NRC-90-0045, Forwards Inservice Insp Summary Rept of 1989 Inservice Insp at Fermi 2 Nuclear Power Plant
| ML20012D429 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/13/1990 |
| From: | Sylvia B DETROIT EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20012D430 | List: |
| References | |
| CON-NRC-90-0045, CON-NRC-90-45 NUDOCS 9003270311 | |
| Download: ML20012D429 (1) | |
Text
._
B. Ralph Sylv']
e Senior vice Preonent Edison
~b400 Nu'ttiDiaee H6ghmey are;=-" -"*
March 13, 1990 NRC-90-0045 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555
Reference:
(1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43 (2) Title 10 Code of Federal Regulations, i
Part 50.55 (a)
Subject:
Summary acport_of the 1989 Inservice Inspection Enclosed is the Summary Report of the 1989 Inservice Ispecticn (ISI) activities performed at Detroit Edison Company'r, Fermi 2 Nuclear Power Plant. This report represent.s a summary of the ISI activities from commercial operation (January 23, 1988) through the first sche:!uled refueling outage.
7ht.t. report is being sub:nitted in accordance with ASME Section XI,1980 Edition through 111nter 1981 Addenda.
paragraph Ik'A-67.30.
If the'.*e are any questions, please contact Mr. Bruce Sheffel, ISI Program Harager, at (313) 586-1848.
Sincercly,
,d!Ntf/d b
cc:
A. B. Davis W. G. Rogers hp fg'iq[f R. W. DeFayette J. F. Stang 9g2
- Region III
/
\\
9003270311 900313 F;DR A00CKODOOg>pi
._.