05000354/LER-1997-005, Forwards LER 97-005-00 Entitled, Operation in TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Rhrs Crosstie Valves. Commitments Attached

From kanterella
(Redirected from ML20140F495)
Jump to navigation Jump to search
Forwards LER 97-005-00 Entitled, Operation in TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Rhrs Crosstie Valves. Commitments Attached
ML20140F495
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/25/1997
From: Bezilla M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20140F500 List:
References
LR-N970270, NUDOCS 9705050025
Download: ML20140F495 (2)


LER-2097-005, Forwards LER 97-005-00 Entitled, Operation in TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Rhrs Crosstie Valves. Commitments Attached
Event date:
Report date:
3542097005R00 - NRC Website

text

'

l

'O PSEG Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit APR 2 51997 LR-N970270 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 UNIT NO. 1 LICENSEE EVENT REPORT NO. 97-005-00 ,

Dear Sir:

This Licensee Event Report entitled " Operation in a TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Residual Heat Removal System Crosstie Valves" is being submitted pursuant to the requirements of 10CFR50.73 (a) (2) (i) (B) . ,

Sincerely,

.]?t{/$ y Mark Bezill'a General Manager, Hope Creek Operations

/

JWK/kjb j j j'1 l SORC Mtg.97-022, 97-023 o-C Distribution l LER File i

9705050025 970425 PDR ADOCK 05000354 11 1 li Ulll 11 S PDR i khih1 l l

,ilil!{

l Tlie }uverisin yourlunds. - - ' ' '

95 2468 mv seu I

. - . . .. . - - - - . _ - - . - - . . ~ . . ... . . ~ . - ..=.- .

j Document Control Desk APR 2 51997  ;

j LR-N970270 l

Attachment A The following items represent the commitments that the j

Public Service' Electric and Gas Company.is making to the Nuclear Regulatory Commission relative to LER 354/97-005-00:

i

1. A separate evaluation of 10CFR50.59 and Engineering .

performance issues has been initiated. The evaluation  !

l will be' completed by May 22, 1997. l l 2. A review of other ECCS related design bases will be l performed as part of Attachment 2 to the February 11, l 1997, Hope Creek response pursuant to 10CFR50.54 (f) .

This review will detect deficiencies between plant configuration and design bases caused by design changes as well as other sources. ,

I l

3. The safety evaluations for the crosstie modifications will be re-performed to validate the conclusions. This action will be completed by May 16, 1997, i

l

.l I

I i

4 i

i i .