RA23-014, 75-Day Exam Submittal Letter
| ML23067A053 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 02/15/2023 |
| From: | Hansett P Constellation Energy Generation |
| To: | NRC/RGN-III |
| Travis Iskierka-Boggs | |
| Shared Package | |
| ML21188A267 | List: |
| References | |
| RA23-014 | |
| Download: ML23067A053 (1) | |
Text
Constellation T RA23-014 February 15, 2023 U.S. Nuclear Regulatory Commission Attention: NRC Region Ill Administrator 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 LaSalle County Station 2601 North 21 " Road Marseilles. IL 61341 815-415-2000 Telephone
Subject:
Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials, which LaSalle County Station is submitting in support of the initial license exam scheduled for the weeks of May 1 through May 13, 2023, at the LaSalle County Station.
This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.
These examination materials have been developed in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 12. Please note that reference materials are attached to each individual examination question or item.
[Some minor modifications have been made to the Integrated Examination Outline with regards to the operational scenarios in order to improve balance and content. These changes improve examination quality and are in compliance with NUREG-1021, Revision 12, "Operator Licensing Examination Standards for Power Reactors."]
Some modifications or adjustments to the examination material may be required due to procedural changes.
In accordance with NUREG-1021, Revision 12, Section ES-1.3, Examination Security, please ensure that these materials are withheld from public disclosure until after the examinations are complete.
Should you have any questions concerning this letter, please contact Mr. Daniel Mearhoff, Regulatory Assurance Manager, at (815) 415-2800. For questions concerning examination materials, please contact Mr. Karl Heuser, Examination Author, at 779-231-5137.
Respectfully, w~
Phil W. Hansett Site Vice President LaSalle County Station
RA23-014 U.S. Nuclear Regulatory Commission February 15, 2023 Page 2 of 2
Enclosures:
RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:
Examination Security Agreements (Form 1.3-1)
Operating Test Quality Checklist (Form 2.3-2)
Written Exam Quality Checklist (Form 2.3-4)
Events and Evolutions Checklist (Form 3.4-1)
Record of Rejected K/As (Form 4.1-1) cc: (without attachments)
Chief, NRC Operator Licensing Branch NRC Senior Resident Inspector-LaSalle County Station