NLS2020060, Emergency Plan Implementing Procedure. Includes Emergency Plan Implementing Procedure (EPIP) 5.7.1, Emergency Classification (Revision 66)
| ML20318A170 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 10/21/2020 |
| From: | Dewhirst L Nebraska Public Power District (NPPD) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 5.7.1, Rev 9, NLS2020060 | |
| Download: ML20318A170 (1) | |
Text
H Nebraska Public Power Disbict A!u.ia,l tMT'E whffl :,ou need w..s NLS2020060 October 21, 2020 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46
Dear Sir or Madam:
50.54(q) 72.44{f)
The purpose of this letter is to report a change to Emergency Plan Implementing Procedure (EPIP) 5.7.1, Emergency Classification (Revision 66), and provide a summary of the associated 10 CPR 50.54(q) analyses for the changes to the EPIP.
This letter contains no regulatory commitments. If you have any questions regarding this submi
, please contact me at ( 402) 825-5416.
ewhirst Regulatory Affairs and Compliance Manager
/bk
Attachment:
Report of Change and Summary of 50.54( q) Analyses Emergency Plan Implementing Procedure 5.7.1, Revision 66
Enclosure:
Emergency Plan Implementing Procedure 5. 7.1, Revision 66 cc:
Regional Administrator, w/attachment and enclosure (2)
USNRC - Region IV Director, Division of Fuel Management, w/attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/attachment ( enclosure per controlled distribution)
USNRC-CNS NPG Distribution, w/attachment and w/o enclosure CNS Records, w attachment and w/o enclosure COOPER NUO.EAR STATION PO Box 98 / BrownVTile, NE 68321-0098 Telephone: (4n2) 825-38n / Fax: (4n2) 825-5211 www nppd com