c i
- y. ? - A l
G Boston Edison Pilgnm Nuclear Power Station 1
Rocky Hill Road i
Plymouth, Massachusetts 02300 i
l December 23, 1996 E. T. Boulette, PhD BECo Ltr # 96-108 i
Senior Vice President-Nuclear U.S. Nuclear Regulatory Commission i
Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 Core Operatina Limits Reports The attached revision of Pilgrim's Core Operating Limits Report is submitted in accordance with I
the requirements of Pilgrim's Technical Specification 6.9.A.4.d.
Revision #11D provides cycle-specific limits for operating Pilgrim with reduced feedwater temperatures during the remainder of cycle #11.
OY L
i E. T. Boulette, PhD i
PMK\\dmc\\ rap 96\\colr
[
Attachment:
Pilgrim Nuclear Power Station Core Operating Limits Report I
cc: Mr. Alan Wang, Project Manager Division of Reactor Projects - 1/11 Mail Stop: 14B2 U.S. Nuclear Regulatory Commission l
1 White Flint North 1
11555 Rockville Pike Rockville, MD 20852 1
U.S, Nuclear Regulatory Commission Region 1
/
475 Allendale Road I
KOf /f King of Prussia, PA 19406 Senior Resident inspector i
Pilgrim Nuclear Power Station 9701020133 961223 PDR ADOCK 05000293 p
PDR 61U1iU