Text
__
- ) Northeast
""id'"Y "d' (""" '")' **'"'""um85
. Nuclear Energy siai,too, Noarar Power staiioo Northcet Nuclear Energy Cornpany P.O. Box 128 Waterfoni, CT 06385-0128 (860) 447-1791 Fax (860) 444-4277 The Northcant Utilities System Docket No. 50-423 B16406 Re: 10CFR 50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk APR 281997 Washington, DC 20555 Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification Centrifuaal Charaina Pump and Safety Iniection Pump Surveillances (PTSCR 3-13-96)
Pursuant to 10CFR 50.90, Northeast Nuclear Energy Company (NNECO) hereby proposes to amend Operating License NPF-49 by incorporating the attached proposed revision into the Millstone Unit No. 3 Technical Specifications Surveillances 4.1.2.3.1, 4.1.2.4.1, 4.5.2.f and 4.5.2.h.
Description of Proposed Revision Technical Specification Surveillances 4.1.2.3.1, 4.1.2.4.1, 4.5.2.f and 4.5.2.h require the centrifugal charging and safety injection pumps be tested on a periodic basis and after modifications that alter subsystem flow characteristics. The proposed revision to these specifications includes an increase in the required differential pressure at recirculation flow for the safety injection and centrifugal charging pumps, a decrease in the required individual safety injection and centrifugal charging pump injection line flow rates, an increase in the allowed individual safety injection pump total flow rate, and editorial changes to the surveillances.
Markup of Proposed Revision A copy of the marked up Technical Specification pages is contained in Attachment 2.
The markup reflects the currently issued version of the Technical Specifications.
Pending Technical Specifications revisions or Technical Specification revisions issued subsequent to this submittal are not reflected in the enclosed markup.
Retype of Proposed Revision A copy of the retyped Technical Specification pages is contained in Attachment 3. The retyped pages reflect the currently issued version of the Technical Specifications.
Pending Technical Specification revisions or Technical Specification revisions issued I
po@ b 0G0031 9705060185 970428 ll ll lll lll llll lll, PDR ADOCK 05000423 P
- PDR, 1
=..
U.S. Nucicar Regulatory Commission B16406 Page 2 l
subsequent to this submittal are not reflected in the enclosed retype. The enclosed retype should be checked for continuity with Technical Specifications prior to issuance.
Backaround. Safety Assessment. Sianificant Hazards Consideration and l
Environmental Considerations The Background, Safety Assessment, Significant Hazards Consideration and i
1 Environmental Considerations that support the proposed revision are contained in Attachments 4 and 5.
4 4
Plant Operations Review Committee and Nuclear Safety Assessment Board Review i
The Plant Operations Review Committee and Nuclear Safety Assessment Board have reviewed this proposed amendment request and concur with the contained determinations.
State Notification 4
in accordance with 10CFR 50.91(b), we are providing the State of Connecticut with a copy of this proposed amendment request to ensure their awareness of this request.
Schedule Reauest for NRC Approval 4
NNECO requests NRC review and approval of this proposed change by October 25, 1997, and that the license amendment be ef'ective upon issuance with implementation l
within sixty (60) days.
If the NRC Staff should have any questions or comments regarding this submittal, please contact Mr. J. Peschel at (860) 437-5840.
l Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY
- 41}
Vice President - Mills \\
M. R. Brotheh i
tone Unit No. 3 Subscribed and sworn to before me this cf/
day of 1997 yRu~)O O$l Date Commission Expires:
n 2002
~
J cc:
See Page 3 4
7
U.S. Nuclear Regulatory Commission B16406 Page 3 cc:
H. J.
Miller, Region I Administrator W.D. Travers, Ph. D., Director, Special Projects Office J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 Mr. Kevin T.A. McCarthy, Director Bureau of Air Management Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127
Docket No. 50-423 B16406 Millstone Nuclear Power Station Unit No. 3 Proposed Revision to Technical Specification Centrifuaal Charaina Pump and Safety 89ction Pump Surveillances PTSCR 3-13-96 NNECO's Commitments 1
4 April 1997
U S. Nuclear R:gulatory Commission l
B16406\\ Attachment 1\\Page 1 Enclosure List of Regulatory Commitments l
The following table identifies those actions committed to by NNECO in this document.
I Any other actions discussed in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the NRC's information and are not regulatory commitments.
Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.
Commament Committed Date or Outage NONE N/A
..... -. _.. _. _..... _... -. _. - _ _. _,. - _ _... _. _.... _.. _ ~.. _ _... _ _...
i l
l r
i
~.
l Docket No. 50-423 l
B16406 i
l l
l i
1 I
i
(
l l
l 1
1 l
I 1
l i
l
\\
l i
l l
Millstone Nuclear Power Station Unit No. 3 i
Proposed Revision to Technical Specification Centrifuaal Charaina Pumo and Safety Iniection Pumo Surveillances PTSCR 3-13-96 Marked Up Paaes 1
1 4
i 2
April 1997 i
i
~k 4-1 I
{-
U:8. Nuclear Regulatory Commission 816406\\ Attachment 2\\Page 1 MARKUP OF PROPOSED REVISION 1
)
Refer to the attached markup of the proposed revision to the Technical Specifications.
The attached markup reflects the currently issued version of the Technical Specifications listed below. Pending Technical Specification revisions or Technical Specification revisions issued subsequent to this submittal are not reflected in the enclosed markup.
l The following Technical Specification changes are included in the attached markup.
]
The required differential pressure for the centrifugal charging pump is being i
increased from 2411 psid to 2464 psid (5676 ft.) in surveillances:
4.1.2.3.1 4.1.2.4.1 4.5.2.f The required differential pressure for the safety injection pump is being increased from 1348 psid to 1406 psid (3240 ft.) in surveillances:
4.5.2.f The referenced units for the centrifugal charging and safety injection pumps are changed from differential pressure measured in psid to total head measured in feet in surveillances:
4.1.2.3.1 4.1.2.4.1 4.5.2.f The required individual centrifugal charging pump injection line flow rate sum is being decrease from 339 gpm to 310.5 gpm in surveillance:
4.5.2.h The required individual safety injection pump injection line flow rate sum is being decreased from 442.5 gpm to 423.4 gpm in surveillance:
4.5.2.h The maximum allowed individual safety injection pump total flow rate is being increased for Pump A from 670 gpm to 675 gpm and for Pump B from 650 gpm to 675 gpm in surveillance:
4.5.2.h
_