B16463, Application for Amend to License NPF-49,by Incorporating Proposed Revision Into TS Surveillances 4.5.2.f & 4.6.2.2.b, to Replace Pump Differential Pressure Acceptance Criteria W/Pump Acceptance Curve

From kanterella
(Redirected from ML20148E747)
Jump to navigation Jump to search
Application for Amend to License NPF-49,by Incorporating Proposed Revision Into TS Surveillances 4.5.2.f & 4.6.2.2.b, to Replace Pump Differential Pressure Acceptance Criteria W/Pump Acceptance Curve
ML20148E747
Person / Time
Site: Millstone 
Issue date: 05/30/1997
From: Brothers M
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148E752 List:
References
B16463, NUDOCS 9706030244
Download: ML20148E747 (7)


Text

-

4 Northeast

""P" F'"Y " d d """ "')' *"'"'"" C""3 p NuclearEnergy uaisione Nuaear Pown sianon l

Northeant Nudear Energy Cougiany f

2 P.O. Ilux 128 Waterford, CT 06333-0128 (860) 447-1741 Fax (860) 4+4 4277 The Northeast Utilides Sysicru MAY 3 0 1997 Docket No. 50-423 B16463 Re: 10CFR50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification Recirculation Sorav System Surveillances (PTSCR 3-24-97)

Pursuant to 10CFR50.90, Northoast Nuclear Energy Company (NNECO) hereby proposes to amend Operating License NPF-49 by incorporating the attached proposed l

revision into the Millstone Unit No. 3 Technical Specification Surveillances 4.5.2.f and 4.6.2.2.b.

Descriotion of Proposed Revision I

Technical Specification Surveillances 4.5.2.f and 4.6.2.2.b require the periodic flow testing of the Recirculation Spray System pumps. The proposed change to the surveillances will replace the pump differential pressure acceptance criteria with a j

pump acceptance curve.

Markuo of Proposed Revision A copy of the marked up Technical Specification page(s) is contained in Attachment 2.

j The markup reflects the currently issued version of the Technical Specifications.

Pending Technical Specification revisions or Technical Specification revisions issued subsequent to this submittal are not reflected in the enclosed markup.

jj Retvoe of Proposed Revision A copy of the retyped Technical Specification page(s) is contained in Attachment 3.

The retyped page(s) reflect (s) the currently issued version of the Technical Specifications. Pending Technical Specification revisions or Technical Specification revisions issued subsequent to this submittal are not reflected in the enclosed retype.

The enclosed retype should be checked for continuity with Technical Specifications prior to issuance.

9706030244 970530 lllllllllllllllllllllllllllhlll

'^

PDR ADOCK 0500o423 P

PM l.

U.S. Nucl=r Rc;;ul:to'y Commission B16463\\Page 2 Backaround. Safety Assessment. Sianificant Hazards Consideration and Environmental Considerations The Background, Safety Assessment, Significant Hazards Consideration and Environmental Considerations that support this proposed revision are contained in Attachments 4 and 5.

Plant Operations Review Committee and Nuclear Safety Assessment Board Review The Plant Operations Review Committee and the Nuclear Safety Assessment Board have reviewed this proposed amendment request and concur with the contained determinations.

State Notification in accordance with 10CFR50.91(b), we are providing the State of Connecticut with a copy of this proposed amendment to ensure their awareness of this request.

Schedule Reauest for NRC Acoroval NNECO requests NRC review and approval of this proposed revision by October 24, i

1997, and that the license amendment be effective upon issuance with implementation within sixty (60) days.

If the NRC Staff should have any questions or comments regarding this submittal, please contact Mr. D. Smith at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY dd}

M. H. Brothers N

Vice President - Millstone Unit No. 3 Subscribed and sworn to before me this 30 day of McLf 1997 hr w, $u o 0$t EA V

Date Commission expires t w CW a001 Summ LynneWl886 ems cc: See Pa9e 3 esmanession E4 pres Nov 30,2001 DOMA LYME WILLIANS fl0TARY PUBLIC STATE OF COMECTICUT

U.S. Nucl:ar Regulatory Commission B16463\\Page 3 i

cc-H. J. Miller, Region 1 Administrator 2

W. D. Travers, Ph. D., Director, Special Projects Offee J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3

)

Mr. Kevin T. A. McCarthy, Director Bureau of Air Management I

Monitoring and Radiation Division I

Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 i

5

)

I 2

i i

1 i

i i

j I

i

\\

I l

4 Docket No. 50-423 B16463 1

l i

i i

1 t

Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification Recirculation Sorav System Surveillances (PTSCR 3-24-97) i NNECO's Commitments t

i

,4 f

.i -

1 a

4 f

May 1997 I

e 4

4

,e

.~.-.

l

=

U.S. Nuclear R guintory Commission i

B16463/ Attachment 1\\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory l

commitments.

s 1

Commitment Committed Date or Outage i

NONE N/A 2

J i

3 4

\\

9 i

4 2

4 i

~.

Docket No. 50-423 B16463 r

l r

i Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification Recirculation Sorav System Surveillances (PTSCR 3-24-97)

Marked Uo Paae(s)

May 1997 4

U.S. Nucle r R:gulatory Commistion B16463\\ Attachment 2\\Page 1 MARKUP OF PROPOSED REVISION Refer to the attached markup of the proposed revision to the Technical Specifications.

The attached markup reflects the currently issued version of the Technical Specifications listed below. Pending Technical Specification revisions or Technical Specification revisions issued subsequent to this submittal are not reflected in the enclosed markup.

The following Technical Specification changes are included in the attached markup:

The pump differential pressure acceptance criteria is replaced with a pump acceptance curve.