ND-22-0777, ITAAC Closure Notification on Completion of ITAAC 2.2.05.01 (Index Number 252)
| ML22293B788 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/20/2022 |
| From: | Coleman J Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ND-22-0777 | |
| Download: ML22293B788 (5) | |
Text
,~ Southern Nuclear Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4 Docket No.:
52-026 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 7825 River Road Waynesboro, GA 30830 706-848-6926 tel ND-22-0777 10 CFR 52.99(c)(1)
ITAAC Closure Notification on Completion of ITAAC 2.2.05.01 (Index Number 2521 Ladies and Gentlemen:
In accordance with 1 O CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 4 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.2.05.01 (Index Number 2521.
This ITAAC verified the functional arrangement of the as-built Main Control Room Emergency Habitability System (VES) is as described in the Design Description of Combined License (COL)
Appendix C, Section 2.2.5. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 1 O CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.
This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 1 O CFR 52.99.
If there are any questions, please contact Kelli Roberts at 706-848-6991.
Respectfully submitted,
~
ma~yYl~
Regulatory Affairs Director Vogtle 3 & 4
Enclosure:
JMC/PAW/sfr Vogtle Electric Generating Plant (VEGP) Unit 4 Completion of ITAAC 2.2.05.01 flndex Number 2521 October 20, 2022
U.S. Nuclear Regulatory Commission ND-22-0777 Enclosure Page 2 of 2 cc:
Regional Administrator, Region II Director, Office of Nuclear Reactor Regulation (NRR)
Director, Vogtle Project Office NRR Senior Resident Inspector - Vogtle 3 & 4
U.S. Nuclear Regulatory Commission ND-22-0777 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-22-0777 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 4 Completion of ITAAC 2.2.05.01 [Index Number 252]
U.S. Nuclear Regulatory Commission ND-22-0777 Enclosure Page 2 of 3 ITAAC Statement Design Commitment
- 1. The functional arrangement of the VES is as described in the Design Description of this Section 2.2.5.
Inspections, Tests, Analyses:
Inspection of the as-built system will be performed.
Acceptance Criteria:
The as-built VES conforms with the functional arrangement described in the Design Description of this Section 2.2.5.
ITAAC Determination Basis An inspection of the as-built Main Control Room Emergency Habitability System (VES) was conducted after completion of construction to confirm that the functional arrangement of the VES is as described in the Design Description of Combined License (COL) Appendix C Section 2.2.5. This inspection encompassed the structures, systems, and components (SSCs) identified in the COL Appendix C Section 2.2.5, Design Description, including Figure 2.2.5-1 and Table 2.2.5-6.
The inspection (walkdown) was completed in accordance with ND-RA-001 -012, Functional and Physical Arrangement Scoping Process (Reference 1 ), which required the preparation of a detailed inspection plan. This inspection plan included the use of detailed drawings such as Piping and Instrumentation Drawings (P&IDs) or Single Line Elementary Drawings to perform visual observations and compare the as-built system to the Design Description.
The inspection results are documented in SV4-VES-ITR-900252, Revision O (Reference 2) supporting the Unit 4 ITAAC 2.2.05.01 Completion Package (Reference 3) and verified that the SSCs are physically arranged and located to perform the functions described in the Design Description and referenced figure and table. The inspection results confirm that the as-built VES conforms with the functional arrangement as described in the COL Appendix C Section 2.2.5, Design Description.
The Principal Closure Document is available for NRC inspection as well as the ITAAC 2.2.05.01 Completion Package.
U.S. Nuclear Regulatory Commission ND-22-0777 Enclosure Page 3 of 3 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject IT AAC and associated corrective actions. This review found that there are no relevant IT AAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package (Reference 3) and is available for NRC review.
ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.2.05.01 was performed for VEGP Unit 4 and that the prescribed acceptance criteria are met.
Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.
References (available for NRC inspection)
- 1. ND-RA-001 -012, Version 6.0, Functional and Physical Arrangement Scoping Process
- 2. SV4-VES-ITR-900252, Revision 0, Unit 4 Functional Arrangement Inspection: ITAAC 2.2.05.01 NRC Index Number 252
- 3. 2.2.05.01-U4-CP-Rev0, ITAAC Completion Package