NG-96-2452, Forwards Duane Arnold Energy Ctr Cycle 15 COLR, Rev 0
| ML20134M608 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 11/08/1996 |
| From: | Peveler K IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| To: | Miraglia F NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20134M611 | List: |
| References | |
| NG-96-2452, NUDOCS 9611250185 | |
| Download: ML20134M608 (1) | |
Text
Duane Amold Energy Center 3277 DAEc Road Palo, IA 52324 Telephone 319 8517611 Fax 319 8517611 UTILITIES November 8,1996 NG-96-2452 Mr. Franli Miraglia, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn: Document Control Desk 1
Mail Station PI-37 Washington, DC 20555-0001
Subject:
Duane Arnold Energy Center Docket No: 50-331 Op. License No: DPR-49 4
Core Operating Limits Report for DAEC Cycle 15 Operation File: A-117, J-60a
Dear Mr. Miraglia:
In accordance with the requirements of Duane Arnold Energy Center Technical Specification, Section 6.11.2.d, a copy of the Core Operating Limits Report (COLR) for Cycle 15 operation is enclosed. This COLR has been prepared using NRC-approved methods and confirms that all applicable limits of the safety analysis report have been met.
No new commitments are made by this letter.
+
Please contact this office if you have any questions regarding this matter.
Sincerely, cfY f Kenneth E. Peveler Manager, Nuclear Licensing and Emergency Planning
Enclosure:
Duane Arnold Energy Center Core Operating Limits Report - Cycle 15, Rev. O KEP/RAB/rab CC: R. Browning I
J. Franz (w/o Enclosure)
AODI i
L. Liu (w/o Enclosure)
T\\
G. Kelly (NRC-NRR)
A. B. Beach (NRC-Region Ill)
NRC ResidentOQcg,j g DOCU 9611250185 961108 PDR ADOCK 05000331 An 1Es insustnes company P