ND-21-0424, ITAAC Closure Notification on Completion of ITAAC Item 2.7.07.02 (Index Number 732)

From kanterella
(Redirected from ML21113A278)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC Item 2.7.07.02 (Index Number 732)
ML21113A278
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/23/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-21-0424
Download: ML21113A278 (7)


Text

Southern Nuclear Michael J. Yox Regulatory Affairs Director 7825 River Road Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 APR 2 3 2021 Docket No.: 52-025 ND-21-0424 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC Item 2.7.07.02 [Index Number 7321 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.7.07.02 [Index Number 732].

This ITAAC confirms certain Containment Recirculation Cooling system displays can be retrieved in the main control room. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) request NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli A. Roberts at 706-848-6991.

Respectfully submitted.

Michael J.

Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.7.07.02 [Index Number 732]

MJY/RAS/sfr

U.S. Nuclear Regulatory Commission ND-21-0424 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reouiatorv Commission Ms. M. Bailey (w/o enclosures)

Mr. M. King Ms. A. Veil M C. P. Patel M G. J. Khouri M C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gaslevic M . O. Lopez-Santiago M G. Armstrong M . M. Webb M . T. Fredette M . C. Santos M . B. Davis M . J. Vasquez M J. Eargle M E. Davidson M T. Fanelli M . S. Rose Ms. K. McCurry Qqiethoroe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

U.S. Nuclear Regulatory Commission ND-21-0424 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Orlani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. CorlettI Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-21-0424 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-21-0424 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.7.07.02[Index Number 732]

U.S. Nuclear Regulatory Commission ND-21-0424 Enclosure Page 2 of 4 ITAAC Statement Design Commitment

2. Displays of the parameters identified In Table 2.7.7-1 can be retrieved in the MCR.

Inspections. Tests. Analyses Inspection will be performed for retrievability of the parameters in the MCR.

Acceptance Criteria The displays identified in Table 2.7.7-1 are retrieved in the MCR.

ITAAC Determination Basis An inspection was performed to verify the retrievability of the Vogtle Electric Generating Plant (VEGP) Unit 3 plant parameters in the Main Control Room (MCR). The inspection for retrievability confirmed that the displays of the parameters identified in Combined License (COL) Appendix C Table 2.7.7-1 (Attachment A) can be retrieved in the MCR.

The inspection was performed in accordance with the Unit 3 component test package work order (Reference 1)for Containment Recirculation Cooling System (VCS)component indication verifications, and visually confirmed that when each of the displays of parameters identified in Attachment A was summoned at an MCR workstation, the summoned plant parameter appeared on a display monitor at that MCR workstation.

The Unit 3 component test results were reviewed (Reference 2) and confirmed that the VEGP Unit 3 plant parameter displays listed in Attachment A can be retrieved in the MCR.

Reference 2 is available for NRC inspection as part of the Unit 3 ITAAC 2.7.07.02 Completion Package (Reference 3).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.7.07.02 (Reference 3) and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.7.07.02 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

U.S. Nuclear Regulatory Commission ND-21-0424 Enclosure Page 3 of 4 References favailable for NRG Inspection^

1. SNC922123 Revision 0,"Containment Recirculation Cooling System Indication Verifications

- ITAAC: SV3-2.7.07.02"

2. SV3-VCS-ITR-800732 Revision 0,"Unit 3: VCS Parameters Displays in MCR"
3. 2.7.07.02-U3-CP-Rev0, ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-21-0424 Enclosure Page 4 of 4 Attachment A Excerpted from Combined License Appendix C Table 2.7.7-1 Equipment Name Tag No. Display Containment Temperature Channel VCS-061 Yes Containment Fan Cooler Fan VCS-MA-01A Yes(Run Status)

VCS-MA-01C Yes(Run Status)

VCS-MA-01B Yes(Run Status)

VCS-MA-01D Yes(Run Status)