Forwards Rev 16 to Technical Requirements Manual.
ML20029D069
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/28/1994
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20029D070 List:
References
TXX-94125, NUDOCS 9405030400
Download: ML20029D069 (6)


Text

-m .x .

h

'=== =

_ Log # TXX-94125 9 Fi1e # 10010

-_, .-- 916 (TRM) r r Ref. # 10CFR50.36 1UELECTRIC wimam J. c.hm, Jr. I O' N Gremp Vice President U. S. Nuclear Regulatory Commission Attn: Document Control Room Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF TECHNICAL REQUIREMENTS MANUAL (TRM)

REVISION 16 Gentlemen:

TU Electric herewith submits Revision 16 (enclosed) of the CPSES Technical Requirements Manual (TRM). Enclosed are the following documents:

Technical Requirements Manual 1 signed original Revision 16 and 10 copies The attachment contains a page-by-page description of the changes. As has been the TV L1ectric practice in the past several TRM revisions, all changes described in the attachment have been evaluated for relative significance (i.e., the group number 1, 2, 3, or 4 corresponds to each change justification as discussed in TV Electric letter TXX-88467 dated June 1, 1988). In addition, all changes applicable to CPSES Units 1 and 2 have been reviewed under the TV Electric 10CFR50.59 process and found not to include any "unreviewed safety questions".

TRM Revision 16, dated May 11, 1994, was issued on April 28, 1994, and will become effective at 1201 a.m. CST on May 11, 1994.

)

l

(.j [ 7 )

9405030400 940428 PDR ADDCK 05000445 400 N. Olive Street LB. 81 Dallas. Tens 75201 P PDR

"" ' ' ' ^^~~ ~ ~ ' ~ ~"' ~ "' "' ~ ^ ' ' '

rf. . ; .:

M a

t 3XX 94125

' Page 2 of 2 'l i

! 2 If you should have any questions, please contact Mr. Jacob M. Kulangara at ,;

(214) 812-8818. -

Sincerely, William J. Cahill, Jr.

i By: I6TZ ~i D. R. Woodlan

  • Docket Licensing Manager JMK/jmk .. ,

Attachment Enclosure c- Mr L. J. Callan, Region IV Mr. B. Splitzberg, Region IV (1) -i Mr. T. A. Bergman, NRR Resident Inspectors, CPSES (2) l

l i

'l

)

i I

a Atta'chment to TXX-94125

-April 28, 1994 Page 1 of 2 CPSES TECHNICAL REQUIBEMENTS MANUAL (TRM)

AMENDMENT / REVISION 16 DETAILED DESCRIPTION TR Page (as amended) Group Description >

'4-21 4 Removes breaker type THFK from the surveillar.ce requirements for breaker in panel 2EB2-2. .

Editorial  : j This is an editorial correction to identif'r the, i

correct breaker type for surveillance, applicable.in l the plant. J Change. Request Number  : TR-94-1.2

  • Commitment Register Number ;

Related SER : 8.4.1 SSER :  ;

SER/SSER Impact  : No [

l 4-21 2 See Sheet No(s) :28 'l Adds a note that the breakers 2SCCP1, 2EB4-1 and BT-2EB24 are being replaced by devices in'section 4.3 (i.e primary and backup breakers in panel board-2B10-1-2) for Containment Polar-Crane.CP2-MESCCP-01' 1 power supply. Also adds to the' note that the )

breakers 2SCCP1, 2EB4-1-and BT-2EB24 are not j containment penetratic a overcurrent protective devices-once the conuuctor is de-terminated at its--

power source ~outside the containment and the devices associated with that conductor will no longer be j required to be OPERABLE. Adds to surveillance  ;

requirements, primary and backup breakers in panelboard 2B10-1-2.for the Containment Polar Crane power supply with a note'that these devices will -j become containment penetration' conductor overcurrent protective devices when.the conductors associated with these devices are terminated on the l respective panelboard as part of the design j modification DM-93-056. j Addition  :

Plant support power system.is to be made available.  ;

to the' equipment during outage periods to" keep the.

