PY-CEI-NRR-0318, Forwards Rev 1 to 80A5237, Pump & Valve Inservice Testing Program. Changes Made to Ensure Compatibility W/Tech Specs, FSAR & NRC Guidance Documents.Status & cross-ref of Relief Requests from Revs Also Encl

From kanterella
(Redirected from ML20134G619)
Jump to navigation Jump to search
Forwards Rev 1 to 80A5237, Pump & Valve Inservice Testing Program. Changes Made to Ensure Compatibility W/Tech Specs, FSAR & NRC Guidance Documents.Status & cross-ref of Relief Requests from Revs Also Encl
ML20134G619
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 08/21/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20134G620 List:
References
PY-CEI-NRR-0318, PY-CEI-NRR-318, NUDOCS 8508270085
Download: ML20134G619 (7)


Text

,

.j u

~

t

~ '

+

t' i*3] '3

, g

,1

  • 1 w

s

\\ _ _t i;i 6

\\-

A r 4 4

y P.O. BOX 5000 - CLEVELAND. OHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMIN ATING BLOG. - 55 PUBLICSQUARE Seiving The Best Location in the Nation MURRAY R. EDELMAN UICE PRESIDENT NUCLEAR August 21, 1985 PY-CEI/NRR-0318 L Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Pump and Valve inservice Testing Program License Condition 26

Dear Mr. Youngblood:

Attached is Revision 1 to the Perry Nuclear Power Plant Unit 1 inservice Testing Program (IST) for Pumps and Valves (Document No. 80A5237, Rev. 1).

The original PV IST Program was submitted by letter dated June 15, 1983 (PY-CEI/NRR-0051L). Since then, changes have been made to the Program to ensure compatibility with the Perry Technical Specifications, the PNPP Final Safety Analysis Report, and NRC guidance documents.

I Attached also to this letter is a status and cross-reference of the relief requests from both revisions. Please feel free to call if you have any questions concerning this matter.

.Very truly yours, W

v Murray g/. Edelman Vice President Nuclear Group MRE:njc

/

/

Attachment D

Y cc: Jay Silberg, Esq.

g,

(\\

4N John Stefano (2) g 4

J. Grobe W

B508270085 850821 PDR ADOCK 05000440 PDR A

P Attachment PY-CEI/NRR-0318 L Page 1 of 6 The following is a status of the relief requests, for the PNPP Pump and Valve Inservice Testing Program (Document No. 80A5237), along with a cross reference linking the two sets of relief requests in Revisions 0 and 1.

REVISION 0 STATUS /REF.

REVISION O STATUS /REF.

General Req.

Deleted Valve Req.

No Change Pumps, G-1 CS-1 IB21 (Ref. VR-10)

(Page I-8)

(Page 111-10-9)

General Req.

Revised Valve Req.

No Change Valves, G-1 (Ref. VR-2)

RR-1 1B21 (Ref. VR-20)

(Page I-9)

(Page 111-10-10)

General Req.

Deleted Valve Req.

No Change Valves G-2 RR-2 1B21 (Ref. VR-20)

(Page I-10)

(Page 111-10-11)

Pump Req.

Rcvised Vaive Req.

No Change IE51 (Ref. PR-1)

RR-3 IB21 (Ref. VR-20)

(Page-II-1-5)

(Page 111-10-12)

Pump Req.

Revised Valve Req.

Revised IP45 (Ref. PR-6)

RR-4 IB21 (Ref. VR-6)

(Page 11-1-6)

(Page 111-10-13)

Pump Req.

Revised Valve Req.

No Change IC45 (Ref. PR-3)

RR-1 1P43 (Ref. VR-13)

(Page 11-1-7)

(Page 11[-11-4)

C/S Req.

Revised Valve Req.

No Change CS-1 1B21 (Ref. VRS)

RR-2 IP43 (Ref. VR-28)

(Page III-1-3)

(Page 111-11-5)

Valve Req.

Revised Valve Req.

No Change RR-1 1821 (Ref. VR-28)

RR-3 IP43 (Ref. VR-29)

(Page 111-1-4)

(Page 111-11-6)

Valve Req.

