Forwards Revs 3 & 4 to COLR, Reflecting Increase in Allowable Peak Linear Heat Rate & Decrease in Integrated Radial Peaking Factor Limit,Respectively
ML20128C185
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/25/1993
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20128C189 List:
References
LIC-93-0017, LIC-93-17, NUDOCS 9302030340
Download: ML20128C185 (1)


Text

l S

f Omaha Public Power District-444 South 16th Street Mall 4

Omaha Nebrasko68102-2247 402/636-2000 January 25, 1993 LIC-93-0017 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station PI-137 Washington, DC 20555

Reference:

Docket No. 50-285 Gentlenien:

SUBJECT:

Transmittal of Fort Calhoun Station (FCS) Cycle 14 Core Operating Limit Report (COLR) - Revision 3 and Revision 4 In accordance with FCS Technical Specification 5.9.5, attached are copies of Revision 3 and Revision 4 to the FCS Cycle 14 COLR, The COLR was updated twice during the last quarter of 1992. For your convenience, these two revisions are being transmitted concurrently.

~

In Revision 3, dated November 16, 1992, the allowable peak linear heat rate was increased to 15.5 kW/ft.

In Revision 4, dated December 17, 1992, the allowable peak linear heat rate was revised to decrease the integrated radial peaking factor F/ limit from 1.79 to 1.76.

If you should have any questions, please contact me.

Sincerely, A& N W. G. Gates Vice President WGG/grc Attachments (2) c:

LeBoeuf, Lamb, Leiby & MacRae J. L. Milhoan, NRC Regional Administrator, Region IV R. P. Mullikin, NRC Senior Resident Inspector S. D. Bloom, NRC Project Manager 9302030340 930125 PDR ADOCK 0S000285 P

PDR ni I