JSP-073-92, Submits Supplemental Info to 911022 Application for Amend to License NPF-62,clarifying SR 4.8.3.1.4, Onsite Power Distribution Sys Covering Performance of Channel Functional Test,Per Discussion W/Nrc

From kanterella
(Redirected from ML20128M957)
Jump to navigation Jump to search
Submits Supplemental Info to 911022 Application for Amend to License NPF-62,clarifying SR 4.8.3.1.4, Onsite Power Distribution Sys Covering Performance of Channel Functional Test,Per Discussion W/Nrc
ML20128M957
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/17/1993
From: Jamila Perry
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128M961 List:
References
JSP-073-92, JSP-73-92, U-602095, NUDOCS 9302220416
Download: ML20128M957 (3)


Text

{{#Wiki_filter:_.. liknois Power Company Chnton Power Station P 0 Box 678 Chnton. IL 61727 Tel 217 935-6226 1 J. Stephen Perry J Vice Presecent I U-602095 P(MR UJ - 93( 02-17 )-LP 8E.100a JSP-073-92 i February 17, 1993 10CFR50.90 Docket No. 50 461 Document Control Desk Nuclear Regulstory Commission Washington, D.C. 20555 Subj ect: ClintonPowerStationRevisiontoPrevious\\ySubmitted Proposed Amendment of Facility Operatinn License No. NPF-62

Dear Sir:

By letter dated October 22, 1991 (reference.U-601892), Illinois Power (IP) applied for amendment of Facility Operating License No. NPF-62, Appendix A - Technical Specifications, for Clinton Power Station (CPS). That request consisted, in part, of proposed changes to CPS Technical Specification 3/4.8.3.1, "Onsito Power Distribution Syste ns, Distribution -Operating," to resolve inconsistencies and,emove duplications with Technical Specification 3/4.8.4.3, " Reactor Protection System Electric Power Monitoring." Included in that request was a proposed change to Surveillance Requirement 4.8.3.1.4 to remove duplication with Surveillance Requirement '+.8.4.3.b. However, as proposed, revised Surveillance Requirement 4.8.3.1.4 is potentially confusing. The change to Surveillance Requirement 4.8.3.1.4 proposeEl iT IP's October 22, 1991 request consisted of deleting the requirement to perform a CHANNEL CALIBRATION of the RPS Solenoid Bus Power Monitors because this is redundant to the requirements of Surveillance Requirement 4.8.4. 3.b. However, as it was proposed to be. revised, Surveillance Requirement 4.8.3.1.4 would continue to require the . performance of a CHANNEL CALIBRATION of the RPS Soleniod Bus power supply Regulating Transformers. -Per Definition 1.4 of the CPS Tech'nical' Specifications, a CHANNEL CALIBRATION requires the performance of a CHANNEL FUNCTIONAL TEST which requires verification-of channel OPERABILITY, including alarm and/or trip functions and channel failure-trips. Because the RPS Solenoid Bus power supply Regulating Transformers-do not' provide any alarm or trip functions and their' vendor manual does not recommend field adjustment. subsequent to initial installation verification: testing, revised Surveillance Requirement 4.8.3.1.4., as proposed, leads to confusion and is not appropriate. As a result, IP now proposes that Surveillance Requirement 4.8.3.1.4-be l deleted-in.its entirety. This supplement is being provided as l previously-discussed with the NRC Project Manager.for CPS. 9302220416s930217 Dft ALC,CK 0500 1 ) 1 _,.s -- - - ~ - - - - " ~ * - " " - - * '

Page 2 of 2 to U-602095 i

  • to this letter provides replacement pages for the affected marked-up pages for Technical Specifications 3/4.8.3.1 and 3/4.8.4.3 contained in IP's October 22, 1991 request (i.e., pages 7 through 11 of Attachment 2 to U-601892).

The additional changes being proposed by this supplement are identified by double change bars. Further, an affidavit supporting the facts set forth in this letter and its attachments is provided in Attachment 1, IP has reviewed the Basis for No Significant Hazards Consideration contained in IP's October 22, 1991 amendment request and has concluded that the additional changes contained in this supplement do not alter 4 the bases or conclusions provided in those assessments. Additionally, the changes contained in this supplement do not alter IP's determination that the proposed changes meet the criteria given in 10CFR51.22(c)(9)- for a categorical exclusion from the requirement for an Environmental Impact Statement. Sincerely yours. 4 J. S. Perry Senior Vice resident 1 DAS/mfm Attachment i cc: NRC Clinton Licensing Project Manager NRC Resident Office Regional Administrator, Region III, USNRC Illinois Department of Nuclear Safety 4 J 1 f 4 ') - J

i 4 l to U 602095 i-0 i {.. 4 STATE OF ILLINOIS COUNTY OF DEWITT j. i -J. Stephen Perry,.being first duly sworn, deposes and says: That.he is l Senior Vice President of Illinois Power Cortpany; that the application I. t I for amendment'of Facility Operating License NPF-62 has been prepared 1 j. under his supervision and direction;'that he knows the contents thereof;- ?i f and that to the best of_his knowledge and belief said. application and j' the facts contained therein are true and correct. 4 ( 3 l DATE: This-l ~7 day of, February,^1993, !i - Signed: D \\h J, Step)enP'erry_-{ i Subscribed and sworn to before -me this_ ffhy of_- February; 1993, i )Y.c -st [

/

Notary Public. [

9

."0FFICIAL SEAL" l t ' 1-tinda S. French lc 0l>: - Notary Public, State of IWnois. My Ccemission Expires 9/1/96 4 l _L :::::: ::l 4F-f:. e F~ r=*?'r0 4 e'r 5 (*-*'r*--'m"'V r + " TF 'P M 8 ** " " * *?' 'T'*~"T 4

          1. T#''

"P'

  • '#'***P****"*#'#'"'

'~#""# '}}