Deleted Valve Req.

No Change RR-1 IPil CS-1 IE51 (Ref. VR-23)

(Page III-2-3)

(Page 111-13-7)

Valve Req.

Revised Valve Req.

No Change CS-1 IP52 (Ref. VR-15)

CS-2 IE51 (Ref. VR-9)

(Page III-5-3)

Page 111-13-8)

Valve Req.

No Change Valve Req.

Revised RR-1 IPS2 (Ref. VR-28)

RR-1 lE51 (Ref. VR-14)

(Page III-5-4)

(Page III-13-9)

Attachment PY-CEI/NRR-0318 L Page 2 of 6 REVISION 0 STATUS /REF.

REVISION 0 STATUS /REF.

Valve Req.

No Change Valve Req.

No Change CS-1 1E12 (Ref. VR-8)

CS-1 1E21 (Ref. VR-8)

(Page 111-14-16)

(Page III-21-4)

Valve Req.

No Change Valve Req.

No Change CS-2 1E12 (Ref. VR-8)

CS-2 1E21 (Ref. VR-23)

(Page 111-14-17)

(Page 111-21-5)

Valve Req.

No Change Valve Req.

No Change CS-2 1E12 (Ref. VR-23)

RR-1 1P22 (Ref. VR-29)

(Page III-14-18)

(Page 111-22-3)

Valve Req.

Revised Valve Req.

No Change CS-4 1E12 (Ref. VR-22)

RR-1 1P45 (Ref. VR-21)

(Page 111-14-19)

(Page III-25-9)

Valve Req.

No Change Valve Req.

Deleted CS-5 1E12 (Ref. VR-8)

RR-2 1P45 (Page 111-14-20)

(Page 111-25-10)

Valve Req.

Revised Valve Req.

No Change RR-1 1E12 (Ref. VR-30)

CS-1 1C11 (Ref. VR-11)

(Page 111-14-21)

(Page 111-28-5)

Valve Req.

Deleted Valve Req.

No Change RR-2 1E12 RR-1 1C11 (Ref. VR-12)

(Page 111-14-22)

(Page 111-28-6)

Valve Req.

No Change Valve Req.

No Change RR-1 1G41 (Ref. VR-28)

RR-2 1C11 (Ref. VR-41)

(Page 111-15-6)

(Page 111-28-7)

Valve Req.

No Change Valve Req.

Deleted CS-1 1G33 (Ref. VR-40)

RR-3 1C11 (Page III-16-4)

(Page 111-28-8 Valve Req.

No Changa Valve Req.

No Change RR-1 1C41 (Ref. VR-18)

RR-4 1C11 (Ref. VR-28)

(Page 111-19-16)

(Page III-28-9)

Valve Req.

No Change Valve Req.

No Change CS-1 1E22 (Ref. VR-8)

CS-1 IN27 (Ref. VR-19)

(Page 111-20-7)

(Page III-31-5)

Valve Req.

No Change Valve Req.

No Change CS-2 1E22 (Ref. VR-23)

CS-2 IN27 (Ref. VR-8)

(Page 111-20-6)

(Page III-31-6)

Valve Req.

No change RR-1 1E22 (Ref. VR-25)

(Page III-20-7)

Attachment PY-CEI/NRR-0318 L Page 3 of 6 REVISION 1 STATUS /REF.

Generic Req.

Added GR-1 (Page 5)

PUMP REQUIRED PR-1 Revised-Ref. Pump Req. IE51 (Page 11-1-5)

Page 10 PR-2 Added Page 11 PR-3 Revised - Ref. Pump Req. IC41 (Page 11-1-7)

Page 12 PR-4 Added Page 13 PR-5 Added Page 14 PR-6 Revised - Ref. Pump Req. IP45 (Page 11-1-7)

Page 15 PR-7 Added Page 16 PR-8 Added Page 17 PR-9 Added Page 18 VALVE REQUIRED VR-1 Added Page 35 VR-2 Revised - Ref. General Req. Valves G-1 (Page I-9)

Page 36 VR-3 Added Page 37 VR-4 Added Page 38

Attachment PY-CEI/NRR-0318 L Page 4 of 6 REVISION 1 STATUS /REF.

