HL-1662, Forwards Rev 0 to Ei Hatch Nuclear Plant Unit 2 Core Operating Limits Rept for Operating Cycle 10
| ML20024H649 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/03/1991 |
| From: | Beckham J GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20024H650 | List: |
| References | |
| 001727, 1727, HL-1662, NUDOCS 9106070254 | |
| Download: ML20024H649 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _
onu o nm, w,
.l~"t
( ' ' M f 'W D f o y' i
A.
cm.
k n
Georgia Power
- um,som..
4 3
n 4,
HL-1662 001727 June 3, 1991 U.S. Nuclear Regulatory Commission ATTH:
Document Control Desk Washington, D.C. 20555 PLANT HATCH - UNIT 2 NRC DOCKET 50-366 OPERATING LICENSE NPf-5
[1C1T 10 CORE OPERATING LIMITS REPORT Gentlemen:
By Amendment 105 to the Unit 2 Technical Specifications, the NRC authorized relocation of certain fuel-related limits from the Technical Specifications to the adjunct Core Operating Limits Report (COLR).
This letter transmits an information copy of Revision 0 of the Core Operating Limits Report for Hatch 2 Cycle 10.
if changes to the core operating limits contained in this report are recuired during the operating cycle, a complete revised COLR will be issued anc the appropriate procedures revised.
If there are any questions regarding this report, please contact this office at any time.
Sincerely,
[&- p-J.T.Beckham,Jrk SRP/cr
Enclosure:
Unit 2 Cycle 10 Core Operating Limits Report cc:
(See next page.)
9106070254 910603 m
(
FDR ADOCK 05000366 I
I
(
P POR
k Georghtibwer JL.
U.S. Nuclear Regulatory Commission June 3 1991 Page Two ec: Ef9Igijl22W1t_C.9E21DY Mr. M. L. Sumner, General Manager - Nuclear Plant Mr. J. D. Heidt, Manager Engineering and Licensing - Hatch NORMS U.S. Nuclear Reaulatory Commission. Washinaton. At Mr. K. Jabbour, Licensing Project Manager - Hat (h U.S. Nuclear Regulatory Commission. Reaion 11 Mr. S. D. Ebneter, Regional Administrator Mr. L. D. Wert, Senior Resident inspector - Hatch nws
_