ND-20-0976, ITAAC Closure Notification on Completion of ITAAC 2.3.05.03c.ii (Index Number 350)

From kanterella
(Redirected from ML20266G280)
Jump to navigation Jump to search
ITAAC Closure Notification on Completion of ITAAC 2.3.05.03c.ii (Index Number 350)
ML20266G280
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 09/21/2020
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-0976
Download: ML20266G280 (6)


Text

Southern Nuclear Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesboro, GA 30830 Vogtie 3 & 4 706-848-6459 tei SEP 2 1 2020 Docket No.: 52-025 ND-20-0976 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtie Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.3.05.03c.ii (Index Number 3501 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtie Electric Generating Plant(VEGP)

Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.05.03c.ii [Index Number 350]. This ITAAC verified that the equipment hatch hoist holding mechanism was able to stop and hold the equipment hatch. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52", which is endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company(SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Director Vogtie 3 & 4

Enclosure:

Vogtie Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.3.05.03c.ii [Index Number 350]

MJY/TST/sfr

U.S. Nuclear Regulatory Commission ND-20-0976 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. M. J. Vox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. C. T. Defnall Mr. C. E. Morrow Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reoulatorv Commission M C. P. Patel M G. J. Khouri M N. D. Karlovich M A. Lerch M C. J. Even M B. J. Kemker Ms. N. C. Coovert M C. Welch M J. Gaslevic M V. Hall M G. Armstrong M M. Webb M T. Fredette M S. Smith M C. Santos M s. M. Bailey M S. Rose M B. Davis M . J. Vasquez M . J. Eargle Ms. K. Carrington Mr. M. King Mr. E. Davidson Mr. T. Fanelli

U.S. Nuclear Regulatory Commission ND-20-0976 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinohouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. CorlettI Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. J. E. Hosier, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, inc.

Mr. 8. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-20-0976 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-20-0976 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 2.3.05.03c.ii [Index Number 350]

U.S. Nuclear Regulatory Commission ND-20-0976 Enclosure Page 2 of 3 ITAAC Statement Design Commitment:

3.c) The equipment hatch hoist is single failure proof.

Inspections. Tests. Analyses:

ii) Testing of the equipment hatch hoist is performed.

Acceptance Criteria:

ii) The equipment hatch hoist holding mechanism shall stop and hold the hatch.

ITAAC Determination Basis Multiple ITAAC were performed to demonstrate the equipment hatch hoist is single failure proof.

For this ITAAC, a test was performed in accordance with Site Acceptance Test SV3-MH40-VTP-002 to demonstrate that the equipment hatch hoist holding mechanism stopped and held the hatch.

Testing was performed in accordance with Domestic AP1000 Hatch Hoist Site Acceptance Test (SAT) SV3-MH40-VTP-002(Reference 1) which required that the equipment hatch hoist holding mechanism stops and holds the hatch. The equipment hatch hoist was attached to the equipment hatch, along with additional test weights to achieve 100% of the hoist rated load, during the load test portion of the SAT. The hatch and weights were raised by the hoist higher than one foot, stopped, and verified to hold the hatch for at least one minute and not drift down after stopping.

The hatch and weights were lowered, stopped, and held again for at least two minutes and verified to hold the hatch and not drift down after stopping. The completed SAT is contained in the site record for Work Order SV3-MHS-T0W-1068326 (Reference 2). The completed SAT performance data was compared to the ITAAC Acceptance Criteria in ITAAC Technical Report SV3-MHS-ITR-800350 (Reference 3).

The completed SAT demonstrated that the equipment hatch hoist holding mechanism stopped and held the hatch. The ITAAC Technical Report (Reference 3) and ITAAC Completion Package (Reference 4) are available for NRC inspection.

ITAAC Finding Review In accordance with plant procedures for ITAAC completion. Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found that there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 2.3.05.03c.ii (Reference 4) and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3.05.03c.ii was performed for VEGP Unit 3 and that the prescribed acceptance criteria are met.

U.S. Nuclear Regulatory Commission ND-20-0976 Enclosure Page 3 of 3 Systems, structures, and components verified as part of tfiis ITAAC are being maintained in tfieir as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References(available for NRG inspection)

1. SV3-MH40-VTP-002, Rev. 2, Domestic AP1000 Hatch Hoist Site Acceptance Test
2. Work Order Package SV3-MHS-T0W-1068326,"Perform Site Acceptance Test SV3-MH40-VTP-402 for SV3-MHS-MH-05"
3. SV3-MHS-ITR-800350, Rev. 0,"Unit 3 Equipment Hatch Hoist Holding Mechanism Test:

ITAAC 2.3.05.03c.ii, NRC Index Number: 350"

4. 2.3.05.03c.ii-U3-CP-Rev0, ITAAC Completion Package
5. NEI 08-01 Rev. 5 corrected 6-30-2014, Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52