ND-20-1404, ITAAC Closure Notification on Completion of ITAAC E.3.9.07.01.02 (Index Number 866)

From kanterella
(Redirected from ML21019A176)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC E.3.9.07.01.02 (Index Number 866)
ML21019A176
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 01/17/2021
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-1404
Download: ML21019A176 (6)


Text

Michael J. Yox 7825 River Road

^Southern Nuclear Regulatory Affairs Director Vogtle3&4 Waynesboro, GA 30830 706-848-6459 tel JAN 1 7 2021 Docket Nos.: 52-025 ND-20-1404 10CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC E.3.9.07.01.02 (Index Number 8661 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item E.3.9.07.01.02 [Index Number 866]. This ITAAC confirms the ability to warn and advise onsite individuals of an emergency, including non-essential personnel; visitors; contractor and construction personnel; and other personnel within the owner controlled area. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI)08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

//

Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC E.3.9.07.01.02 [Index Number 866]

MJY/RLB/sfr

U.S. Nuclear Regulatory Commission ND-20-1404 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc; Nuclear Requlatorv Commission Ms. M. Bailey (w/o enclosures)

M . M. King M H. K. Nieh M C. P. Patel M G. J. Khouri M C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M . J. Gaslevic M . O. Lopez-Santiago M . G. Armstrong M . M. Webb M . T. Fredette M . C. Santos M . B. Davis M . J. Vasquez M . J. Eargle M E. Davidson M T. Fanelli M S. Rose Ms. K. McCurry Qqiethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

U.S. Nuclear Regulatory Commission ND-20-1404 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. OrianI (w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-20-1404 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-1404 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC E.3.9.07.01.02[Index Number 866]

U.S. Nuclear Regulatory Commission ND-20-1404 Enclosure Page 2 of 3 ITAAC Statement Program Commitment 7.1 The means exists to warn and advise onsite individuals of an emergency, including those in areas controlled by the operator, including:

  • Employees not having emergency assignments
  • Visitors
  • Contractor and construction personnel
  • Other persons who may be in the public access areas, on or passing through the site, or within the owner controlled area

[J.I]

Inspections/Tests/Analvses 7.1 A test will be performed of the capabilities to warn and advise onsite individuals of an emergency, including nonessential personnel; visitors; contractor and construction personnel; and other personnel within the owner controlled area.

Acceptance Criteria 7.1.2 Demonstrate the ability to notify and advise onsite personnel including:

1. Non-essential personnel;
2. Visitors;
3. Contractor and construction personnel; and
4. Other personnel within the owner controlled area.

ITAAC Determination Basis A Vogtle Electric Generating Plant(VEGP) Unit 3 test of the capabilities to warn and advise onsite individuals of an emergency was performed to demonstrate the ability to notify and advise onsite personnel including non-essential personnel; visitors; contractor and construction personnel; and other personnel within the VEGP Unit 3 owner controlled area.

The Unit 3 test, in the form of an emergency plan drill scenario, was developed in accordance with procedure NMP-EP-303(Reference 1). The drill scenario was of sufficient severity to demonstrate the ability to notify and advise onsite personnel of an emergency through implementation of procedure NMP-EP-142(Reference 2), applicable sub-tier document(s) to NMP-EP-142, and VEGP Unit 3 & 4 Security Standing Order V-SSO-2020-03(Reference 3).

The evaluation of the Unit 3 drill performance was conducted per procedure NMP-EP-303. The drill performance (test) results are documented in SV3-ERO-ITR-800866 (Reference 4) per procedure NMP-EP-303. SV3-ERO-ITR-800866 documents and confirms the ability to notify and advise onsite personnel of an emergency, including non-essential personnel; visitors; contractor and construction personnel; and other personnel within the VEGP Unit 3 owner controlled area.

References 1 through 4 are available for NRC inspection as part of the Unit 3 E.3.9.07.01.02 ITAAC Completion Package (Reference 5).

U.S. Nuclear Regulatory Commission ND-20-1404 Enclosure Page 3 of 3 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC E.3.9.07.01.02 (Reference 5) and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC E.3.9.07.01.02 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References(available for NRC inspection)

1. NMP-EP-303, Drill and Exercise Standards, Version 21.0
2. NMP-EP-142, Emergency Notification, Version 5.0
3. Security Standing Order V-SSO-2020-03,11/03/2020
4. SV3-ERO-ITR-800866, Unit 3 ITAAC 866 On-Site Notification: \TAAC E.3.9.07.01.02, Revision 0
5. E.3.9.07.01.02-U3-CP-Rev0, ITAAC Completion Package