NSD-NRC-97-5179, Forwards Rev 13 to GW-GL-021, AP600 Std SSAR (Vol 1-11). Rev Includes Changes in Response to NRC Staff Comments About Design for Post 72-h Actions

From kanterella
(Redirected from ML20140J179)
Jump to navigation Jump to search
Forwards Rev 13 to GW-GL-021, AP600 Std SSAR (Vol 1-11). Rev Includes Changes in Response to NRC Staff Comments About Design for Post 72-h Actions
ML20140J179
Person / Time
Site: 05200003
Issue date: 06/12/1997
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20140J184 List:
References
NSD-NRC-97-5179, NUDOCS 9706190245
Download: ML20140J179 (4)


Text

7

/

\\

t A

\\

)

..s s

e h/

Westinghouse Energy Systems Ba 355 Electric Corporation Pinsburgh Pennsylvanta 15230-0355 NSD-NRC-97-5179 DCP/NRC0912 Docket No.: STN-52-003 June 12,1997 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: T.R. QUAY

SUBJECT:

REVISION 13 OF THE SSAR Dear Mr. Quay Enclosed is Revicion 13 of the AP600 Standard Safety Analysis Report (SSAR). Also enclosed are the revised tables of contents, change page instructians, list of effective pages, doctment cover sbet, and a change roadmap outlining the changes in each section. The revision is in the form of replacement sections to be inserted into the SS AR binders to replace the superseded pages. The doci. ment control sheet should be inserted in the front of Volume 1; the original document cover sheets should not be discarded. Thirty-six copies of this update are being sent to Mrs. Diane Jackson for distribution to the NRC staff. As discussed with your staff, copies are being sent directly to ACRS Members and NRC subcontractors.

This revision includes changes in response to NRC staff comments about the design for post 72-hour actions. Changes to include information to support ITAAC parameters are also included. Many sections have changes in response to comments found during the staff review and preparation of the Final Safety Evaluation Report. Subsection 6.2.1 and Chapter 15 have been revised to reflect completion of the safety analyses.

When a limited amount ofinformation in a section is revised the changes may be provided as loose page amendments. Loose page amendments include only those portions affected by the change either due to the content or due to changes in pagination. Figures show the revision number in which the figure was last revised even if the page number changes.

This revision removes the remaining proprietary information. All information in Revision 13 of the AP600 SSAR is nonproprietary. Existing SSAR material marked as proprietary should be disposed ofin an appropriate manner.

Pm uant to 10 CFR 50.30(b), this revision is submitted under the enclosed oath or affirmation.

Please contact me on (412) 374-4334 if you have any questions concerning this transmittal.

_ _.) _ _

'f)0 s-~

s Advanced Plant Safety and Licensing lfhlhlllllfllllllfl ll j

Brian A.

iclntyre, anagW h_

.>v I

jml

]Oqpo

' [O }l.

"d Attachments Q{S Enclosures 7

^" 0527s3 pd4 9706190245 970612 d

l' a

NSD-NRC-97-5179

.DCP/NRC0912 June 12,1997 l

cc:

Kenneth C. Rogers, NRC Tom Kenyon, NRC (w/o enclosures)

Chuck Thompson, DOE M. Barger, DOE - Oakland, CA (w/o attachments and enclosures)

- Nicholas J. Liparuto, Westinghouse (w/o attachments and enclosures)

Diane Jackson, NRC (36 enclosures)

Ken Quitoriano, DOE l

i e

1 i

l l

i.

um.g

..y,

s UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of:

)

)

Westinghouse Electric Corporation

)

)

AP600 Standard Plant Design

)

Docket No.52-003

)

Final Design Approval and Design

_)

)

Certification application

)

APPLICATION FOR REVIEW OF "AP600 STANDARD SAFETY ANALYSIS REPORT" FOR FINAL DESIGN APPROVAL AND DESIGN CERTIFICATION Charles W. Pryor, Jr. being duly sworn, states that he is President of the Energy Systems Business Unit of Westinghouse Electric Corporation; that he is authorized on the part of said corporation to sign and file with the Nuclear Regulatory Commission this document; that all statements made and matters j

set forth therein are true and correct to the best of his knowledge, infori i

and belief.

WEST OUSE ELECT C CC RPORATION By:

A; la MMtY f

Charles W. Pryor, Jr.

[

Pmsident I

Energy Systems Business Unit i

4 Subscribed and sworn to before me this Lf2_ day j

of June 1997.

]G; y JanetA.Et mao,q q p g l

Monroeville Doro, Ailegneny 1

W caynission Expwes May22, i

h,Penn8Mna Assodagonof NotMes t

j otary Public.

1 i

1 l

i l

}

0630BAM,wPF

1 Il 1

1 i

1 l

Westinghouse Electric AP600 SSAR RevlSlan 13 May 30,1997 Return Receipt Name:

Title:

Document Control Desk Organizatlan:

Nuclear Regulatory Commission i

Address:

One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Control copy number:

4 Revision 13 of the AP600 SSAR received Signature cate PLEASE SIGN AND RETURN T0: Westinghouse Elactric Corporation P.O. Box 355 Mall Stop 3 09 East Pittsburgh, PA 15230 ATTENTION: Brian A. McIntyre J