ND-21-0434, ITAAC Closure Notification on Completion of 2.1.02.13a (Index Number 063)

From kanterella
(Redirected from ML21123A052)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of 2.1.02.13a (Index Number 063)
ML21123A052
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/01/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-21-0434
Download: ML21123A052 (6)


Text

Southern Nuclear Michael J. vox Regulatory Affairs Director 7825 River Road V\faynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 MAY 0 1 2021 Docket No.: 52-025 ND-21-0434 10CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of 2.1.02.13a findex Number 0631 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtle Electric Generating Plant(VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.1.02.13a [Index Number 063]. This ITAAC confirms Plant Control System controls in the main control room operate to trip the reactor coolant pumps. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) request NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli A. Roberts at 706-848-6991.

Respectfully submitted, Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.1.02.13a [Index Number 063]

MJY/RAS/sfr

U.S. Nuclear Regulatory Commission ND-21-0434 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKinney Mr. M. D. Meier Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Vox Mr. A. S. Parton Ms. K. A. Roberts Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. M.Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil M . C. P. Patel M . G. J. Khouri M . C. J. Even M . B. J. Kemker Ms. N. C. Coovert M . C. Welch M . J. Gaslevic M . O. Lopez-Santiago M . G. Armstrong M . M. Webb M . T. Fredette M . C. Santos M . B. Davis M . J. Vasquez M . J. Eargle M . E. Davidson M . T. Fanelli M S. Rose Ms. K. McCurry M . J. Parent M B. Griman

U.S. Nuclear Regulatory Commission ND-21-0434 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani Mr. D. 0. Durham Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NU8, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GD8 Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-21-0434 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-21-0434 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of iTAAC 2.1.02.13a [index Number 063]

U.S. Nuclear Regulatory Commission ND-21-0434 Enclosure Page 2 of 3 ITAAC Statement Design Commitment 13.a) Controls exist in the MCR to trip the RCPs.

Inspections. Tests. Analyses Testing will be performed on the RCPs using controls in the MCR.

Acceptance Criteria Controls in the MCR operate to trip the RCPs.

ITAAC Determination Basis Testing was performed in accordance with the Unit 3 component test package work order (Reference 1)for Reactor Coolant Pump(RCP)trip testing to demonstrate controls in the Main Control Room (MCR)operate to trip the RCPs (i.e., RCS-MP-01A, RCS-MP-01B, RCS-MP-02A, RCS-MP-02B). Soft controls from the Plant Control System (PLS) were used to generate an RCP trip signal to the four RCP breakers controlled from PLS. The breaker for RCP 1A is ECS-ES-31, the breaker for RCP 1B is ECS-ES-41, the breaker for RCP 2A is ECS-ES-51, and the breaker for RCP 2B is ECS-ES-61. Local inspection verified the PLS trip signal caused the listed RCP breakers to open.

The Unit 3 component test results (Reference 1) were reviewed (Reference 2)and confirmed that controls in the MCR operate to trip the RCPs.

Reference 2 is available for NRC inspection as part of the Unit 3 ITAAC 2.1.02.13a Completion Package (Reference 3).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.1.02.13a (Reference 3)and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.1.02.13a was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

U.S. Nuclear Regulatory Commission ND-21-0434 Enclosure Page 3 of 3 References favailable for NRG inspection)

1. SNC922049 Revision 0,"Reactor Coolant Pump Trip Test-ITAAG: SV3-2.1.02.13a"
2. SV3-RCS-ITR-800063 Revision 0,"Unit 3: RCS Reactor Coolant Pumps Trip_Controls in MCR"
3. 2.1.02.13a-U3-CP-Rev0, ITAAC Completion Package