Responds to NRC Re Violations Noted in Insp Rept 50-298/85-30.Corrective Actions:Site Tour Surveillances Conducted by QA Staff Since 850701 Reviewed & Discrepancies Noted in Future Surveillances Will Be Reported
ML20140E257
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/23/1985
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20140E238 List:
References
NLS8500349, NUDOCS 8602030213
Download: ML20140E257 (2)


Text

O o.

a.

GENERAL OFFICE Nebraska Public Power District

" "7EsY! Mss"<"!M^ """

= = = = -

= = _ -. - _ - - _ - - -.

- = = = = = _ = - = = =

NLS8500349 December 23, 1985 0

I!

!; il

~'

{ {,i DEC 3 01985 a

j Mr..I.

E. Gaglinrdo, Chief

{.

Reactor Projects Branch U.S. Nuclear Regulatory Commission Region IV Gil Ryan Plaza Drive Suite 1000 Arlington, TX 76011

Dear Mr. Gagliardo:

Subject :

Nebraska Public Power District Response to IE Inspection Report No. 50-298/85-30 This letter is written in response to your letter dated November 27,

1985, transmitting Inspection Report No. 50-298/85-30 Therein you indicated that one of our activities was in violation of Nuclear Regulatory Commission requirements.

The following is the statement of violation and our response to each in accordance with 10CFR2.201:

STATEMENT OF VIOLATION 10 CFR Part 50, Appendix D, Criterion V and the licensee's approved quality assurance program require that netivities offecting quality be performed in necordance with npproved procedures, instructions, or drawings.

Quality Assurance Instruction, General Guidelines - Quality Assurance Surveillance," QAl-4, Revision 13, dated August 30, 1985, paragraph 4.0 states, in part, "Findin gs will be identified on n QA Audit / Surveillance Report Form.

These reports shall be used as soon as possible n fter completion of the surveillance with the distribution being as follows:

Contrnry to the above, findings were not always being identified on a "QA Audit / Surveillance Report Form."

It was observed that two recent surveillances performed on August 4 and 30,1985, to checklist No. 800-3 both noted discrepancies to the checklist requirements in that fire protection equipment was obstructed, blocked or otherwise had restricted access.

These results were not reported or identified as findings.

[C'd' G602030013 Bh;,hhge PDR ADOCK O PDR

\\

o

=

Mr. J. E. Gagliardo Page 2 December 23, 1985 Corrective Steps Which Have Been Taken and the Results Achieved This violation has been reviewed with the CNS QA Staff along with the applicable criterion of 10 CFR 50 Appendix B, QAI-4 and the definition of findings and observations as defined in QAI-5, Revision 19.

All site tour surveillances conducted by the CNS QA Staff since July 1, 1985 were reviewed.

The results of that review found that all discrepancies which had been

- identified during that time frame were appropriately dispositioned.

Corrective Steps Which -Will Be Taken To Avoid Further Violations All discrepancies noted in future site tour surveillances will be reported and documented in accordance with the CNS Quality Assurance Program.

Date When Full Compliance Will Be Achieved We are presently in full compliance.

If you have any questions regarding this response, please contact me.

Sincerely, J. M. Pflant Technical Staff Manager Nuc!ent Power Group JMP/GMC/VLW:dh20/6(14A)

,