Text
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
S GULF ST)1TES UTILITIES C O nfP21 N Y
~,w w A m msumaiu m c uwo e use* mn Afif A ( 4.01 U34
( M (J A4 346 F841 February 1 7, 1993 RBG. J8,150 File No. G9.5 U. S. Nuclear Regulatory Conunission Document Contml Desk Washington, D.C. 20555 River Bend Station - Unit 1 Docket No. 50-458 Gentlemen:
By letter dated hiay 2,1991 (RBG-34939), Gulf States Utilities Company (GSU) submitted for review and apprc, val Topical Repon EA-FT-91-0003-ht, entitled
" River Bend Station Plant Transient Analysis Methodology". As a result of the staff review of this submittal, a taimber of items requiring additionalinfonnation (second set of questions) were identified and transmitted to GSU by letter dated December 22,1992 (RBC-43190). Please find attached the responses to those items.
If you have any questions or desire additional information, please call hir. L. L.
Dietrich of my staff at (504) 381-4866.
Sincerely,
/,[.bcd/
J. E. Booker hianager - Safety Assessment and Quality Verification River Bend Nuclear Group Attachment 4.....
220053
,q 9302230200 930217 PDR ADOCK--05000458 I'
P PDR
cc:
U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 NRC Resident Inspector P.O. Box 1051 St. Francisville, LA 70775 Mr. E. T. Baker U.S. Nuclear Regulatory Commission M/S OWFN 13-11-15 11555 Rockville Pike Rockville MD 20S5' Y