RBG-21034, Suppls 850503 Response to Violations Noted in Insp Rept 50-458/84-35.Supplemental Commitment Dates for Significant Deficiencies Re Emergency Planning Provided
| ML20127E578 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 05/17/1985 |
| From: | Booker J GULF STATES UTILITIES CO. |
| To: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20127E541 | List:
|
| References | |
| RBG-21034, NUDOCS 8506240591 | |
| Download: ML20127E578 (2) | |
Text
, p >.,
GULF STATES UTILITIES COMPANY DEAUMONT, TEXAS 77704 POST OFFICE HOX 2951 AREA CODE 713 030-0631 May 17, 1985 REG-21034 File Code G9.5 G9.20.6.22 G15.4.1 Mr. Robert D. Martin, Regional Administrator b@@
U. S. Nuclear Regulatory Comission j
Region IV, Office of Inspection and Enforcement
,gg 611 Ryan Plaza, Suite 1000 Arlington, TX 76011
. //
Dear Mr. Martin:
River Bend Station-Unit 1 Refer to: Region IV Docket No. 50-458/ Report 84-35 In response to a request from Mr. J. B. Baird, NRC Region IV, enclosed is supplemental information to our response (RBG-20894 dated May 3,1985) to Inspection Report 84-35 findings. This information replaces the terms " fuel load" and " prior to exceeding five percent power" with specific dates for the deficiencies indicated in the enclosure.
Sincerely,
/,{ d A
J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group JEB/W O/
r/df Enclosure cc Mr. E. L. Jordan, Director Division of Emergency Preparedness & Engineering Response Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8506240591 850618
/
PDR ADOCK 05000458 Q('f /%)
G PDR
/JU J
,.l
- jl W Gulf States Utilities Company River Bend Station Emergency Planning Supplemental Commitment Dates on Significant Deficiencies Deficiency No.
Subject Date 458/8435-05 Augmentation Drill July 12 458/8435-24 TSC Records Room Document Update June 14 458/8435-25 (1) Turnover to GSU Ventilation System in TSC June 7 (2) Turnover to GSU Continuous Air June 19 Monitors (3) Appropriate Procedures for Operation of Air Monitors June 14 458/8435-44 (1) Turnover to GSU Fire Detection System June 14 River Water Make-up Structure for Fire Detection System July 12 (2) Turnover to GSU Main Control Room Instrumentation used in Classifying Emergencies June 19 458/8435-46 Prompt Notification System Testing May 29 458/8435-73 Addition of Speakers to Gaitronics System July 12 458/8435-84 Turnover and Testing of Security System July 12 458/8435-85 Accountability Drill July 12 458/8435-102 Transient Public Information Distribution July 12
)
I
- Significant Deficiencies 458/8435-45 and 458/8435-46 were reversed'as identified in the GSU response dated May 3, 1985.
)
'