SNRC-1216, Forwards Shoreham Nuclear Power Station Startup Test Rept. Rept Addresses Startup Tests Identified in FSAR Chapter 14 to Be Performed in Test Conditions of Open Vessel & Heatup
| ML20137B452 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 11/22/1985 |
| From: | Leonard J LONG ISLAND LIGHTING CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20137B457 | List: |
| References | |
| SNRC-1216, NUDOCS 8511260276 | |
| Download: ML20137B452 (1) | |
Text
r-'
p i
L l
xxxtrmwa mwwemmtess l
gggl LONG ISLAND LIGHTING COMPANY SHOREHAM NUCLEAR POWER STATION w.--me mu,,;
P.O. BOX 618, NORTH COUNTRY ROAD + WADING RIVER. N.Y.11792 JOHN D. LEON ARD, JR.
vtCE PR ESIDENT. NUCLEAR OPE R ATIONS NOV 221985 SNRC-1216 Mr. Harold R.
Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Startup Test Report Shoreham Nuclear Power Station Docket No. 50-322
Dear Mr. Denton:
Attached is the Startup Report written by the Long Island Lighting Company in compliance with Shoreham Nuclear Power Station Techni-cal Specifications, paragraph 6.9.1.1 through 6.9.1.3, and Regulatory Guide 1.16, Revision 4, section C.l.a.
This report addresses each of the startup tests identified in Chapter 14 of the FSAR to be performed in the test conditions of Open Vessel and Heatup.
It includes a description of the measured operating condition values or characteristics obtained during the test program with a comparison of these values to the acceptance criteria, together with a description of any corrective actions required to obtain satisfactory operation.
If there are any questions, please contact this office.
Very truly yours,
_1 Sf D. Leonard, Jr.
Vice President-Nuclear Operations PGP:ck Attachment cc: