NSD-NRC-97-5107, Forward Rev 12 to GW-GL-021, AP600 SSAR (Vols 1-11). Revised Tables of Contents,Change Page Instructions,List of Effective Pages,Document Cover Sheet & Change Roadmap Outlining Changes in Section Also Encl
| ML20140G390 | |
| Person / Time | |
|---|---|
| Site: | 05200003 |
| Issue date: | 05/06/1997 |
| From: | Mcintyre B WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | Quay T NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20140G394 | List: |
| References | |
| NSD-NRC-97-5107, NUDOCS 9705090097 | |
| Download: ML20140G390 (9) | |
Text
7
=,
l
\\
J
(
=
L/
Westinghouse Energy Systems Ba 355 Electric Corporation Pittsbutgh Pennsylvania 15230-0355 NSD-NRC-97-5107 DCP/NRC0846 Docket No.: STN-52-003 May 6,1997 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 A'ITENTION:
T. R. QUAY SUI 1]ECT:
REVISION 12 OF Tile SSAR
Dear Mr. Quay:
Enclosed is Revision 12 of the AP600 Standard Safety Analysis Report (SSAR). Also enclosed are the revised tables of contents, change page instructions, list of effective pages, document cover sheet, l
and a change roadmap outlining the changes in each section. The revision is in the form of replacement sections to be inserted into the SSAR binders to replace the superseded pages. The
_U document control sheet should be inserted in the front of Volume 1; the original document cover sheets should not be discarded. Thirty-six copies of this update are being sent to Mrs. Diane Jackson for distribution to the NRC staff. As discussed with your staff, copies are being sent directly to ACRS Members and NRC subcontractors.
The changes included in this revision are the result of changes to the SSAR to address NRC stafT comments or the result of design changes to address staff comments and concerns. Most of the changes have been provided previously as draft SSAR markups in responses to staff questions and i
open items. Also additional SSAR changes required for the changes for post 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> actions are included in this revision.
When a limited amount of information in a section is revised the changes may be provided as loose page amendments. Loose page amendments include only those portions affected by the change either due to the content or due to changes in pagination. If a front or back page of a sheet is unaffected by 1
the change the page from the previous revision is printed. Figures show the revision number in which the figure was last revised even if the page number changes.
This revision includes no information classified. proprietary.
Please contact I3rian A. McIntyre on (412) 374-4334 if you have any questions concerning this
, transmittal.
Sk Brian. Mc ntyr, Man ger Advanced Plant Safety and Licensing 9705090097 970506
~~
A /) p a, /
PDR ADOCK 05200003
.r.
I E
"0R Attachments D ' V ' ' V 'l.
Enclosures
)
3i111111tIi1011111111111ac vae
\\
r n
5 NSD-NRC-97-5107 DCP/NRC0846 May 6,1997 cc:
Kenneth C. Rogers,'NRC Tom Kenyon, NRC (w/o enclosures)
Chuck Thompson, DOE
. M. Darger, DOE - Oakland, CA (w/o attachments and enclosures)
Nicholas J. Liparuto, Westinghouse (w/o attachments and enclosures)
Diane Jackson, NRC (36 enclosures) i i
.t+
t
.{
i I
t g-1
.L 4
3175A 6
0 9
Change Page Instructions for SSAR Revision 12 Enclosed you will find information to replace your current version of the AP600 SSAR.
