ND-20-1267, ITAAC Closure Notification on Completion of ITAAC 2.3.04.02.i Findex Number 327)

From kanterella
(Redirected from ML21039A612)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC 2.3.04.02.i Findex Number 327)
ML21039A612
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/06/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-1267
Download: ML21039A612 (6)


Text

^ I l. I I MichaelJ. Yox 7825 River Road jOUtn0rn lNUCl03r Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tel Docket No.: 52-025 ND-20-1267 FEB 0 6 2021 10 cfr 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.3.04.02.i findex Number 3271 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria ITAAC item 2.3.04.02.i [Index Number 327]. This ITAAC verified that the as-built Fire Protection System (FPS) piping shown on Figure 2.3.4-2 is located on the Nuclear Island and meets the Unit 3 Combined License (COL) Appendix C acceptance criteria.

The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted, Michael J. Yox Regulatory Affairs Dire'ctor Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.3.04.02.1 [Index Number 327]

MJY/JFV/sfr

U.S. Nuclear Regulatory Commission ND-20-1267 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney(w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission Ms. M. Bailey (w/o enclosures)

M M. King M H. K. Nieh M C. P. Patel M G. J. Khouri M C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gaslevic M O. Lopez-Santiago M G. Armstrong M M. Webb M T. Fredette M C. Santos M B. Davis M J. Vasquez M J. Eargle M E. Davidson M T. Fanelli M S. Rose Ms. K. McCurry

U.S. Nuclear Regulatory Commission ND-20-1267 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-20-1267 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-1267 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.3.04.02.i [Index Number 327]

U.S. Nuclear Regulatory Commission ND-20-1267 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

2. The FPS piping shown on Figure 2.3.4-2 remains functional following a safe shutdown earthquake.

Inspections/Tests/Analvses i) Inspection will be performed to verify that the piping shown on Figure 2.3.4-2 is located on the Nuclear Island.

Acceptance Criteria i) The piping shown on Figure 2.3.4-2 is located on the Nuclear Island.

ITAAC Determination Basis Multiple ITAAC were performed to demonstrate that the Fire Protection System (FPS) piping shown on Figure 2.3.4-2 of the Combined License(COL) Appendix C remains functional following a safe shutdown earthquake. The subject ITAAC requires an inspection to verify that the piping shown on COL Appendix C, Figure 2.3.4-2 is located on the Nuclear Island, which is a seismic Category I structure.

To assure that the FPS piping shown on COL Appendix C, Figure 2.3.4-2 remains functional following a safe shutdown earthquake, all the pipelines and inline components/valves are designed to be located on the seismic Category I Nuclear Island. In accordance with procedure NCSP02-24(Reference 1), an inspection was conducted of the FPS to confirm the satisfactory installation of the piping system required to remain functional following a safe shutdown earthquake. The inspection included verification of the installed piping location (Building and Room).

The inspection results are documented in the Unit 3 Principal Closure Document(Reference 2) which confirmed that the piping shown on COL Appendix C, Figure 2.3.4-2 is located on the Nuclear Island and meets the ITAAC acceptance criteria.

Reference 2 is available for NRC inspection as well as the Unit 3 ITAAC Completion Package (Reference 3).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found that there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.3.04.02.1 (Reference 3)and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-20-1267 Enclosure Page 3 of 3 ITAAC Completion Statement Based on the above information, SMC hereby notifies the NRG that ITAAC 2.3.04.02.1 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met. Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References ^available for NRG inspection)

1. NCSP02-24, ITAAC Support Activities (AP1000).
2. SV3-FPS-ITR-800327, Rev. 0,"Unit 3 FPS Figure 2.3.4-2 Piping Location Inspection: ITAAC 2.3.04.02.1 NRC Index Number 327".
3. 2.3.04.02.i-U3-CP-Rev0, ITAAC Completion Package.
4. NEI 08-01,"Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"