ND-20-0946, ITAAC Closure Notification on Completion of ITAAC 2.2.04.09a.ii (Index Number 241)

From kanterella
(Redirected from ML21147A383)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC 2.2.04.09a.ii (Index Number 241)
ML21147A383
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/27/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-0946
Download: ML21147A383 (7)


Text

Michael J. Yox 7825 River Road Southern Nuclear Regulatory Affairs Director Waynestxjro, GA 30830 Vogtle 3 & 4 706-848-6459 tel Docket No.: 52-025 MAY 2 7 2021 ND-20-0946 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.2.04.09a.ii rindex Number 2411 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtle Electric Generating Plant(VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.2.04.09a.ii [Index Number 241]. This ITAAC verified that the Main and Startup Feedwater pumps trip to limit feedwater flow to the steam generators. The closure process for this ITAAC is based on the guidance described in NEI 08-01,"Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52", which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company(SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Direfctor Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.2.04.09a.ii [Index Number 241]

MJY/DLW/sfr

U.S. Nuclear Regulatory Commission ND-20-0946 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKinney Mr. M. D. Meier Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. M. Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil M . C. P. Pate!

M . G. J. Khouri M C. J. Even M B. J. Kemker Ms. N. C. Coovert M . C. Welch M . J. Gaslevic M . O. Lopez-Santiago M G. Armstrong M M. Webb M T. Fredette M C. Santos M B. Davis M J. Vasquez M J. Eargle M E. Davidson M T. Fanelli Ms. K. McCurry M J. Parent M B. Griman

U.S. Nuclear Regulatory Commission ND-20-0946 Page 3 of 3 Qqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-20-0946 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-20-0946 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.2.04.09a.ii [Index Number 241]

U.S. Nuclear Regulatory Commission ND-20-0946 Enclosure Page 2 of 4 ITAAC Statement Design Commitment 9.a) Components within the main steam system, main and startup feedwater system, and the main turbine system identified in Table 2.2.4-3 provide backup isolation of the SGS to limit steam generator blowdown and feedwater flow to the steam generator.

I nspections/Tests/Analvses ii) Testing will be performed to confirm the trip of the pumps identified in Table 2.2.4-3.

Acceptance Criteria ii) The pumps identified in Table 2.2.4-3 trip after a signal is generated by the RMS.

ITAAC Determination Basis Multiple ITAAC are performed to verify components within the main steam system, main and startup feedwater system, and the main turbine system identified in Table 2.2.4-3 provide backup isolation of the Steam Generator System (SGS)to limit steam generator blowdown and feedwater flow to the steam generator. The subject ITAAC performs testing to confirm the trip of the pumps identified in Combined License(COL) Appendix C Table 2.2.4-3(Attachment A) after a trip is generated by the Protection and Safety Monitoring System (PMS).

Testing was performed in accordance with Unit 3 component test Work Order 1109889 (Reference 1) and documented in SV3-SGS-ITR-800241 (Reference 2). This component test utilized B-GEN-ITPCI-039 Forms F033 through F037 to direct the performance of testing to verify that the pumps in Attachment A tripped after a signal was generated by the PMS.

The component test established initial conditions with each pump breaker in the test condition and closed. An actuation signal was generated by PMS using the PMS Maintenance and Test Panel(MTP)to trip the pump breakers. Each breaker was verified locally to be open (trip position) after the receipt of the trip signal.

The completed Unit 3 test results (References 1 and 2) confirm that the pumps identified in Table 2.2.4-3 trip after a signal is generated by the PMS.

References 1 and 2 are available for NRC inspection as well as the ITAAC 2.2.04.09a.ii Completion Package (Reference 3).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.2.04.09a.ii (Reference 3) and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-20-0946 Enclosure Page 3 of 4 ITAAC Completion Statement Based on the above information, SNO hereby notifies the NRG that ITAAC 2.2.04.09a.ii was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References favailable for NRG inspection)

1. Work Order 1109889,"Perform ITAAC PMS CIM Component Test FWS-MP-02A & FWS-MP-02B & FWS-MP-02C & FWS-MP-03A & FWS-MP-03B"
2. SV3-SGS-ITR-800241 Rev. 0,"Unit 3 Recorded Results of Main and Startup Feedwater Pump Trip After PMS Signal: ITAAC 2.2.04.09a.ii"
3. 2.2.04.09a.ii-U3-CP-Rev0, ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-20-0946 Enclosure Page 4 of 4 Attachment A "Excerpt from COL Appendix C Table 2.2.4-3 Table 2.2.4-3 Equipment Name* Tag No.* Control Function*

Main Feedwater Pump FWS-MP-02A Trip Main Feedwater Pump FWS-MP-02B Trip Main Feedwater Pump FWS-MP-02C Trip Startup Feedwater Pump FWS-MP-03A Trip Startup Feedwater Pump FWS-MP-03B Trip