PACKAGE 1 OF 5 Remove Present Pages:
Replace with the Enclosed Pages:
Volume 1 (only)
Master Table of Contents, i through xxxii Master Table of Contents, i through xxxiii List of Effective Pages, I through 36 List of Effective Pages, I through 38 Change Roadmap, R-1 through R-25 Change Roadmap, R-1 through R-24 Volumes 2 through 11 Master Table of Contents, i through xxxii Master Table of Contents, i through Chapters 1 through 18 Tables of Contents Chapters 1 through 18 Tables of Contents Volume 1 1.2-3 through 1.2-8 (these page.s have not been revised replace only ifpages were removed during the Rev 11 changes)
\\
PACKAGE 2 OF 5 Remove Present Pages:
Replace with the Enclosed Pages:
Volume i 1.2-35 1.2-35 1.8-5, -6, -11 and 1.8-12 1.8-5, -6, -11 and 1.8-12 1 A-57 through I A-60, I A-65 through I A 72 1 A-57 through I A-60, I A-65 through 1 A-72 Volume 2 2-1 through 2-18 2-1 through 2-24
' 2A 91 Nothing 3 2-9,-10. 21 through 3.2-82 3.2-9,-10,-21 through 3.2-82 3.6-33 through 3.6-38 3.6-33 through 3.6-38 Volume 3 3.7-1 through -52 61 through -66, 3.7-1 through -51. -51 A, -518. -52,
-73 through 85 through -90
-61 through -66, -73 through -78,
-101, 102,-105,-106,-109,-110.-l15.-116
-85 through -90,-101, -102, -105 -106, -109,
-181,-183,-189, -191, -193,-195.-229.-230,
-110,-115,-116,-181,-183,-189,-191,
-231 and 3.7-232
-193,-195,-229 -230, -231,-233.-235, 237,
-239,-241,-243,-245,-247,-249,-251 and 3.7-252 3.8-19 through 3.8-64, -117. 118, and 3.8-157 3.8-19 through -64, -64A, -64B, -117, -118, 3.8-157, and 3.7-157A 3.9-35 through 3.9-104, I19, -120, 129, and -130 3.9-35 through -104. -119. -120, -129 and -130 t.L, r, /.or.rr, 4 Jidt h /1-- 4,/J0. /M fy / a/J J
O e
Change Page Instructions for SSAR Revision 11 (Cont)
PACKAGE 2 OF 5 (CONT.)
Remove Present Pages:
Replace with the Enclosed Pages:
Volume 4 3.10-5 through 3.10-8 3.10-5 through 3.10-8 3.11-1 through 3.11-12, -37 and 3.11-38 3.11-1 through 3.11-12, -37 and 3.11-38 3A-1 and 3A-2 3A-1 and 3A 2 3B-11 through 3B-22 3B-11 through 3B-22 3D-1, -2, -7, -8, -15 through 3D-42 3D-1, -2, -7, -8, -15 through 3D-42,.
3E-3, -5, -7, -9, -11. -13, -i 5, -17, and 3E-19 3E-3, -5, -7, -9, -11. 15, -17, and 3E-19 3F-1, 3F-2 and.3F-3 3F-1, 3F-2 and 3F-3 PACKAGE 3'OF 5 Remove Present Pages:
Replace with the Enclosed Pages:
Volume 4 5.1-23 5.1-23 5.2-23 through 5.2-26 5.2-23 through 5.2-26 Volume 5 5.4-47 through 5.4-97 5.4-47 through 5.4-100 and 5.4-103 6.2-33 through 6.2-37A, -55, -56, -l87, 6.2-33 through 6.2-37A, -55, -56, -187,
-233 and 6.2-234
-233 and 6.2-234 6.3 7 through 6.3-48 6.3-7 through 6.3-48 7.1-1 through 7.1 50,-53 -54,-59, 7.1-1 through 7.1 50, 53.-54,-59,-60 (and 7.1-60 ifit was not discarded during and 7.1-61 Revision i1 change) 7.2-25, 37. -41, -49, -51, -55, and 7.2-57 7.2-25, -27, 41, -49, -51, -55, and 7.2-57 7.3-1 through 7.3 36 7.3-1 through 7.3-39 Cheare fm farmsme kr 55a1lav 11-4wn!30.1991 fm 1of 5 i
Change Page Instructions for SSAR Revision 11 (Cont) 1 PACKAGE 3 OF 5 (CONT.)
