ND-20-1199, ITAAC Closure Notification on Completion of ITAAC 2.2.02.01 (Index Number 119)

From kanterella
(Redirected from ML21272A298)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC 2.2.02.01 (Index Number 119)
ML21272A298
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 09/29/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ITAAC 2.2.02.01, ND-20-1199
Download: ML21272A298 (6)


Text

^Southern Nuclear Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tel SEP 2 9 2021 Docket Nos.: 52-025 ND-20-1199 10CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.2.02.01 [Index Number 1191 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant(VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.2.02.01 [Index Number 119]. This ITAAC verified that the functional arrangement of the Passive Containment Cooling System (PCS) is as described in the Design Description of Combined License (COL)

Appendix C, Section 2.2.2. The closure process for this ITAAC is based on the guidance described in NEI-08-01, Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company(SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli A. Roberts at 706-848-6991.

Respectfully submitted.

Michael J. Yox

Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.2.02.01 [Index Number 119]

MJY/JRV/sfr

U.S. Nuclear Regulatory Commission ND-20-1199 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKinney Mr. H. Nieh Mr. M. D. Meier Mr. G. Chick Mr. 8. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. 8. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Belike Mr. 8. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil M C. P. Patei M . G. J. Khouri M C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gasievic M O. Lopez-Santiago M G. Armstrong M M. Webb M T. Fredette M C. Santos M B. Davis M J. Vasquez M J. Eargie M E. Davidson M T. Faneiii Ms. K. McCurry M J. Parent M B. Griman

U.S. Nuclear Regulatory Commission ND-20-1199 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinahouse Electric Company. LLC Dr. L. Oriani Mr. D. 0. Durham Mr. M. M. CorlettI Mr. Z. S. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, inc.

Mr. 8. Roetger, Georgia Pubiic Service Commission Mr. R. L. Trokey, Georgia Pubiic Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-20-1199 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-1199 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.2.02.01 [Index Number 119]

U.S. Nuclear Regulatory Commission ND-20-1199 Enclosure Page 2 of 3 ITAAC Statement Design Commitment:

1. The functional arrangement of the PCS is as described in the Design Description of this Section 2.2.2.

inspections. Tests. Analyses:

inspection of the as-buiit system will be performed.

Acceptance Criteria:

The as-buiit PCS conforms to the functional arrangement as described in the Design Description of this Section 2.2.2.

ITAAC Determination Basis An inspection of the as-buiit Passive Containment Cooling system (PCS) was conducted after completion of construction to confirm that the functional arrangement of the PCS is as described in the Design Description of Combined License(COL) Appendix C, Section 2.2.2. This inspection encompassed the structures, systems, and components(SSCs) identified in the COL Appendix C, Section 2.2.2, Design Description, including Table 2.2.2-1, Table 2.2.2-2, Table 2.2.2-4 and Figure 2.2.2-1.

The inspection (walkdown) was completed in accordance with ND-RA-001-012, Functional and Physical Arrangement Scoping Process(Reference 1), which required the preparation of a detailed inspection plan. This inspection plan included the use of detailed drawings such as Piping and Instrumentation Drawings (P&IDs) or Single Line Elementary Drawings to perform visual observations and compare the as-built system to the Design Description.

The inspection results are documented in the Unit 3 Principal Closure Document(Reference 2) supporting the Unit 3 ITAAC 2.2.02.01 Completion Package (Reference 3) and verified that the SSCs are physically arranged and located to perform the functions described in the Design Description and referenced figure and tables. The inspection results confirm that the as-built PCS conforms with the functional arrangement as described in the COL Appendix C, Section 2.2.2, Design Description.

Reference 2 is available for NRC inspection as part of the Unit 3 ITAAC 2.2.02.01 Completion Packages (Reference 3).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found that there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.2.02.01 (Reference 3)and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-20-1199 Enclosure Page 3 of 3 ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRG that ITAAC 2.2.02.01 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References(available for NRG Inspection

1. ND-RA-001-012, Version 6.0, Functional and Physical Arrangement Scoping Process
2. SV3-PCS-ITR-800119, Revision 2, Unit 3 PCS Functional Arrangement Inspection: ITAAC 2.2.02.01 NRC Index Number 119
3. 2.2.02.01-U3-CP-RevO, ITAAC Completion Package
4. NEI 08-01,"Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"