DOCKET #
8 0937 Brandon Tribble/55-72723 Is this failure on the input or output of The conditions and the controller? stem of the question were read back to the applicant. No further information was provided. The conditions state that the failure is from the pressure transmitter, which is the input to the controller.
42 1042 Caleb Walker/55-76377 Do I assume current plant alignment? The conditions and the stem were read back to the applicant. No additional information was provided. From the
briefing, the applicants are not to assume any additional failures or plant alignments unless specifically stated in the stem or conditions of the question.
81 1137 Brandon Tribble/55-72723 The question stem refers to regulated After a discussion voltage but the reference refers to with the exam team, unregulated voltage points. What are the determined that the unregulated voltage values? applicant did not need unregulated voltage to answer the question (the applicant can deduce the values from the information given).
No additional information was provided.
21 1141 Josef Nichols/55-76378 Do I consider the plant conditions in the The conditions and stem to determine which radiation the stem were read monitor to use or do I just answer based back to the on what the Annunciator Corrective applicant. No Action says? additional
information was provided. The conditions of the question render one of the radiation monitors incapable of monitoring radiation.
25 1143 Josef Nichols/55-76378 Do I consider the rate of Containment The conditions and sump level rise as a leakrate? the stem were read back to the applicant. No addition information was provided. The question conditions state that the sump is rising at 10 gpm, not that a leakrate has been performed.
24 1301 Kyle Rollans/55-76375 Sometimes we drain the sump and The conditions and sometimes we drain to the Hold-Up tank. stem were read back Which do I consider to be normal? to the applicant. No additional information was provided. The conditions in the stem determine
which method is used (at normal full power).
99 1303 Brandon Tribble/55-72723 When answering this question, do I The conditions and consider the situation in which the SM stem were read back becomes incapacitated? to the applicant. No additional information was provided. The stem of the question does not ask about when the SM becomes incapacitated. It asks about when the SM can delegate authority.
67 1408 Kyle Rollans/55-76375 What does most limiting Tech Spec The conditions and action mean? Does that mean the action stem were read back that has the shortest time to take an to the applicant. No action or does that mean the action that additional will place the plant in Mode 3 the information was fastest? provided. The stem of the question asks about the most limiting tech spec action (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or less action) which also
corresponds to having to be in Mode 3 within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
This information did not need to be clarified to answer the question.
28 1409 Brian Pawlowski/55-73399 What is the noun name for 2F-3A/B in After a discussion answer choice A? with the exam team and referring to the procedure noun name for 2PSV-4800 and looking at the question, the noun name for 2F-3A/B was not needed to answer the question.
There is only one set of filters in the CVCS system. No additional information was provided.
72 1439 Kyle Rollans/55-76375 How long has the plant been stable? This information was not needed to answer the question.
Read stem and answer choices to the applicant. No further information was provided.
71 1540 Brian Pawlowski/55-73399 Brian stated that he thought this Recorded his question had two correct answers (B and comment and read C). He did not have a question only question and answer wanted to make this comment. choices to applicant.
No additional information was provided. Applicant was reading too much into distractor C.
We request that all examination materials related to the ANO Unit 2 2023 NRC Operator License Examinations be withheld from public disclosure for a period of two years.
Enclosure 2 2CAN032305 2023 ILO NRC Written Post-Exam Analysis
2023 Unit 2 ILO NRC Exam Analysis 3/15/2023 RO SROI SROU Overall CORRECT R4 R1 R2 R3 I2 I1 I3 U1 U2 U3 % Missed 1 B 1 2 A B B B 30% 2 3 A 3 4 C 4 5 D 5 6 D 6 7 C 7 8 A C 10% 8 9 A 9 10 C 10 11 B 11 12 C 12 13 B D 10% 13 14 C D 10% 14 15 D 15 16 B 16 17 D B 10% 17 18 A 18 19 D 19 20 A 20 21 B 21 22 A 22 23 B 23 24 D C B 20% 24 25 C 25 26 B 26 27 D C C C 30% 27 28 A B C 20% 28 29 C A D 20% 29 30 B 30 31 A 31 32 A 32 33 C 33 34 D 34 35 C D 10% 35 36 C 36 37 D 37 38 B C 10% 38 39 D 39 40 D 40 41 A 41 42 B D D A 30% 42 43 D B 10% 43 44 B 44 45 B 45
46 A 46 47 C 47 48 C D 10% 48 49 A B 10% 49 50 B A A 20% 50 51 B A 10% 51 52 A 52 53 C A 10% 53 54 D C 10% 54 55 D C 10% 55 56 B 56 57 A B 10% 57 58 B 58 59 B A A A 30% 59 60 D 60 61 B D 10% 61 62 C 62 63 A B B 20% 63 64 A 64 65 D 65 66 A 66 67 C A A A A A A 60% 67 68 C B D B 30% 68 69 A B 10% 69 70 D B B 20% 70 71 B A C C 30% 71 72 C A 10% 72 73 B 73 74 D 74 75 C B B B 30% 75 76 D 76 77 D 77 78 C 78 79 B 79 80 A 80 81 A 81 82 C 82 83 A 83 84 B 84 85 C A 17% 85 86 A 86 87 B A 17% 87 88 C 88 89 D B 17% 89 90 B 90 91 A 91 92 D 92 93 A D B C 50% 93 94 D 94
95 B 95 96 C 96 97 B C A C A 67% 97 98 C D B 33% 98 99 C A 17% 99 100 D 100 96.0 88.0 97.0 98.0 92.0 96.0 86.6 94.6 88.0 84.0 91.0 88.0 97.0 99.0 98.0 92.2 Class Avg 91.3 RO Avg 92.8 SRO Avg OVERALL Avg 84.0 88.0 84.0 96.0 100.0 96.0 SRO section 91.3 96.0 86.6 94.6 88.0 84.0 92.0 89.3 97.3 98.6 98.6 RO section 92.5
We request that all examination materials related to the ANO Unit 2 2023 NRC Operator License Examinations be withheld from public disclosure for a period of two years.
