ITAAC Closure Notification on Completion of 2.3.14.04 (Index Number 480)
ML20321A298
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/13/2020
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-1318
Download: ML20321A298 (7)


Text

Southern Nuclear Michael J. Vox Regulatory Affairs Director 7825 River Road Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 NOV 1 3 2020 Docket No.: 52-025 ND-20-1318 10CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of 2.3.14.04 [Index Number 4801 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.14.04 [Index Number 480]. This ITAAC confirms that the display of Condensate Storage Tank water level can be retrieved in the main control room. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) request NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Vox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.3.14.04 [Index Number 480]

MJY/RAS/sfr

U.S. Nuclear Regulatory Commission ND-20-1318 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKlnney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Regulatory Commission Ms. M. Bailey (w/o enclosures)

Mr. M. King Mr. H. K. Nieh Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. O. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. S. Smith Mr. C. Santos Mrs. M. Bailey Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. E. Davidson Mr. T. Fanelli Mr. S. Rose Ms. K. McCurry

U.S. Nuclear Regulatory Commission ND-20-1318 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinohcuse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-20-1318 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-20-1318 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.3.14.04[Index Number 480]

U.S. Nuclear Regulatory Commission ND-20-1318 Enclosure Page 2 of 4 ITAAC Statement Design Commitment

4. Dispiays of the parameters identified in Tabie 2.3.14-1 can be retrieved in the MGR.

Inspections. Tests. Anaivses inspection wiii be performed for retrievabiiity of parameters in the MGR.

Acceptance Griteria The displays identified in Tabie 2.3.14-1 can be retrieved in the MGR.

ITAAC Determination Basis An inspection was performed to verify the retrievabiiity of the Vogtle Electric Generating Plant (VEGP) Unit 3 plant parameters in the Main Control Room (MCR). The inspection for retrievabiiity confirms that the displays of the parameters identified in COL Appendix C Table 2.3.14-1 (Attachment A)can be retrieved in the MCR.

The inspection was performed in accordance with the Unit 3 ITAAC Technical Report (Reference 1)for the Demineralized Water Transfer and Storage System (DWS)component indication verifications, and visually confirms that when each of the displays of parameters identified in Attachment A is summoned at an MCR workstation, the summoned plant parameter appears on a display monitor at that MCR workstation.

The Unit 3 ITAAC Technical Report(Reference 1) confirmed that the VEGP Unit 3 plant parameter displays listed in Attachment A can be retrieved in the MCR.

Reference 1 is available for NRC inspection as part of the Unit 3 ITAAC 2.3.14.04 Completion Package (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company(SNC) performed a review of findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.3.14.04-U3-CP-Rev0 (Reference 2)and is available for NRC review.

ITAAC Compietion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3.14.04 was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

U.S. Nuclear Regulatory Commission ND-20-1318 Enclosure Page 3 of 4 Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References(available for NRG inspection^

1. ITAAC Technical Report SV3-DWS-ITR-800480, Revision 0,"Unit 3 DWS Parameters Displays in MCR"
2. 2.3.14.04-U3-CP-Rev0, ITAAC Completion Package

U.S. Nuclear Regulatory Commission ND-20-1318 Enclosure Page 4 of 4 Attachment A Excerpt from COL Appendix C Table 2.3.14-1 Table 2.3.14-1 Equipment Name Tag No. Display Condensate Storage Tank Water Level DWS-006 Yes