Updated LER 82-044/03X-1:on 820813,while Venting Nuclear Boiler Instruments,Several ECCS Initiations Occurred.Caused by Procedural Inadequacy.Plant Procedure 07-S-13-23 Written & Approved
ML20028G693
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 02/09/1983
From: Rohrer M
MISSISSIPPI POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20028G691 List:
References
LER-82-044-03X, LER-82-44-3X, NUDOCS 8302170311
Download: ML20028G693 (2)


Text

pg , Update Report - Previous Rsport Date 9/13/82 U. S. NUCLE AR RE!ULATC RY COMMISSION

'" * ' ^ '

UCENSEE EVENT REPORT e 2 CONTROL BLOCK: l 1

l l l l l lh 6

(PLEASE PRINT OR TYPE ALL REObiRED INFORMATION) foT 18 I9 s I SLICENSEE I c I cCODE I S I i14l@l150 l 01 l 010101010 l LICENSE NUMBER 101025l@l_411 26 11 l111 l@l57 CAT LICENSE TYPE JO l l@

68 7

CON'T 7

o 1 8

SERN 80 dl 061 l 5 l 0DOCKET l 0 NUMBER l 0 l 4 l 1 68l 6 69l@l EVENT 0 l 8DATEl 1 l 3 l 875l 2 hl 74 REPORT0 DATE l 2 l 0 80l 4 l 8 l 't Ih EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h o 2 lWhile. venting nuclear boiler level instrumonts. severn1 FCC9 inirintinne e nnic n1nco i I

p idue primarily to procedural inadeauncy. All 3 divisional diesel cenerators were I

o 4 lplaced in the naintenance mode to prevent their starting, and run.,f ng whf i n vone ing o s l continued. The cction statements of T.S.3.8.1.2.were.entere.d. .The diesel I I

l'OTe1 Igenerators remained in the maintenance mode for 8.5 hourn.

At nny rimo had tho l

lo17l l diesel generators been reauired to run they would have been restored to onornhin l eIe l l status. 80 DE CODE S 8C E COMPONENT CODi SUB DE 5 E Q l E l E lh Wh [h l I l Nl S l T l R ! U lh [,,E_,jh lfe,_j h 12 13 18 19 20 7 8 9 10 11 REVISION SEQUENTIAL OCCURRENCE REPORT REPORT NO. CODE TYPE NO

  • EVENT YEAR h ,R Pg LER RO 8 l2 l [--j l 014l 4l @ l013l (,X_j [---j W

_ l21 22 23 24 26 27 N M 30 31 32 HOURS S8 iT POR 8. SUPPLI MANUFACTURER KEN A N ON PL NT METH QJ@

33 34 y@

35 (Z_j@

36 l0l0l0l0l 37 40 W@

di

[_N_j@

42 W@

43 l44R l 3 l 6 l 947l@

CAUSF DESCRIPTION AND CORRECTIVE ACTIONS h l A procedure had not been written for filline and ventina level instrumentation at i i o I

i i lthe time of this event. A temporary directive was used instead and uns annnvenety l

i 7 l deficient. A permanent plant procedure. 07-S-13-23. has been written and anoroved 1 l l'T]T] l for further checking of vessel level instrumentation. No further action is necessarv.l l

I

( i 4 1This is a final report.

80 l 7 8 9

% POWER OTHER STATUS DIS O R DISCOVERY DESCRIPTION ST $

NA l 1 5 W h l0 l0 l0 l @l NA l W @l ACTIVITY CO TENT AVOUNT OF ACTIVITY LOCATION OF RELE ASE RELEASED OF RELE ASE NA l l NA l 1 6 @ [_Z_j @ l 45 80 7 8 9 10 11 44 PERSONNEL EXPOSURES NUMB E R TYPE DE SCRIPTION 1 7 l0l0l0j@ W @l NA l

PERSONNE L iN3uViES NUMBER DESCRIPTION @

t a l0l0l0j@l NA l

55,5 ' " $C E

^k'P5N '^"" @ $ggagfggpojo8$

% W@l 7 8 9 10 NA S 80 l

PU8ucity NRC USE ONLY

  • IS$yE D DESCRIPTION l l l l l l l l l l l l l *g t

{ 7 2 o 8 9 UNhl 10 NA l 68 69 80 5 0

i Original Sinned by Matthou V - knbre r PHON E- $

l NAME OF PREPARER

r 'e Attrchscnt to AECM-83/0089 Page 2 of 2 SUPPLEMENTARY INFORMATION TO LER 82-044/03 X-1 Mississippi Power & Light Company Grand Gulf Nuclear Station - Unit 1 Docket No. 50-416 Technical Specification Involved: 3.G.I.2 Reported Under Technical Specification: 6.9.1.13.b Event Narrative:

This is an update to a previous report submitted on September 13, 1982. The following paragraphs describe the event.

Vessel fill, after sensor installation work, commenced at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on August 13, 1982, using CRD pumps. This was signed off in Temp Directive 04-1-01-B21 Temp 1 step 5 after clearing Brown Tag clearance 3446. Level-was to be raised to normal level (30" to 40"). The decision to start clearing red tag 4428 prior to returning the RPV level transmitters to service was directed by management through operations in order to expedite the closing of the temporary directive in preparations for CRD friction testing. The ECCS pump breakers were to remain racked out until the RPV icvel instrumentation was completed. These actions were implemented without appropriate changes and reviews of the temporary directive. At 1415, red tag 4428 was cleared and ECCS breakers and valves were returned to service. At this time RPV level was being monitored on B21 LT N691B. Level was read at 1340 hours0.0155 days <br />0.372 hours <br />0.00222 weeks <br />5.0987e-4 months <br /> at -50 inches using this instrument.

At 1845 the shift superintendent requested I & C to begin valving in RPV level instrumentation per step 6 of the temp. directive. .This action led to the ECCS initiation at 2104 on August 13, 1982.

Corrective action initiated in the previous report has been completed. A permanent procedure for filling and venting vessel level instruments and returning them to service in an orderly and controlled manner has been written. The procedure, 07-S-13-23, was approved and issued November 17, 1982. No future action is necessary. This is submitted as a final report.

.