NPL-97-0060, Forwards Completed Guideline Pbsg 7.2, Vitalization of Unit Two

From kanterella
(Redirected from ML20135F229)
Jump to navigation Jump to search
Forwards Completed Guideline Pbsg 7.2, Vitalization of Unit Two
ML20135F229
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 03/05/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20135F231 List:
References
NPL-97-0060, NPL-97-60, NUDOCS 9703110284
Download: ML20135F229 (1)


Text

~ Wisconsin Electnc POWER COMPANY Point Beoch Nuclear Plant (414) 755-2321 6610 Nuclear Rd., Two Rivers. WI 54241 NPL 97-0060 March 5,1997 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Stop PI-137 Washington, DC 20555 Ladies and Gentlemen:

DOCKET 50-301 FACADE REVITALIZATION POINT BEACH NUCLEAR PLANT. UNIT 2 Enclosed per the request of Mr. T. J. Madeda of Region ill is completed guideline PBSG 7.2,

" Vitalization of Unit Two." The guideline was used by our. security, staff during the revitalization of Unit 2 following steam generator replacement. This guideline was reviewed with the NRC resident inspectors on February 26,1997.

Sincerely, T -

Douglas F. Johnson Manager -

Regulatory Services & Licensing /

/

/

bds I Enclosure f'NY f l

cc: T. J. Madeda, NRC Region III l l

~

9703110284 970305 PDR ADOCK 05000301 110102 E888!8I88l8i883 a sus a ,awuwaasuntav a,enus l