NSD-NRC-97-4961, Forwards Rev 2 of WCAP-14401, Programmatic Level Description of AP600 Human Factors V&V Plan, to Address Dser Open Item 18.11.3.4-1 & Rev 2 to WCAP-14396, Man-In- the-Loop Test Plan Description

From kanterella
(Redirected from ML20138J278)
Jump to navigation Jump to search
Forwards Rev 2 of WCAP-14401, Programmatic Level Description of AP600 Human Factors V&V Plan, to Address Dser Open Item 18.11.3.4-1 & Rev 2 to WCAP-14396, Man-In- the-Loop Test Plan Description
ML20138J278
Person / Time
Site: 05200003
Issue date: 01/30/1997
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138J282 List:
References
NSD-NRC-97-4961, NUDOCS 9702060330
Download: ML20138J278 (2)


Text

_. _.... _._ _ __

w

=

l Westinghouse Energy Systems Bu 355 Electric Corporation Pittsburgh Pennsylvania 15230 0355 NSD-NRC-97-4%1 DCP/NRC0718 Docket No.: STN-52-003 January 30,1997 Document Control Desk U. S. Nuclear Regulatory Desk Washington, DC 20555 TO:

T.R. QUAY l

SUBJECT:

REVISIONS TO WCAPs 14401 AND 14396 TO COMPLETE WESTINGHOUSE I

ACTIVITIES FOR NUREG-0711 ELEMENTS 7 AND 10 l

REFERENCES:

1.

LETTER FROM NRC TO WESTINGHOUSE (HUFFMAN TO LIPARULO),

i COMMENTS ON THE HUMAN FACTORS VERIFICATION AND l-VALIDATION PLAN, DATED 1/10/97.

l 2.

LETTER FROM NRC TO WESTINGHOUSE (HUFFMAN TO LIPARULO),

l COMMENTS ON AP600 RELATED OPEN ITEMS ASSOCIATED WITH ELEMENT 7 OF THE HUMAN FACTORS ENGINEERING PROGRAM REVIEW MODEL (HFEPRM), DATED 12/19/%.

Dear Mr. Quay:

t l

Attsched is Revision 2 of WCAP-14401, Programmatic Level Description of the AP600 Human Factors Verification and Validation Plan to address DSER open item 18.11.3.4-1 per Reference 1.

. Changes, as previously accepted by Mr. Bongarra, were made to the first sentence of Section 4.2 on page 4-1 and ANSI /ANS-3.5-il93 was added to the reference list on page 7-1. This completes Westinghouse activities for NUREG-0711 Element 10, specifically DSER open item tracking system item 1392.

l l

Attached is Revision 2 of WCAP-143%, Man-In-The-Loop Test Plan Description to address DSER open item 18.8.1.3-3 per Reference 2. Changes, as previously accepted by Mr. Bongarra, were made l

to Performance Measures on page 4-5. This completes Westinghouse activities for NUREG-0711 Element 7, specifically DSER open item tracking system item 1356.

l Attached is an updated printout of the DSER Chapter 18 open items from the Open Item Tracking l

System (OITS). This is a list of only those DSER Chapter 18 items where NRC status is not

" Resolved" or " Closed". Excluding ITAAC items, only DSER OITS item 1395 is considered by p-Westinghouse to be " Action W".

Please advise Westinghouse as to the NRC status for these attached

/

items (if the NRC believes the status is " Action W", please advise as to what the required action is).

9702060330 970130 "

PJR ADOCK 05200003 B.

PDR;

-l

NSD-NRC-97-4%1 January 30,1997 DCP/NRC0718 If you have any questions regarding this transmittal, please contact Robin K. Nydes at (412) 374-4125.

llff8'Vf.

Brian A. 81cintyre, Manager Advanced Plant Safety and Licensing

/jml attachments cc:

Jim Bongarra, NRC - (IL, IE)

Bill Huffman, NRC - (IL, SE)

John O'Hara, BNL - (IL, IE)

Jim Higgins, BNL - (IL, IE)

I i

i 3%1a l

-