LIC-93-0017, Forwards Revs 3 & 4 to COLR, Reflecting Increase in Allowable Peak Linear Heat Rate & Decrease in Integrated Radial Peaking Factor Limit,Respectively
| ML20128C185 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 01/25/1993 |
| From: | Gates W OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20128C189 | List: |
| References | |
| LIC-93-0017, LIC-93-17, NUDOCS 9302030340 | |
| Download: ML20128C185 (1) | |
Text
l S
f Omaha Public Power District-444 South 16th Street Mall 4
Omaha Nebrasko68102-2247 402/636-2000 January 25, 1993 LIC-93-0017 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Mail Station PI-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gentlenien:
SUBJECT:
Transmittal of Fort Calhoun Station (FCS) Cycle 14 Core Operating Limit Report (COLR) - Revision 3 and Revision 4 In accordance with FCS Technical Specification 5.9.5, attached are copies of Revision 3 and Revision 4 to the FCS Cycle 14 COLR, The COLR was updated twice during the last quarter of 1992. For your convenience, these two revisions are being transmitted concurrently.
~
In Revision 3, dated November 16, 1992, the allowable peak linear heat rate was increased to 15.5 kW/ft.
In Revision 4, dated December 17, 1992, the allowable peak linear heat rate was revised to decrease the integrated radial peaking factor F/ limit from 1.79 to 1.76.
If you should have any questions, please contact me.
Sincerely, A& N W. G. Gates Vice President WGG/grc Attachments (2) c: