0CAN049704, Forwards Rev 19 to Quality Assurance Manual Operations, Which Incorporates Changes That Have Been Submitted to Staff & Approved Under Conditions of 10CFR50.54(a)(3)
| ML20138H479 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/24/1997 |
| From: | Hutchinson C ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20138H482 | List: |
| References | |
| 0CAN049704, CAN49704, NUDOCS 9705070197 | |
| Download: ML20138H479 (2) | |
Text
Ent2rgy operttions,Inc.
e
~~#
1448 S H 333 Russe +r&, AR 72901 Td 501858-4%3 C. Randy Hutchinson Vcc Preseg 0;cahors AND April 24,1997 OCAN049704 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station PI-137 Washington, DC 20555
Subject:
Arkansas Nuclear One - Units I and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Revision 19 to the Quality Assurance Manual Operations Gentlemen:
)
In accordance with 10CFR50.54(a)(3) and 10CFR50.71(e), enclosed are three controlled I
copies (Copy Nos.1-3) of Revision 19 to the Arkansas Nuclear One (ANO) Quality Assurance Manual Operations (QAMO). Controlled copies (Copy Nos. 8 and 9) are also being forwarded to Region IV.
The changes made in Revision 19 to the QAMO have been evaluated as required by 10CFR50.54(a) to determine if quality commitments have been reduced. Results of these evaluations have determined that these changes do not reduce any commitments in the quality program description previously accepted by the NRC. Also, Revision 19 of the QAMO incorporates changes that have been submitted to the Staff and approved under the provisions of 10CFR50.54(a)(3). The record of revision section of the QAMO identifies changes implemented by this revision.
As required by 10CFR50.71(e)(2), I hereby cenify that to the best of my knowledge and belief, the information contained in Revision 19 to the QAMO accurately represents changes made since the previous submittal. These changes reflect information and analysis submitted to the Commission or prepared pursuant to Commission requirements for changes made under the provision of 10CFR50.54(a)(3).
t 90 5 0
' \\
k g [ nllil lssi llll1 llllllllllll ll Wl l isillllJIlll 9705070197 970424
' l PDR ADOCK 05000313 P
U. S. NRC April 24,1997 OCAN049704 Page 2 Very truly yours, I~>v
'1/nbm Att ichment cc:
Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 Mr. George Kalman NRR Project Manager Region IV/ANO-1 & 2 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 j
3 i
!