B16111, Forwards Porous Concrete Mock-Up Testing Phase III W/ Containment Mat Concrete

From kanterella
(Redirected from ML20133C132)
Jump to navigation Jump to search
Forwards Porous Concrete Mock-Up Testing Phase III W/ Containment Mat Concrete
ML20133C132
Person / Time
Site: Millstone 
Issue date: 12/31/1996
From: Thayer J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133C136 List:
References
B16111, NUDOCS 9701070045
Download: ML20133C132 (5)


Text

.

Northeast -

Md *'"' """ *

  • 8" ""7 "d' "'"'a, er i

Utilities System -

P.O. Ika 128 -

Waterford, CT 0633,5-0128 i

(203) 447-1791-i 4

l DEC 311996 1

2 Docket No. 50-423 B16111 8.

t U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Response to Request for Additional Information on Erosion of Cement from the Underivino Porous Concrete Drainaoe System By letter dated November 26,1996,- Northeast Nuclear Energy Company (NNEGO) provided responses to NRC questions regarding issues related to the Millstone Unit 3 -

Containment' Basemat concrete. As a followup to commitment B15985-1, NNECO provides in Attachment 2, the Phase lli Containment Basemat Mock-Up Testing Final Report.

Should you have any questions or require additional information please contact Mr.

James M. Peschel at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: Jay K.-Thayer i

Recovery Officer Engineering and Support Services BY:

44cuA V' 0 uvu L Mario Bonaca Director Nuclear Engineering OG0052 gg(,

9701070045 961231 PDR ADOCK 05000423 P

PDR

- OM422-9 REY.1-95 j

i

d f

4 4

i Attachments 1

i cc:

H. J.

Miller, Region i Administrator i

W.D. Travers, Dr., Director, Special Projects

'J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 i

A. C. Ceme, Senior Resident inspector, Millstone Unit No. 3 i

{

}

i a

i 4

l i

\\

4 i

1 Docket No. 50-423 B16111 i

i 1

4 Millstone Nuclear Power Station Unit 3 Response to Request for Addition Information on Erosion of Cement from the Underlying Porous Concrete Drainage System NNECO's Commitments i

December 1996 u

U.S. Nucint Rrgul: tory Commission B16111%ttichm:nt 1\\Pags 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Any other e-hans discussed in the submittal represent intended or planned actions by NNECO.

are described to the NRC for the NRC's information and are not regulatory c...nitments.

Please notify the Manager

- Nuclear Licensing at the Milistone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Commitment Committed Date or Outage None N/A i

i h

Docket No. 50-423 B16111 E

Millstone Nuclear Power Station Unit 3 Response to Request for Addition Information on Erosion of Cement from the Underlying Porous Concrete Drainage System

)

Phase ill Containment Basemat Mockuo Testino Final Report i

I l

December 1996 1

_ _ _ _ _ _ - _ _ _ _ _ -.