VR-5 Revised - Ref. Valve Req. CS-1, 1B21 (Page 111-1-3)

Page 39 VR-6 Revised - Ref. Valve Req. RR-4 1B21 (Page 111-10-13)

Page 40 VR-7 Added Page 41 VR-8 Ref. Valve Req's: CS-1, IE12 (Page 111-14-16) CS-2, IE12 Page 42 (III-14-17) CS-5, IE12 (111-14-20) CS-1, IE22 (III-20-7)

CS-1, IE21 (III-21-4) CS-2, IN27 (III-31-6)

VR-9 Ref. Valve Req. CS-2, 1E51 (Page 111-13-8)

Page 43 VR-10 Ref. Valve Req. CS-1, 1B21 (Page III-10-9)

Page 44 VR-11 No Change - Ref. Valve Req. CS-1, IC11 (Page 111-28-5)

Page 45 VR-12 No Change - Ref. Valve Req. RR-1,1C11 (Page III 6)

Page 46'

/

VR-13l No Change - Ref. Valve Req. RR-1, IP43 (Page 111-11-4)

Page 47 VR-14 Revised - Ref. Valve Req. RR-1, IE51 (Page III-13-9)

Page 48 VR-15 Revised - Ref. Valve Req. CS-1, IP52 (Page 111-5-3)

Page 49 4

VR-16 Added Page 50 VR-17 Added Page 51 VR-18 No Change - Ref. Valve Req. RR-1, IC41 (Page 111-19-6)

Page 52 VR-19 No Change - Ref. Valve Req. CS-1, IN27 (Page III-31-5)

Page 53 VR-20 No Change - Ref. Valve Req: RR-1, 1821 (PAGE 111-10-10)

Page 54 RR-2, 1821 (Page 111-10-11) RR-3, 1B21 (Page 111-10-12)

VR-21 No Change-Ref. Valve Req. RR-1, IP45 (Page III-25-9)

Page 55

L Attachment PY-CEI/NRR-0318 L Page 5 of 6 REVIS'!ON 1 STATUS /REF.

VR-22 Added Page 56 VR-23 No Change - Ref. Valve Reg: CS-1, IE51 (Page 111-13-7)

Page 57 CS-2, IE12 (Page 111-14-18) CS-2, IE22 (Page 111-20-6) CS-2, e

IE21 (Page-III-21-5)

VR-24 Added Page 58 VR-25 No Change - Ref. Valve Req. RR-1, IE22 (Page III-20-7)

Page 59 VR-26 Added Page 60 VR-27 Added Page 61 VR-28 No Change - Ref. Valve Reg:

RR-1, IG41 (Page 111-15-6)

Page 62 RR-4, IC11 (Page 111-28-9) RR-1, 1B21 (Page 111-1-4) RR-1 IPS2 (III-5-4) RR-2, IP43 (III-11-5)

VR-29 No Change - Ref. Valve Reg: RR-1, IP22 (Page 111-22-3)

Page 63 RR-3, IP43 (Page 111-11-6)

VR-30 Revised:

RR-1, IE12 (Page 111-14-22)

Page 64 VR-31 Added Page 65 VR-32 Added Page 66 VR-33 Added Page 67 VR-34 Added Page 68 VR-35 Added Page 69 VR-36 Added Page 70 VR-37 Added Page 71 VR-38 Added Page 72

.___.),

Attachment PY-CEI/NRR-0318 L Page 6 of 6 REVISION 1-STATUS /REF.

VR-39 Added Page 73 VR-40 Revised: Ref. Valve Req. CS-1, 1G33 (Page 111-16-4)

Page 74 VR-41.

No Change - Ref. Valve Req. RR-2, IC11 (Page 111-28-7)

Page 75 VR-42 Added Page-76 VR-43 Added Page 77 VR-44 Added Page 78 VR-45 Added Page 79

.