' equipment functional, since the other-power sources are occasionally required to be out of service to y support outage activities. -The plant. support power system is not susceptible'to being shutdown during a refueling operations. The new power system-configuration is considered a'more reliable power ,

supply to the equipment during these periods.  !

Change Request Number'  : TR-94-1.1 Commitment Register Number :

L Related SER : 8.4.1 SSER :

SER/SSER Impact-  : No 4-22 2 See Sheet Nc(s) :23 and 28 Adds a note that the breakers for Containment

F . .- ,

Atta'chment to TXX-94125

' April 28, 1994 Page 2 of 2 TR Page (as amended) Group Description Lighting Transformer CP2-ELTRNT-14, Fuel Manipulator i Crane TCX-FHSCMC-01 and Fuel Transfer Reactor Side Control Panel TCX-THSTTS-02 in MCC 2EB1-2 are being replaced by devices listed in section 4.3 (i.e primary and backup breakers in panelboard 2B10-1 1) for the respective equipment power supply. Also adds to the note that once the conductor is de-terminated from its power source outside the containment, the devices associated with that conductor are no longer containment penetration overcurrent protective devices and thereafter not required to be OPERABLE. Adds to the surveillance requirements, primary and backup breakers in panelboard 2B10-1-1-1 for CP2-ELTRNT-14, TCX-THSCMC-01 AND TCX-FHSTTS-02 power supply with a note that these devices will become containment penetration conductor overcurrent protective devices when the conductors associated with these devices are terminated on the respective panelboard as part of the. design modification DM-93-056.

Addition  :

See justification for TR-94-1.1.

Change Request Number  : TR-94-1.3 Commitment Register Number :

Related SER . 8.4.1 SSER :

SER/SSER Impact  : No 4-23 2 See Sheet No(s) :24 and 28 Adds a note that the breakers for the Containment Elevator CP2-MEELRB-01 and Containment Welding Receptacles in MCC 2EB2-2 are being~ replaced by devices listed in section 4.3 (i.e primary and backup breakers in panelboard 2B10-1-2) for the respective equipment power supply. Also adds to the note that once the conductor is de-terminated from its power source outside the containment, the associated devices are no longer containment penetration conductor overcurrent protective devices and thereafter these are not required to be OPERABLE. Adds to surveillance requirements, primary and backup breakers in panel board 2B10-1 for CF2-MEELRB-01 and the Containment Welding Receptacles power supply with a note that these devices will become containment penetration conductor overcurrent protective devices when these i devices are terminated on the respective panelboard as part of the design modification DM-93-056.

Addition  :

See justification for TR-94-1.1.

Change Request Number  : TR-94-1. 4 Commitment Register Number

  • Related SER : 8.4.1 SSER :

SER/SSER Impact  : No

a ,

.m... _

4

+ I. .e

- -.3 1

3 1

_');

.-J, e

) .

v,

'4 i

i i

u .

4

'l 1

1 ENCLOSURE TO TXX-94125 ,

'1 4

1 i

' i 1

ei ]

j I

a

,b .

1 J

[

i 4'

2 j.

4 )

4 2

m 1

-.., --, m - , <_., ,. -

1

-. - , , ~ . . .J-. +. .-

n,

. . COMANCHE PEAK STEAM ELECTRIC STATION UNITS -1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

INSTRUCTION SHEET (Page1of1) '

The following instructional information and checklist is being furnished to help insert Revision 16 into the Comanche Peak Steam Electric Station TRM. A description of this revision is provided in TXX-94125, dated April 28,1994.

Discard the old sheets and insert the new sheets, as listed below. Keep all instruction sheets in the front of the Effective Page Listing to service as a record of changes.

Remove Insert Section 4 4-21 through 4-25 4-21 through 4-25 4-27 through 4-32 4-27 through 4-32 List of Effective Pages EPL-1 and EPL-4 EPL-1 and EPL-4

..