ND-20-1405, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.06 (Index Number 666)

From kanterella
(Redirected from ML20358A147)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC C.2.6.09.06 (Index Number 666)
ML20358A147
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/22/2020
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-1405
Download: ML20358A147 (6)


Text

,1 & I I Michael J. Yox 7825 River Road Sk. Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle3&4 706-848-6459 tel DEC 2 2 2020 Docket Nos.: 52-025 ND-20-1405 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.06 [Index Number 6661 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item C.2.6.09.06 [Index Number 666]. This ITAAC confirms that the access authorization system with numbered picture badges can identify and authorize protected area and vital area access only to those personnel with unescorted access authorization. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

-ftr (wW Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC C.2.6.09.06 [Index Number 666]

MJY/RLB/sfr

U.S. Nuclear Regulatory Commission ND-20-1405 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission Ms. M. Bailey (w/o enclosures)

M M. King M H. K. Nieh M C. P. Patel M G. J. Khouri M C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gaslevic M O. Lopez-Santiago M G. Armstrong M M. Webb M T. Fredette M C. Santos M B. Davis M J. Vasquez M J. Eargle M E. Davidson M T. Fanelli M S. Rose Ms. K. McCurry Oaiethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen

U.S. Nuclear Regulatory Commission ND-20-1405 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Orlani (w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Mr. M. M. CorlettI Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-20-1405 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-1405 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC C.2.6.09.06[Index Number 666]

U.S. Nuclear Regulatory Commission ND-20-1405 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

6. An access control system with numbered picture badges Is installed for use by individuals who are authorized access to protected areas and vital areas without escort.

Inspections/Tests/Analvses A test of the access control system with numbered picture badges will be performed.

Acceptance Criteria The access authorization system with numbered picture badges can identify and authorize protected area and vital area access only to those personnel with unescorted access authorization.

ITAAC Determination Basis A test of the access control system with numbered picture badges was performed to confirm that the system can identify and authorize protected area and vital area access only to those personnel with unescorted access authorization, and satisfy the applicable access control requirements of the Vogtle Electric Generating Plant(VEGP) Unit 3 and Unit 4 Physical Security Plan associated with 10 CFR Part 73.55(g)(6)(ii). The VEGP Unit 3 Plant Security System ITAACs only cover the Unit 3 plant security system design commitment scope.

A test of the access authorization system was performed using numbered picture test badges prepared both with and without unescorted access authorization to the protected area and vital areas. The test badges and associated biometric data were prepared and controlled per the applicable station procedures. Test badges and associated biometric data were used to attempt access to the protected area, and test badges were used to attempt access to a vital area. The test confirmed the access authorization system will only allow access to the protected area and vital area for which the test badges are authorized. Similarly, the test confirmed the access authorization system will not allow access for test badges that do not have authorization. The testing confirmed the test badge access successes and failures are recorded by the access authorization system. The testing also confirmed the Central and Secondary Alarm Stations received alarms following multiple unauthorized test badge access attempts and provided the protected or vital area test location causing the alarm. The test procedure included a record of protected and vital area test results, as well as confirmation that the access authorization system appropriately annunciated and accurately recorded test results.

The numbered picture badge access control system test results are documented in SV3-SES-ITR-800666 (Reference 1) and confirm that the access authorization system with numbered picture badges can identify and authorize protected area and vital area access only to those personnel with unescorted access authorization to these areas.

Reference 1 is available for NRC inspection as part of the Unit 3 C.2.6.09.06 ITAAC Completion Package (Reference 2).

U.S. Nuclear Regulatory Commission ND-20-1405 Enclosure Page 3 of 3 ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC C.2.6.09.06 (Reference 2) and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC C.2.6.09.06 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References(available for NRC inspection)

1. SV3-SES-ITR-800666, Unit 3 ITAAC 666 Access Authorization Test: ITAAC C.2.6.09.06, Revision 0
2. C.2.6.09.06-U3-CP-Rev0, ITAAC Completion Package