Remove Present Pages:
Replace with the Enclosed Pages:
Volume 6 7.7-1 through 7.7-22 7.7-1 through 7.7-22 8.3-7,-8,-21,-22, -23, 8.3 24 8.3 7,-8,-21,-22,-23, 8.3-24 9.1-5, -6, -7, -8, -39, -40, -41, and 9.1-42 9.1-5, -6, -7, -8, -39, -40, -41, and 9.1-42 9.2-5 through 9.2-48. -61. -65, -67. -69 and 92.-77 9.2-5 through 9.2-48,-61.-65,-67 -69 and 92.-77 9.3-1, -2, -65, -67, and 9.3-69 9.3-1, -2, -65, -6'7, and 9.3-69 THE CHANGE FOR THE FOLLOWING SECTION SHOULD BE DONE IN CONJUNCTION WITH PACKAGE 4 - 9.4 FICURES' 9.41 through 9.4-84 9.4-1 through 9.4-84 Add new 8% x 11 sheets: 9.4-103,-104, 109,
-110, -111, -112, -115 and 9.4-116 - All of these can be inserted in front of present Ilxl7 figure page 9.4-103 (See Package 4 [ figure pockets} instructions to complete this section)
Volume 7 9.5-27 through 9.5-30, -67, -69, 71, -73 and 9.5-77 9.5-27 through 9.5-30,-67 -69,-71,-73 and 9.5 77 9A-143 and 9A-147 9A-143 and 9A-147 10.3-41 10.3-41 10.4-65, -67, -69, -71, -75, and 10.4-77 10.4-65, -67, -69, -71, -75, and 10.4-77 i
Volume 8 11.1-3, -4, -7, and 11.1-8 11.1-3, -4, -7, and 11.1-8 11.2-43, 45 -47. -49, -51, -53, and 11.2-55 11.2-43,-44 -45,-47 -49, 51.-53, and 11.2-55 11.3-17, -18,' -19 and i 1.3-20 11.3-17, -l8, 19 and 11.3-20 11.4-3 through 11.4-6 11.4-3 through 11.4-6 11.51 through 11.5-29 11.5-1 through 11.5-30 12.3-5 through 12.3-24,-33,-43,-45,-75 12.3-5 through 12.3-24,-33.-43,-45,-75
-77, 105, and 12.3-107
-77, -95, -105, and 12.3-107 12.4-1 through 12.4-18 12.4-1 through 12.4-19 Gay, S,, /msrunon tw JLIE & /1 4=/J0. /M7 bye 1o/J j
r Change Page Instructions for SSAR Revision 11 (Cont)
PACKAGE 3 OF 5 (CONT.)
Remove Present Pages:
Replace with the Enclosed Pages:
Volume 9 15.2-17 and 15.2-18 15.2-17 and 15.2-18 16.2-23 and 16.2-24 16.2-23 and 16.2-24 PACKAGE 4 OF 5 Remove Present Pages:
Replace with the Enclosed Pages:
Volume 4 5.1-19 and 5.1-21 Drawing pockets - 5.1-19 and 5.1-21 Volume 5 5.4-99 Drawing pocket - 5.4-101 6.2-231 and 6.2-245 Drawing pockets - 6.2-231 and 6.2-245 6.3-73 and 6.3-75 Drawing pockets - 6.3-73 and 6.3-75 6.4-15 Drawing pocket - 6.4-15 Volume 6 8.3-53, 8.3-55, 8.3-57, and 8-3-59 Drawing pockets - 8.3-53, 8.3-55, 8.3-57 and 8.3-59 9.1-59 and 9.1-6i Drawing pockets - 9.1-59 and 9.1-61 9.2-57, 9.2-63, 9.2-73, and 9.2-75 Drawing pockets - 9.2-57, 9.2-63, 9.2-73 and 9.:
9.3-73 and 9.3-75 Drawing pockets - 9.3-73 and 9.3-75 THE CHANGE FOR THE FOLLOWING SECTION SHOULD BE DONE IN CONJUNCTION WITH PACKAGE 3 - 9.4 TEXT & FIGURES 9.4-93, 9.4-95, 9.4-97, 9.4-99, 9.4-101 -
Drawing pockets - 9.4-93, 9.4-95, 9.4-97, Remove the present 11x17s figures only:
9.4-99, 9.4-101, 9.4-105, 9.4-107, 9.4-113, 9.4-103, 9.4-105, 9.4-107, 9.4-109, 9.4-111, 9.4 117, 9.4-119, 9.4-121, 9.4-123, 9.4-113, 9.4-115 and 9.4-117 and 9.4-125 Note: These drawings pockets should be collated with the 8 x1i figures insertedfrom Package 3 Volume 7 9.5-73 Drawing pocket - 9.5-73 10.3-37 and 10.3-39 Drawing pocket - 10.3-37 and 10.3-39 10.4-73 Drawing pocket - 10.4-73 Volume 8 11.3 21 Drawing pocket - 11.3-21 Gov fg lutrwren hw 5501fer 11-Awol 30. /W1 bre 4 of 5
Change Page Instructions for SSAR Revision 11 (Cont)
PACKAGE 5 OF 5
.l Remove Present Pages:
Replace with the Enclosed Pages:
Volume 9 15.6-23 through 15.6-40,-63 through -65, 15.6-23 through 15.6-40.-63 through -65,
-77 through -82, -111 and 15.6-112
-77 through -82, -111 -111(0) through
-111(73) and -112
)
Gears fg lannamaar far SSM In 12 - 4rJ10. /W fm 3 of 5 j
c7 x.
~.
,w
.s
.w a.--u.s
..a,_
-am..s,u.u.w.
an..,
AP604) DOCUMENT COVER SHEET TDC:
IDS: I S
Fprm 68202G(5/94)
AP600 CENTRAL FILE USE ONLY:
e C058.FRM RFS#;
RFS ITEM #:
AP600 DOCUMENT NO.
REVISION NO.
ASSIGNED TO Control Copy #
j j
GW-GL-021 12 Page 1 of 2 Document Control Desk 4
l ALTERNATE DOCUMENT NUMBER:
WORK BREAKDOWN #: 3.2.3 I
DESIGN AGENT ORGANIZATION: Westinghouse Electric Corporation TITLE: AP600 Standard Safety Analysis Report (Volume 1 11) 4 ATTACHMENTS:
DCP #/REV. INCORPORATED IN THIS DOCUMENT REVISION:
4 I
CALCULATION / ANALYSIS REFERENCE-I ELECTRONIC FILENAME ELECTRONIC FILE FORMAT ELECTRONIC FILE DESCRIPTION Wordperfect 5.1 Text and figures
+
(C) WESTINGHOUSE ELECTRIC CORPORATION 1997 0 WESTINGHOUSE PROPRIETARY CLASS 2 This document contains information proprietary to Westinghouse Electric Corporation; it is submitted in confidence and is to be used solely for the purpose for which it is fumished and retumed upon request, This document and such information is not to be reproduced, transmitted, disclosed l
or used otherwise in whole or in part without pnor wntten authorization of Westinghouse Electric Corporation, Energy Systems Business Unit, subject to the legends contained hereof.
0 WESTINGHOUSE PROPRIETARY CLASS 2C This document is the property of and contains Proprietary information owned by Westinghouse Electnc Corporation and/or its subcontractors and i
suppliers. It is transmitt'ed to you in confidence and trust, and you agree to treat this document in strict accordance with the terms and conditions of the agreement under wtuch it was provided to you.
@ WESTINGHOUSE CLASS 3 (NON PROPRIETARY)
COMPLETE 1 IF WORK PERFORMED UNDER ' DESIGN CERTIFICATION QB COMPLETE 2 IF WORK PERFORMED UNDER FOAKE.
1 @ DOE DESIGN CERTIFICATION' PROGRAM GOVERNMENT LIMITED RIGHTS STATEMENT [See page 21 Copynght statement: A license is reserved to the U.S. Govemment under contract DE AC03 90SF18495.
@ DOE CONTRACT DELIVERABLES (DELIVERED DATA)
Subject to specified exceptions, disclosure of this data is restricted until September 30,1995 or Design Certification under DOE contract DE.ACO3-90SF18495, whichever is later.
EPRI CONFIDENTIAL: NOTICE: 1 U 2 3
4 5
CATEGORY: A 0 BO C D
E F
2 O ARC FOAKE PROGRAM ARC LIMITED RIGHTS STATEMENT [See page 2)
Copynght statement: A license is reserved to the U.S. Govemment under contract DE-FCO2-NE34267 and subcontract ARC-93 3 SC-001.
O ARC CONTRACT DELIVERABLES (CONTRACT DATA)
Subject to specified exceptions, disclosure of this data is restricted under ARJ Subcontract ARC-93 3-SC-001.
ORIGINATOR SIGNAT DATE Donald A. Lindgren
/
APPROVAL DATE AP600 RESPONSIBLE MANAGER Si NATU{*
Brian A. McIntyre M
[fg gj %
gf7
" Approval of the responsible manager signifies that document is compide, all required reviews are complete, electtp6c file is atta'ched and document is rilaised for use.
1
e AP600 DOCUMENT COVER SHEET Pag > 2 Form 58202O($l94)
LIMITED RIGHTS STATEMENTS DOE GOVERNMENT LIMITED RIGHTS STATEMENT (A)
These data are submitted with limited rights under government contract No. DE.AC03-90SF18495. These data may be reproduced and used by the govemment with the express limitation that they will not, without wntten permission of the contractor, be used for purposes of manufacturer nor disclosed outside the government; except that the government may disclose these data outside the government for the following purpostis, if any, provided that the government makes such disclosure subject to prohibition against further use and disclosure:
(l)
This ' Proprietary Data
- may be disclosed for evaluation purposes under the restrictions above.
(II) The 'Propnetary Data
- may be disclosed to the Electric Power Research Institute (EPRI), electnc utility representatives and their direct consultants, excluding direct conimercial competitors, and the DOE National Laboratories under the prohibitions and restnctions above.
