HL-5327, Forwards Ei Hatch Nuclear Plant Unit 2 Cycle 13 COLR, Rev 1

From kanterella
(Redirected from ML20136B971)
Jump to navigation Jump to search
Forwards Ei Hatch Nuclear Plant Unit 2 Cycle 13 COLR, Rev 1
ML20136B971
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/07/1997
From: Sumner H
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20136B975 List:
References
HL-5327, NUDOCS 9703110218
Download: ML20136B971 (1)


Text

Georgia Powtr Company

, 40 invemssa Canter Parkway Birmingham, Alabama 35242

. Teixphone 205 870-6011

, Matl#ng Address: A Post Office Box 1295 Birmingham, Alabama 35201 g

GeorgiaIbwer Nuclear operations Department dmx p March 7, 1997 Docket No. 50-366 HL-5327 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin 1. Hatch Nuclear Plant - Unit 2 Cycle 13 Core Operating Limits Report. Revision I Gentlemen:

This letter transmits an information copy of the Hatch Unit 2 Cycle 13 Core Operating Limits Report (COLR), Revision 1. The revision reflects the cycle-specific core operating limits developed using NRC approved methods. Also, editorial / format changes were made to achieve consistency with the Unit 1 COLR.

Should you have any questions regarding the enclosed COLR revision, please contact this office.

Sincerely, W

H. L. Sumner, Jr.

Vice President - Nuclear Hatch Project IFL/eb

Enclosure:

Unit 2 Cycle 13 Core Operating Limits Report, Revision I cc: Georgia Power Company Mr. P. H. Wells, Nuclear Plant General Manager Q\

NORMS .K

(

U. S. Nuclear Regulatory Commission. Washington. D. C.

Mr. K Jabbour, Licensing Project Manager - Hatch

\

U. S. Nuclear Regulatory Commission. Region ll Mr. L. A. Reyes, Regional Administrator Mr. B. L. Holbrook, Senior Resident Inspector - Hatch 1Innn.

9703110218 970307 DR ADOCK 0500 6

$5 MERE lERI)