PY-CEI-NRR-0354, Forwards,For Review,Procedure PAP-1602, Post-Reactor Scram Evaluation, Per Generic Ltr 83-28 Re ATWS

From kanterella
(Redirected from ML20132D383)
Jump to navigation Jump to search
Forwards,For Review,Procedure PAP-1602, Post-Reactor Scram Evaluation, Per Generic Ltr 83-28 Re ATWS
ML20132D383
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 09/23/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20132D388 List:
References
GL-83-28, PY-CEI-NRR-0354, PY-CEI-NRR-354, NUDOCS 8509300157
Download: ML20132D383 (1)


Text

,

o THE CLEVELAND ELECTRIC ILLUMIN ATING COMP ANY P.o. box 5000 - CLEVELAND, oHlo 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLOG - 55 PUBLICSoVARE Semng The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCUAR September 23, 1985 PY-CI;I/NRR-0354 L Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Generic Letter 83-28 Anticipated Transients Without Scram - ATWS

Dear Mr. Youngblood:

In our letter dated August 28, 1985 we identified PNPP procedure PAP-1602 as the procedure containing the details of our post-trip review program. This letter transmits ac uncontrolled copy of that procedure for your review. PAP-1602 will be updated and chsnged as necesaary throughout the life of the plant and vill be available for future review at the site.

Please feel free to contact me if you have any comments 3r ConcelnS.

Very truly yours,

/h4 twt 4 Murray R. Edelman Vice President Nuclear Group MRE:njc cc: Jay Silberg, Esq.

John Stefano (2)

J. Grobe f-N 8509300157 850923 h0

{DR ADOCK 05000440 PDR I