HL-5327, Forwards Ei Hatch Nuclear Plant Unit 2 Cycle 13 COLR, Rev 1
| ML20136B971 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/07/1997 |
| From: | Sumner H GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20136B975 | List: |
| References | |
| HL-5327, NUDOCS 9703110218 | |
| Download: ML20136B971 (1) | |
Text
Georgia Powtr Company 40 invemssa Canter Parkway Birmingham, Alabama 35242 Teixphone 205 870-6011 Matl#ng Address:
A Post Office Box 1295 Birmingham, Alabama 35201 g
GeorgiaIbwer Nuclear operations Department dmx p March 7, 1997 Docket No. 50-366 HL-5327 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin 1. Hatch Nuclear Plant - Unit 2 Cycle 13 Core Operating Limits Report. Revision I Gentlemen:
This letter transmits an information copy of the Hatch Unit 2 Cycle 13 Core Operating Limits Report (COLR), Revision 1. The revision reflects the cycle-specific core operating limits developed using NRC approved methods. Also, editorial / format changes were made to achieve consistency with the Unit 1 COLR.
Should you have any questions regarding the enclosed COLR revision, please contact this office.
Sincerely, W
H. L. Sumner, Jr.
Vice President - Nuclear Hatch Project IFL/eb
Enclosure:
Unit 2 Cycle 13 Core Operating Limits Report, Revision I cc: Georgia Power Company Mr. P. H. Wells, Nuclear Plant General Manager Q\\
NORMS
.K
(
U. S. Nuclear Regulatory Commission. Washington. D. C.
Mr. K Jabbour, Licensing Project Manager - Hatch
\\
U. S. Nuclear Regulatory Commission. Region ll Mr. L. A. Reyes, Regional Administrator Mr. B. L. Holbrook, Senior Resident Inspector - Hatch 1Innn.
9703110218 970307 DR ADOCK 0500 6
$5 MERE lERI)