Enclosure 3 2CAN032305 2023 ILO NRC Written Post-Exam Analysis Tier 4 Only
2023 Unit 2 ILO NRC Exam Analysis-TIER 4 GFES SECTION 3/15/2023 RO SROI SROU Overall CORRECT R4 R1* R2 R3 I2 I1 I3 U1 U2 U3 % Missed 70 D B B 20% 70 71 B A C C 30% 71 72 C A 10% 72 73 B 73 74 D 74 75 C B B B 30% 75
- R1 did NOT take NRC GFES exam
We request that all examination materials related to the ANO Unit 2 2023 NRC Operator License Examinations be withheld from public disclosure for a period of two years.
Enclosure 4 2CAN032305 2023 ILO NRC Written Exam Post-Exam Applicant Comments
2023 Unit 2 ILO NRC Written Exam Administered March 15th, 2023 POST-EXAM APPLICANT COMMENTS Below are the applicant post-exam comments concerning the NRC Written Exam.
QID# MISS RATE APPLICANT COMMENTS During post-exam review, applicants stated the following reasons for answering this question incorrectly:
Incorrectly applied Tech Spec action for Minimum Temperature for Criticality rather than the Tech Spec for Tcold Did not recall that RWT boron concentration had an upper limit of 3000 ppm 67 60%
(thought Tech Spec LCO was just greater than 2500 ppm with no upper limit)
Applicants agreed this was a valid question with the approved answer key being correct.
During post-exam review, applicants stated the following reasons for answering this question incorrectly:
Applicants did not recall the procedural requirement of 10% power change requirement to be High Risk reactivity management evolution. Rationalized 5%
93 50%
as being correct when the procedural limit could not be recalled.
Applicants did not recall 5.3 HgA limit in the normal operating procedure for condenser vacuum. Incorrectly applied Loss of Condenser Vacuum AOP limit of 5.15 HgA for AOP exit.
Applicants agreed that this was a valid question with the approved answer key being correct.
During post-exam review, applicants stated the following reasons for answering this question incorrectly:
Applicants incorrectly determined that a eSOMS Component deviation record was required to be performed. This is not a requirement of OP-3305.002.
Applicants incorrectly determined that a removed from service marker was required to be placed on the window whenever the procedure OP-3305.002 97 67% directs to NOT place removed from service marker on window due to it being a reflash annunciator. Applicant stated that they read too much into this question and did not recall the procedural requirement.
Applicants agreed that this was a valid question with the approved answer key being correct.
We request that all examination materials related to the ANO Unit 2 2023 NRC Operator License Examinations be withheld from public disclosure for a period of two years.
Enclosure 5 2CAN032305 2023 ILO NRC Written Exam Seating Chart
2023 Unit 2 ILO NRC Written Exam Administered March 15th, 2023 Seating Chart (Front: West)
Proctors SRO SRO Wyett Nichols RO RO Rollans Davis SRO SRO Hendrix Pawlowski RO RO Kendrick Walker SRO SRO Tribble Alexander
We request that all examination materials related to the ANO Unit 2 2023 NRC Operator License Examinations be withheld from public disclosure for a period of two years.
Enclosure 6 2CAN032305 2023 ILO NRC Written Exam Post-Exam Performance Analysis Results
2023 Unit 2 ILO NRC Written Exam Administered March 15th, 2023 PERFORMANCE ANALYSIS FOR WRITTEN EXAM The threshold for determination of questions to be analyzed was a miss rate of 50% or higher.
Below are the applicant comments concerning these questions and the results of the exam analysis.
QID# MISS RATE APPLICANT COMMENTS ANALYSIS RESULT During post-exam review, applicants stated the ANO Unit 2 recommends that this following reasons for answering this question answer should not be changed and incorrectly: the question should not be deleted Incorrectly applied Tech Spec action for or modified.
Minimum Temperature for Criticality rather than the Tech Spec for Tcold WTANO-2022-239 CA 24 initiated to Did not recall that RWT boron concentration perform a training needs analysis to 67 60% had an upper limit of 3000 ppm (thought address this knowledge deficiency.
Tech Spec LCO was just greater than 2500 ppm with no upper limit)
Applicants agreed this was a valid question with the approved answer key being correct.
During post-exam review, applicants stated the ANO Unit 2 recommends that this following reasons for answering this question answer should not be changed and incorrectly: the question should not be deleted Applicants did not recall the procedural or modified.
requirement of 10% power change requirement to be High Risk reactivity WTANO-2022-239 CA25 initiated to management evolution. Rationalized 5% as perform a training needs analysis to being correct when the procedural limit address this knowledge deficiency.
could not be recalled.
93 50%
Applicants did not recall 5.3 HgA limit in the normal operating procedure for condenser vacuum. Incorrectly applied Loss of Condenser Vacuum AOP limit of 5.15 HgA for AOP exit.
Applicants agreed that this was a valid question with the approved answer key being correct.
During post-exam review, applicants stated the ANO Unit 2 recommends that this following reasons for answering this question answer should not be changed and incorrectly: the question should not be deleted Applicants incorrectly determined that a or modified.
97 67% eSOMS Component deviation record was required to be performed. This is not a WTANO-2022-239 CA26 initiated to requirement of OP-3305.002. perform a training needs analysis to Applicants incorrectly determined that a address this knowledge deficiency.
removed from service marker was required
to be placed on the window whenever the procedure OP-3305.002 directs to NOT place removed from service marker on window due to it being a reflash annunciator.
Applicant stated that they read too much into this question and did not recall the procedural requirements.
Applicants agreed that this was a valid question with the approved answer key being correct.
We request that all examination materials related to the ANO Unit 2 2023 NRC Operator License Examinations be withheld from public disclosure for a period of two years.
Enclosure 7 2CAN032305 2023 ILO NRC Written Exam Training Analysis Corrective Actions
CORRECTIVE ACTION WT-WTANO-2022-00239 CA Number: 24 Site Group Name Assigned By: ANO Training Operations Staff ANO Harris,James P Assigned To: ANO Training Operations Staff ANO Rowbotham,Theron Subassigned To :
Originated By: Rowbotham,Theron 3/30/2023 09:21:44 Performed By:
Subperformed By:
Approved By:
Closed By:
Current Due Date: 06/01/2023 Initial Due Date: 06/02/2023 CA Type: TRAINING ACTION CA Priority: NOT USED Plant Constraint: TRAINING TRACKING CA
Description:
Action:
Perform a training screening and a training needs analysis as necessary for the high missed question on the 2023 Unit 2 NRC ILO Exam for the following K/A to address this knowledge deficiency.
(G2.2.39) Equipment Control: Knowledge of less than or equal to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TS action statements (does not include action statements of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or less that follow the expiration of a completion time for a TS condition for which an action statement has already been entered)
This high missed question was covered with the 2023 Unit 2 ILO Class during the exam debrief to ensure all gaps associated with this question was closed.
Response
Subresponse :
Closure Comments:
CORRECTIVE ACTION WT-WTANO-2022-00239 CA Number: 25 Site Group Name Assigned By: ANO Training Operations Staff ANO Harris,James P Assigned To: ANO Training Operations Staff ANO Rowbotham,Theron Subassigned To :
Originated By: Rowbotham,Theron 3/30/2023 09:25:11 Performed By:
Subperformed By:
Approved By:
Closed By:
Current Due Date: 06/08/2023 Initial Due Date: 06/09/2023 CA Type: TRAINING ACTION CA Priority: NOT USED Plant Constraint: TRAINING TRACKING CA
Description:
Action:
Perform a training screening and a training needs analysis as necessary for the high missed question on the 2023 Unit 2 NRC ILO Exam for the following K/A to address this knowledge deficiency.
(075)(SF8 CW) CIRCULATING WATER SYSTEM (G2.1.37) CONDUCT OF OPERATIONS: Knowledge of procedures, guidelines, or limitations associated with reactivity management.
This high missed question was covered with the 2023 Unit 2 ILO Class during the exam debrief to ensure all gaps associated with this question was closed.
Response
Subresponse :
Closure Comments:
CORRECTIVE ACTION WT-WTANO-2022-00239 CA Number: 26 Site Group Name Assigned By: ANO Training Operations Staff ANO Harris,James P Assigned To: ANO Training Operations Staff ANO Rowbotham,Theron Subassigned To :
Originated By: Rowbotham,Theron 3/30/2023 09:27:39 Performed By:
Subperformed By:
Approved By:
Closed By:
Current Due Date: 06/01/2023 Initial Due Date: 06/02/2023 CA Type: TRAINING ACTION CA Priority: NOT USED Plant Constraint: TRAINING TRACKING CA
Description:
Action:
Perform a training screening and a training needs analysis as necessary for the high missed question on the 2023 Unit 2 NRC ILO Exam for the following K/A to address this knowledge deficiency.
(G2.2.43) EQUIPMENT CONTROL: Knowledge of the process used to track inoperable alarms.
This high missed question was covered with the 2023 Unit 2 ILO Class during the exam debrief to ensure all gaps associated with this question was closed.
Response
Subresponse :
Closure Comments: