ST-HL-AE-1146, Forwards Rev 8 to QA Program Description During Design & Const & Rev 9 to Nuclear QA Program Manual

From kanterella
(Redirected from ML20134P106)
Jump to navigation Jump to search
Forwards Rev 8 to QA Program Description During Design & Const & Rev 9 to Nuclear QA Program Manual
ML20134P106
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/02/1984
From: Oprea G
HOUSTON LIGHTING & POWER CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20134P108 List:
References
ST-HL-AE-1146, NUDOCS 8509060136
Download: ML20134P106 (6)


Text

_

,0 r

' The Light NE f Ilouston Lighting & Power P.O. Ilox 1700 llouston, Texas 77001 (713) 228-9211 November 2, 1984 ST-HL-AE-1146 File No.: C9.11/Q39.

Mr. Robert D. Martin g--

I Regional Administrator, Region IV

] m-SW (j!

Nuclear Regulatory Commission j

t 611 Ryan Plaza Dr., Suite 1000 Arlington, TX 76011 l

South Texas Project L

Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Quality Assurance Program for the Design and Construction Phase of the South Texas Project

.1

Dear Mr. Martin:

Enclosed is Revision 8 of the Quality Assurance Program Description (QAPD) for the design and construction phase of the South Texas Project (STP).

This revision is being submitted in accordance with the requirements of 10CFR50.55(f)(3).

This submittal consists of the following:

a complete replacement for Part A, Houston Lighting and Power Company (HL6P) QAPD; copies of correspondence between Bechtel and the NRC to be used in conjunction with the Bechtel Topical Report BQ-TOP-1, Revision 3A (Part B); and replacement pages for three sections of Part C, Ebasco Services, Inc. (ESI) QAPD Quality Assurance Program for the South Texas Project.

Part A has been revised to reflect changes within various organizations; and to clarify the areas of responsibilities of the Project and Corporate QA audit programs.

Part B has been amended to reflect the reorganization of the Bechtel group of companies and the consolidation of the Bechtel Power Corporation's four power divisions into two regional operations.

8509060136 841102 PDR ADOCK 05000498 A

PDR V

d W1/LNRC/k l l

-______-_______-_-______-__-_--_____-a

ST-HL-AE-1146

[

File Number: G9.I1/Q39 i

, Houston Lighting & Power Company Page 2 Part C was revised to clarify the initial QA review of Quality Control certifications; to include the processing of interim approvals for field change requests; and to clarify review and acceptance responsibilities for responses to audit reports. As stated in previous submittals, changes to Part C are noted by change bars in the right margin; the revision status in the upper right hand corner of each individual section may differ from the Revision 8 indicators in the body of the document and are not applicable to this submittal.

This submittal is consistent with the draft copy that your office has already informally reviewed, with one exception. The position description for the Lead, Quality Engineering Assessment Group has been deleted to be consistent with the level of management described for other departments; the position will be described in the Project QA Plan and the implementing procedures.

The changes described in Revision 8 of the QAPD do not reduce the commit-ments contained in Revision 7, and these changes are being implemented immedi-ately. The revised QAPD continues to satisfy the criteria of 10CFR50 Appendix B.

Attached is a detailed description of each change, including the basis for concluding that the previous commitments have not been reduced. Also, at-tached is an instruction sheet which describes how to update the manual.

Copies of Revision 8 to the QAPD are also being submitted to the NRC Resident Inspector at the South Texas Project site and to the NRC Document Control desk as required by 10CFR50.55(f)(3)(i).

If you have any questions, please contact Mr. Michael E. Powell at 713/993-1330.

Very truly yours.

x-

. prea Executive e President GWO/JWE/BSN:jt Attachments Wl/LNRC/k

\\

l ST-HL-AE-1146 File No: G9.11/Q39.

Page 3 cc:

Darrell G. Eisenhut. Director J. B. Poston/A. vonRosenberg Division of Licensing City Public Service Board Office of Nuclear Reactor Regulation P. O. Box 1771 U.S. Nuclear Regulatory Commission San Antonio, TX 78296 Washington, DC 20555 Brian E. Berwick, Esquire Victor Nerses, Project Manager Assistant Attorney General for U.S. Nuclear Regulatory Commission the State of Texas 7920 Norfolk Avenue P. O. Box 12548, Capitol Station Bethesda, MD 20814 Austin, TX 78711 D. P. Tomlinson Lanny Sinkin Resident Inspector / South Texas Project Citizens Concerned About Nuclear Power c/o U.S. Nuclear Regulatory Commission 114 W. 7th, Suite 220 P. O. Box 910 Austin, TX 78701 Bay City, TX 77414 Robert G. Perlis, Esquire Dan Carpenter Hearing Attorney Resident Inspector / South Texas Project Office of the Executive Legal Director c/o U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission P. O. Box 910 Washington, DC 20555 Bay City, TX 77414 Charles Bechhoefer, Esquire M. D. Schwarz, Jr., Esquire Chairman, Atomic Safety & Licensing Board Baker & Botts U.S. Nuclear Regulatory Commission One Shell Plaza Washington, DC 20555 Houston, TX 77002 Dr. James C. Lamb,11I J. R. Newman, Esquire 313 Woodhaven Road Newman & Holtzinger, P.C.

Chapel Hill, NC 27514 1615 L Street, N.W.

Washington, DC 20036 Judge Ernest E. Hill Hill Associates Director, Office of Inspection 210 Montego Drive and Enforcement Danville, CA 94526 U.S. Nuclear Regulatory Commission Washington, DC 20555 William S. Jordan, III, Esquire Harmon & Weiss E. R. Brooks /R. L. Range 1725 I Street, N.W.

Central Power & Light Company Suite 506 P. O. Box 2121 Washington, DC 20006 Corpus Christi, TX 78403 Citizens for Equitable Utilities. Inc.

H. L. Peterson/G. Pokorny c/o Ms. Peggy Buchorn City of Austin Route 1, Box 1684 P. O. Box 1088 Brazoria, TX 77422 Austin, TX 78767 Docketing & Service Section Office of the Secretary U.S. Nuclear Regulatory Commission Washington, DC 20555 W2B/COMREC/c Revised 10/01/84

9 QUALITY ASSURANCE PROGRAM DESCRIPTION FOR THE DESIGN AND CONSTRUCTION OF THE SOUTH TEXAS PROJECT REVISION 8 CHANGES Part A, Houston Lighting & Power Company (HL&P QAPD)

Paragraphs 1.5, 1.5.16, and 1.5.19: Changed reporting relationship for the Manager, Nuclear Licensing to the Vice President, Nuclear Engineering and Construction. Clarification; no reduction in commitment has occurred.

Paragraph 1.5.5: Position title change from Site Engineering and Construction Manager to Site Construction Manager. Clarification; no reduction in commitment has occurred.

Paragraphs 1.5.6 and 1.5.7: Three supervisory engineering positions were transferred from the Houston office to the site to enhance the owner's review of design work performed by the prime contractors. This is an upgrade; no reduction in commitment has occurred.

Paragraph 1.5.10:

Changed reporting relationship for project direction for the Supervising Engineer, STP Licensing to the Manager, Engineering.

Additionally, the position of STP Licensing Team Leader was deleted and his responsibilities were transferred to the Supervising Et gineer, STP Licensing. Clarification; no reduction in commitment has occurred.

Paragraphs 5.0 and 18.0:

Clarified the areas of responsibility for the Project and Corporate QA audit programs.

No reduction in commitment has occurred.

Figure 1: Modified to reflect above organizational changes.

Clarification; no reduction in commitment has occurred.

Part B, Bechtel Energy Corporation (BEC QAPD)

Bechtel Group, Inc., and its operating companies, including the Bechtel Power Corporation (BPC) were restructured to include two new subsidiary organizations - Bechtel Construction, Inc. (BCI) and Bechtel Constructors Corporation (BECC). This change does not affect the South Texas Project and information relative to this change is provided for continuity only.

The Bechtel Power Corporation was restructured from four power divisions to two regional operations - the Western Power Division, consisting of the former San Francisco and Los Angeles power divisions; and the Eastern Power Division consisting of the former Ann Arbor and Gaithersburg power divisions. No quality assurance programmatic changes are anticipated at the project level because of the reorganization; no reduction in commitment has occurred.

l I

l-

Part C, Ebasco Services, Inc. -(ESI QAPD)

Section QA-I-3, Paragraph 8.0:

Revised the fourth sentence from " auditing" to " reviewed" and revised the position title from " Director Quality Assurance" to " Manager Quality Assurance Engineering." This is a clarification; no reduction in commitment has occurred.

Section QA-III-2, Paragraph 3.2.2:

Revised to include the processing of an interim approval to field change requests. Clarification; no reduction in commitment has occurred.

Section QA-III-2, Paragraph 3.5.2.1:

Added a subparagraph to explain how to obtain an interim approval of a field change' request.

Clarification; no reduction in commitnent has occurred.

Section QA-III-9, Paragraph 3.10.1:

Reworded sixth line to read "... Lead Auditor or the management of the audtting group..."

This is a clarification to be consistent with ANSI N45.2.12; no reduction in commitment as occurred.

i l

l L-

Instructions for updating of the manual.

Remove Insert 1.

Controlled Manual Identification

1. Controlled Manual Identification Sheet, Revision 7 Sheet, Revision 8 2.

Letter from G. W. Oprea, Jr.

2. Letter from G. W. Oprea, Jr.

(HL&P) to J. T. Collins (NRC)

(HL&P) to R. D. Martin (NRC) dated July 27, 1984 and dated November 2, 1984 and attached description of changes.

attached description of changes.

3.

All Part A. Revision 7

3. New Part A, Revision 8 4.

Part, B, Revision 7 Cover Sheet

4. Part B, Revision 8 Cover Sheet
5. Explanatory sheet and attached 5.

correspondence between BPC and the NRC, directly in front of the BQ-TOP-1, Rev. 3A Cover Sheet.

6.

Part C, Revision 7 Cover Sheet.'

6. Part C Revision 8 Cover Sheet.

7.

Part C, Table of Contents,

7. Part C, Table of Contents, dated 07/05/84.

dated 09/24/84.

8.

Part C, Section QA-I-3,

8. Part C, Section QA-I-3, dated 07/05/84, dated 09/24/84.

9.

Part C Section QA-III-2

9. Part C Section QA-III-2, dated 07/05/84 dated 09/24/84.

10.

Part C, Section QA-III-9

10. Part C. Section QA-III-2, dated 07/05/84.

dated 09/24/84.

QAPD 1/1000/BSN