(B)
This notice shall be marked on any reproduction of these data, in whole or in part.
ARC LIMITED RIGHTS STATEMENT:
This propnetary data, fumished under Subcontract Number ARC-9;., SC-001 with ARC may be duplicated and used by the govemment and ARC, subject to the limitatipns of Article H-17.F. of that subcontract, with the express limitations that the propnetary data may not be disclosed outside the govemment or ARC, or ARC's Class 1 & 3 members or EPRI or be used for purposes of manufacture without pnor permission of the Subcontractor, except that further disclosure or use may be made solely for the following purposes:
This propnetary data may be disclosed to other than commercial competitors of Subcontractor for evaluation purposes of this subcontract under the restnction that the proprietary data be retained in confidence and not be further disclosed, and subject to the terms of a non-disclosure agreement between the Subcontractor and that organization, excluding DOE and itt contractors.
DEFINITIONS CONTRACT / DELIVERED DATA - Consists of documents (e.o_ spccificMonn ti - ings, reports) which are generated under the DOE or ARC contracts which contain no baclground proprietag ca;a, EPRI CONFIDENTIALITY / OBLIGATION NOTICES NOTICE 1: The data in this document is subject to no confidentiality obligations.
NOTICE 2: The data in this document is propnetary and confidential to Westinghouse Electnc Corporation and/or sts Contractors. It is forwarded to recipient under an obligation of Confidence and Trust for limited purposes only. Any use, disclosure to unauthorized persons, or copying of this document or parts thereof is prohibited except as agreed to in advance by the Electnc Power Research institute (EPRI) and Westingnouse Electnc Corporation. Recipient of this data has a duty to inquire of EPRI and/or Westinghouse as to the uses of the information contained herein that are permitted.
NOTICE 3: The data in this document is proprietary and confidential to Westinghouse Electric Corporation and/or its Contractors. It is forwarded to recipient under an obligation of Confidence and Trust for use only in evaluation tasks specifically authonzed by the Electnc Power Research institute (EPRI). Any use, disclosure to unauthorized persons, or copying this document or pans thereof is prohibited except as agreed to in advance by EPRI and Westinghouse Electnc Corporation. Recipient of this data has a duty to inquire of EPRI and/or Westinghouse as to the uses of the information contained herein that are permitted. This document and any copies or excerpts thereof that may have been generated are to be retumed to Westinghouse, directly or through EPRI, when requested to do so.
NOTICE 4: The data in this document is propnetary and confidential to We'stinghouse Electric Corporation and/or its Contractors. It is being revealed in confedance and trust only to Employees of EPRI and to certain contractors of EPRI for limited evaluation tasks authorized by EPRI.
Any use, disclosure to unauthonzed persons, or copying.of this document or parts thereof is prohibited. This Document and any copies or excerpts thereof that may have been generated are to be retumed to Westinghouse, directly of through EPRI, when requested to do so.
NOTICE 5: The data in this document is proprietary and confidential to Westinghouse Electnc Corporation ana/or its Contractors. Access to this data is given in Confidence and Trust only at Westinghouse facilities for limited evaluation tasks assigned by EPRI. Any use. disclosure to unauthonzed persons, or copying of this document or parts thereof is prohibited. Neither this document nor any excerpts therefrom are to be removed from Westinghouse facilities.
EPRI CONFIDENTIALITY / OBLIGATION CATEGORIES CATEGORY "A" - (See Delivered Data) Consists of CONTRACTOR Foreground Data that is contained in an issued reported.
CATEGORY "B" - (See Delivered Data) Consists of CONTRACTOR Foreground Data that is not contained in an issued report, except for computer programs.
CATEGORY "C" - Consists of CONTRACTOR Background Data except for computer programs.
CATEGORY *D" - Consists of computer programs developed in the course of performing the Work.
CATEGORY "E" - Consats of computer programs developed pnor to the Effective Date or after the Effective Date but outside the scope of the Work.
CATEGORY "F" - Consists of administrative plans and administrative reports.
~
AP600 DOCUMENT COVER SHEET Pag 9 2 Form 58202G(5/94)
LIMITED RIGHTS STATEMENTS DOE GOVERNMENT L:MITED RIGHTS STATEMENT (A)
These data are submitted with hmited rights under government contract No. DE-AC03-90SF18495. These data may be reproduced and used by the govemment with the express limitation that they will not, without written permission of the contractor, be used for purposes of manufacturer nor disclosed outside the govemment; except that the govemment may disclose these data outside the government for the following purposes, if any, provided that the government makes such disclosure subject to prohibition against further use and disclosure:
(I)
This *Propnetary Data' may be disclosed for evaluation purposes under the restrictions above.
i (11) The 'Propnetary Data
- may be disclosed to the Electnc Power Research Institute (EPRI), electnc utility representatives and their direct consultants, excluding direct commercial competitors, and the DOE National Laboratories under the prohibitions and restnctions above.
1.
(B)
This notice shall be marked on any reproduction of these data, in whole or in part.
ARC LIMITED RIGHTS STATEMENT:
This propnetary data, furnished under Subcontract Number ARC-93 3-SC-001 with ARC may be duplicated and used by the government and ARC. subject to the limitatipns of Article H-17.F. of that subcontract, with the express limitations that the propnetary data may not be disclosed outside the government or ARC, or ARC's Class 1 & 3 members or EPRI or be used for purposes of manufacture without pnor permission of the Subcontractor, except that further disclosure or use may be made solely for the followir'g purposes:
This propnetary data may be disclosed to other than commercial competitors of Subcontractor for evaluation purposes of this subcontract under the restnction that the propnetary data be retained in confidence and not be further disclosed, and subject to the terms of a non-disclosure agreement between the Stibcontractor and that organization, excluding DOE and its contractors.
DEFINITIONS CONTRACT / DELIVERED DATA - Consists of documents (e.g. specifications, drawings, reports) which are generated under the DOE or ARC contracts which contain no background proprietary data.
EPRI CONFID'ENTIALITY / OBLIGATION NnTlCES NOTICE 1: The data in this document is subject to no confidentiality obligations.
NOTICE 2: The data in this document is propnetary and confidential to Westinghouse Electnc Corporation and/or its Contractors. It is forwarded to recipient under an obligation of Confidence and Trust for hmited purposes only. Any use, disclosure to unauthonzed persons, or copying of this document or parts thereof is prohibited except as agreed to in advance by the Electne Power Research Institute (EPRI) and Westinghouse Electnc Corporation. Recipient of this data has a duty to inquire of EPRI and/or Westinghouse as to the uses of the information contained herein that are permitted.
NOTICE 3: The data in this document is propnetary and confidential to Westinghouse Electric Corporation and/orits Contractors. It is forwarded to recipient under an obligation of Confidence and Trust for use only in evaluation tasks specifically authonzed by the Electnc Power Research Institute (EPRI). Any use, disclosure to unauthonzed persons, or copying this document or parts thereof is prohibited except as agreed to in advance by EPRI and Westinghouse Electnc Corporation. Recipient of this data has a duty to inquire of EPRI and/or Westinghouse as to the uses of the information coritained herein that are permitted. This document and any copies or excerpts thereof that may have been generated are to be retumed to Westinghouse, directly or through EPRI, when requested to do so.
NOTICE 4: The data in this document is proprietary and confidential to Westinghouse Electnc Corporation and/or its Contractors. It is being revealed in confidence and trust only to Employees of EPRI and to certain contractors of EPRI for hmited evaluation tasks authenzed by EPRI.
Any use, disclosure to unauthonzed persons, or copying.of this document or parts thereof is prohibited. This Document and any copies or excerpts thereof that may have been generated are to be retumed to Westinghouse, directly or through EPRI, when requested to do so.
l NOTICE 5: The data in this document is proprietary and confidential to Westinghouse Electne Corporation ancor its Contractors. Access to this data is given in Confidence and Trust only at Westinghouse facilities for limited evaluation tasks assigned by EPRI. Any use, disclosure to unauthonzed persons, or copying of this document or parts thereof is prohibited. Neither this document nor any excerpts therefrom are to bs removed from Westinghouse facilities.
EPRI CONFIDENTIALITY / OBLIGATION CATEGORIES CATEGORY
- A* - (See Delivered Data) Consists of CONTRACTOR Foreground Data that is contained in an issued reported.
CATEGORY *B' -(See Delivered Data) Consists of CONTRACTOR Foreground Data that is not contained in an issusd report, except for computer programs.
CATEGORY *C"- Conrists of CONTRACTOR Background Data except for computer programs.
CATEGORY *D* - Con 1:sts of computer programs developed in the course of performing the Work.
I CATEGORY *E' - Cons sts of computer programs developed pnor to the Effective Date or after the Effective Date but outside the scope of tha Work.
CATEGORY *F* - Consivs of administrative plans and administrative reports.
)