TMI-20-006, Notification of Revision of Commitment for Amended Post-Shutdown Decommissioning Activities Report (PSDAR) for Three Mile Island, Unit 2 in Accordance with 10 CFR 50.82(a)(7)

From kanterella
(Redirected from ML20066F494)
Jump to navigation Jump to search
Notification of Revision of Commitment for Amended Post-Shutdown Decommissioning Activities Report (PSDAR) for Three Mile Island, Unit 2 in Accordance with 10 CFR 50.82(a)(7)
ML20066F494
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/02/2020
From: Halnon G, Gerard van Noordennen
EnergySolutions, GPU Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TMI-20-006
Download: ML20066F494 (3)


Text

~ {t;pu ENERGYSOLUTIONS NUCLEAR March 2, 2020 10 CFR 50.51 TMl-20-006 10 CFR 50.82(a)(7) 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN; Document Control Desk Washington, DC 20555-0001

Subject:

Notification of Revision of Commitment for "Amended Post-Shutdown Decommissioning Activities Report" (PSDAR) for Three Mile Island, Unit 2 in Accordance with 10 CFR 50.82(a)(7)

Three Mile Island, Unit 2 NRC Possession Only License No. DPR-73 NRC Docket No. 50-320

References:

1) LetterTMl-19-112 from Halnon, G.H. (GPU Nuclear, Inc.), and Sauger, J (EnergySolutions) "Application for Order Approving License Transfer and Conforming License Amendments" (ML19325C600) dated November 12, 2019.
2) Letter TMl-19-164 from Halnon, G.H. (GPU Nuclear, Inc.), "Notification of "Amended Post-Shutdown Decommissioning Activities Report" (PSDAR) for Three Mile Island, Unit 2 in Accordance with 10 CFR 50.82(a)(7)"

(ML20013E535) dated December 12, 2019.

The purpose of this letter is to inform the NRC of a change to the time frame associated with fulfilling three commitments delineated in References 1 and 2. The commitments are identified in Attachment 1 along with the revised time frame associated with fulfilling each commitment. Since the commitments are being changed to the post-closing date of the proposed ownership change to TMl-2 Solutions, EnergySo/utions officer approval is indicated as a signatory to this letter.

In accordance with 10 CFR 50.91 (b )(1 ), a copy of this submittal has been sent to the Commonwealth of Pennsylvania.

TMl-20-006 Page 2 of 2 This document contains regulatory commitments as noted in Attachment 1. In the event that the NRC has any questions, please contact Greg Halnon, GPU Nuclear, Inc.

President and Chief Nuclear Officer, at 330-761-4270.

Sincerely, Gregory H. Halnon Gerry van Noordennen President and Chief Nuclear Officer Senior Vice President, GPU Nuclear, Inc. Regulatory Affairs Energy Solutions Attachments: - Proposed Commitment Changes cc with

Attachment:

NRC Project Manager NRC Region I Administrator NRC Resident Inspector Director, Bureau of Radiation Protection, Department of Environmental Protection, Commonwealth of Pennsylvania Chief, Division of Nuclear Safety, Bureau of Radiation Protection, Department of Environmental Protection, Commonwealth of Pennsylvania Chairman, Board of County Commissioners, Dauphin County Chairman, Board of Supervisors of Londondeny Township

ATTACHMENT 1 to TMl-20-006 Page 1 of 1 Proposed Commitment Changes The following list identifies Regulatory Commitments committed to by FirstEnergy and EnergySo/utions in references 1 and 2. The time frame associated with fulfilling each commitment is revised as depicted in the matrix below. Any other actions discussed in the reference 1 and 2 submittals represent intended or planned actions by FirstEnergy and/or EnergySolutions. They are described only as information and are not Regulatory Commitments. Please notify Greg Halnon, GPU Nuclear, Inc. President and Chief Nuclear Officer, at 330-761-4270 of any questions regarding this document or associated Regulatory Commitments.

TYPE SCHEDULED REGULATORY COMMITMENT ONE-TIME CONTINUING COMPLETION (Note 1)

ACTION COMPLIANCE DATE TMl-2 Solutions will submit a plan for X Prior to Closing management of Debris Material 90 days Post-Closing Post-Closina. ~::- -:.-:: .. : ~:-::: t,.!~':'.

TYPE SCHEDULED REGULATORY COMMITMENT ONE-TIME CONTINUING COMPLETION (Note 2)

ACTION COMPLIANCE DATE TMl-2 Solutions will submit an updated X Prior to Closing PSDAR 90 days Post-Closing. feF Fevie1.v, Post-Closing to be made effective upon implementation of tl=te lieense tFansfeF.

TMl-2 Solutions will submit a plan for X Prior to Closing management of Debris Material 90 days Post-Closing Post-Closina. ~=-- *-: :::*: :: ~:--:= t..!'""':::.

Note 1-This commitment was originally transmitted to the NRC via Letter TMl-19-112 from Halnon, G.H. (GPU Nuclear, Inc.), and Sauger, J (EnergySolutions) "Application for Order Approving License Transfer and Conforming License Amendments" (ML19325C600) dated November 12, 2019.

Note 2-These commitments were originally transmitted to the NRC via Letter TMl 164 from Halnon, G.H. (GPU Nuclear, Inc.), "Notification of "Amended Post-Shutdown Decommissioning Activities Report" (PSDAR) for Three Mile Island, Unit 2 in Accordance with 10 CFR 50.82(a)(7)" (ML20013E535) dated December 12, 2019.