ML20024F739

From kanterella
Jump to navigation Jump to search
Forwards LERs 90-032-00 & 90-033-00
ML20024F739
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/14/1990
From: Lyster M
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20024F740 List:
References
PY-CEI-NRR-1281, NUDOCS 9012170118
Download: ML20024F739 (1)


Text

.- _ _ _ __ _ _ _ _ ____-_-_-___ ___ ____________ _____ __ _

. TM t

PERRY NUCLFAR POWER PLANT W A30'est 10 CENTER ROAD P.O. BOX 97 Michael D. Lyster

PERRY, CHIO 44081 PES.RY OHIO 44081 Vet PresidMt Nacear (216)259 3737 December 14, 1990 PY-CEI/NRR-1281 L U.S. Nuclear-Regulatory Commission Document Control Desk-

-Washington, D.C. 20$$5 Perry Nuclear Power Plant Docket No. $0-440 i LERs90-032 and 033 Dear Sir!

Enclosed are Licensee Event. Reports90-032 and 033 for the Perry Nuclear Power Plant.

Sincerely, (p u-3 Michael D. Lyster HDLICRE:TSHinjc

Enclosure:

LERs90-032 and 033 cc NRR Project Manager Sr. Resident inspector U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 l

l 9012170118 901214 PDR S

ADOCK 05000440 t l PDR operating unas cleveiona Electnc mumating 101000 id6on

[MQ

//r

[ .____ _ _

17 M. _