B16393, Application for Amend to License DPR-21,changing Bases Section 3.6,increasing Allowable Number of Plant Heatups & Cooldowns from 120 to 260 for Unit 1,reactor Pressure Vessel

From kanterella
(Redirected from ML20138H673)
Jump to navigation Jump to search
Application for Amend to License DPR-21,changing Bases Section 3.6,increasing Allowable Number of Plant Heatups & Cooldowns from 120 to 260 for Unit 1,reactor Pressure Vessel
ML20138H673
Person / Time
Site: Millstone 
Issue date: 04/29/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138H676 List:
References
B16393, NUDOCS 9705070247
Download: ML20138H673 (3)


Text

~ _ _ _ _.

__.___.e

__..___..__._m.__...

m. _. _ _ _ _ _ _ _. _. _ _ _ _

l he Nordioast

""P" F'"r "d- ("""

56)' **'""'d CT "'"

lYUCiear Energy um. ion,. Noacar power station Northeast Nudear Energy Company i

4 P.O. Ilo 128 f

Waterford, Cl ONE-Ol28 j

(860) 447-1791 Fax (860) 444-4277 The Northeast Utihtica Sy$ tem j

APR 2 91997 Docket No. 50-245 l

B16393 Re:

10CFR50.59 U. S. Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555 Millstone Nuclear Power Station, Unit No.1 Changes to Bases Section 3.6 (PTSCR 1-20-96)

Chanoes to Bases Section 3.7.B and 4.7 (PTSCR 1-17-96)

Northeast Nuclear Energy Company (NNECO) is providing the NRC Staff with changes to Bases Sections 3.6, 3.7.8 and 4.7 for information only. These changes have been reviewed and approved by the Millstone Unit No.1 Plant Operating Review Committee.

Description of Chanos Bases Section 3.6 - Thermal Limitation i

The change to Bases Section 3.6 will increase the allowable number of plant heatups and cooldowns from 120 to 260 for the Millstone Unit No.1 reactor i

pressure vessel. The Millstone Unit i reactor vessel is designed to resist the stresses and fatigue due to thermal cycling over a 40-year service life.

j This change is made to reflect the actual number of cycles anticipated through the end of current licensing term for Millstone Unit No.1. The change in numerical limits on operating transients does not alter any operating requirements.

Bases Section 3.7.B - Standby Gas Treatment System (SGTS)

The changes to Bases Section 3.7.B provides an updated testing standard for the SGTS high efficiency particulate absolute (HEPA) filter and charcoal adsorbers. The changes to the bases section provides additional clarification when the SGTS in-place leak test is required. The changes to the SGTS HEPA filter and charcoal adsorber test standards do not alter any operating requirements.

0C0137 p\\0D I

l l lll ll ll l lll 9705070247 970429 PDR ADOCK 05000245 P

PDR 1

J

l.'

U.S., Nuclear Regulitory Commission

  • B16393\\Page 2 a

Bases Section 4.7 - Primary Containment, Standby Gas Treatment System, Secondary Containment The changes to Bases Section 4.7 will not change the Technical Specifications requirements, design basis, or assumptions in the dose consequence calculations. This change will add a more conservative bases for the charcoal moisture content, in addition, the requirements of ANSI /ASME N509-1980, Table 5-1 has been applied to the new charcoal adsorber replacement instead of the Regulatory Guide (RG) 1.52, Table 1.

The RG does not address the charcoal physical property requirements in as much detail as the information described in ANSI /ASME N509-1980.

j This change is made to include more conservative and realistic data. The change to this section does not alter any operating requirements.

Please note due to pagination, pages B 3/4 7 6a, B 3/4 7-8a, and B 3/4 7-9a have been deleted.

There are no commitments in this letter. Should you have any questions, please contact R. W. Walpole at (860) 440-2191.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: John P. McElwain Millstone Unit No.1 Recovery Officer b

a BY:

>L m P. D. Hinnenkam)Q Director-Unit Operations cc:

H. J. Miller, Region 1 Administrator S. Dombek, NRC Project Manager, Millstone Unit No.1 T. A. Easlick, Senior Resident inspector, Millstone Unit No.1 W. D. Travers, PhD, Director, Special Projects Office

4 Docket No. 50-245 B16393 3

4 4

.l

,l i

i

?

i i

Millstone Nuclear Power Station Unit No.1 i

l Marked Up Bases Paaes 1

}

i i

i i

i i

j 1

i i

f April 1997 I