HL-2985, Forwards Rev 0 to Ei Hatch Nuclear Plant Unit 2,Core Operating Limits Rept for Operating Cycle 11

From kanterella
(Redirected from ML20128E750)
Jump to navigation Jump to search
Forwards Rev 0 to Ei Hatch Nuclear Plant Unit 2,Core Operating Limits Rept for Operating Cycle 11
ML20128E750
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/02/1992
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128E754 List:
References
HL-2985, NUDOCS 9212080172
Download: ML20128E750 (2)


Text

,,

}f k

'Jootgia Power conparty.

<2 40 hwemess Center Parkwey LO

6 Post Offce Box 1295 Bim9ngham, Alabama 3s301_

f f.-

' TeWene 205 377 7279.. *

J. 7, Beckham, Jr..

. Ge()rgiti Pc))ver Vice Pre $ dent Nudear Hatch Project -

1% FA#ern ear!re sywem

)

a HL-2985 004182 December 2, 1992 U.S. ' Nuclear Regulatory Commission AT1N:' Document Control Desk Washington, D.C.

20555 PLANT HATCH - UNIT 2 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 CYCLE 11 CORE OPERATING LIMITS REPORT Gentlemen:

By Amendment 106 to the Unit 2 Technical Specifications.,

the NRC authorized relocation-o_f certain fuel-related limits from the Technical Specifications.to the adjunct Core Ooerating Limits Report (COLR)..

This letter. transmits an information copy of Revision 0 of the. Core Operating Limits Report for Hatch 2. Cycle 11.

If changes'to the core. operating limits contained in. this report.are required during the operating cycle, a: complete reviseo COLR will be issued and the appropriate procedures revised, if there are any questions regarding this report, please contact this office at any time.

-Sincerely,'

[b&~

. T. Beckham, Jr.

.MCh cr i

Enclosure:

Unit 2 Cycle-ll Core Operating-Limits Report

.cc: (See next page.')'

y c

070002:

0N w.

0

.mo.Omemer PDR ADOCK 05000366.

7

-p, PDR y

1 hf h q3 _

s

t Georgia Power d U.S. Nuclear Regulatory Commission Dncember 2, 1992 Page Two cc:

Georaia Powtr Compa.ny Mr. H. L. Sumner, General Manager - Nuclear Plant (w/o encl.)

NORMS (w/o encl.)

U.S. Nuclear Reallatory Commission. WadLhinaton. 0.C2 Mr. K. Jabbour, Licensing Project Manager - Hatch LS. (Lyclear Regulatory CommissionmReaion ]

Mr. S. D. Ebneter, Regional Administrator (w/o encl.)

Mr. L. D. Wert, Senior Resident inspector - Hatch 004182